Change Order By Vuuid

Prev Next
Get
/po-rest-api/jersey/v1/purchase-change-order/4E69C7897625FD36E0630B811DAC6604

Get Change Order by UUID (Header + Lines)

Overview

Returns a single PO Change Order — master header and all associated detail lines — identified by its virtual UUID (POCOH_V_UUID).

This API is used when you already know the unique identifier of a change order and need the full record including all line items in one call.

Results are sourced from PO_COMAST_API_V (master header) and PO_COSUMMARY_API_V (detail lines).


Notes

  • The vuuid path parameter is required. A blank value returns 400 Bad Request.

  • If no record is found for the supplied UUID, a 404 Not Found error is returned.

  • Authentication is required to access this endpoint.


UI Navigation

Asset Management → Purchase Orders → Change Orders


View Objects

Section View Object Database View
Header PoComastViewObj PO_COMAST_API_V
Lines PoCodetViewObj PO_CODET_API_V

Finders

Finder Parameter Description
UUID Lookup vuuid (path) Directly identifies the change order header by its virtual UUID (POCOH_V_UUID)

HTTP Method & Endpoint

Method: GET

Endpoint:

/po-rest-api/jersey/v1/po-change-order/{vuuid}


Path Parameters

Parameter Description Example
vuuid Virtual UUID of the change order header (POCOH_V_UUID) 4E69C78976F5FD36E0630B811DAC6604

Query Parameters

Field Type Required Default Description
N/A — — — This endpoint does not accept query parameters

Example Request

/po-rest-api/jersey/v1/po-change-order/4E69C78976F5FD36E0630B811DAC6604


Attributes

The response contains a header object and a lines array.

Header Object (changeOrderHeader)

CMiC UI Fieldname Object Name Description Type Data Length Example Mandatory
PocohVUuid changeOrderHeader pocohVUuid Unique virtual identifier for the change order header String 64 4E69C78976F5FD36E0630B811DAC6604 System Generated
PocohCompCode changeOrderHeader pocohCompCode Company code the change order belongs to String 8 QAT True
PocohCompName changeOrderHeader pocohCompName Full name of the company String 60 QAT Company False
PocohPoNum changeOrderHeader pocohPoNum Parent purchase order number String 20 PO000004 True
PocohNum changeOrderHeader pocohNum Change order number String 10 1 True
PocohReleaseNum changeOrderHeader pocohReleaseNum PO release number Number 10 1 True
PocohBchNum changeOrderHeader pocohBchNum Batch number Number 10 42 False
PocohVenCode changeOrderHeader pocohVenCode Vendor code String 16 AETNA False
PocohVenName changeOrderHeader pocohVenName Vendor full name String 60 Aetna Insurance False
PocohDeptCode changeOrderHeader pocohDeptCode Department code String 6 ADMIN False
PocohDeptName changeOrderHeader pocohDeptName Department name String 60 Administration False
PocohExptdDate changeOrderHeader pocohExptdDate Expected delivery date Date N/A 2024-03-31 False
PocohOrdDate changeOrderHeader pocohOrdDate Date the order was placed Date N/A 2024-01-15 False
PocohRecDate changeOrderHeader pocohRecDate Actual receive date Date N/A 2024-04-05 False
PocohTypeCode changeOrderHeader pocohTypeCode PO type code (e.g. S = Standard) String 1 S False
PocohAdjCode changeOrderHeader pocohAdjCode Adjustment code String 1 A False
PocohStatCode changeOrderHeader pocohStatCode Status code (R = Released, C = Closed) String 1 R False
PocohChgCode changeOrderHeader pocohChgCode Change code String 16 MOD False
PocohTermCode changeOrderHeader pocohTermCode Payment term code String 8 NET30 False
PocohTermName changeOrderHeader pocohTermName Payment term description String 30 Net 30 Days False
PocohInvCode changeOrderHeader pocohInvCode Invoice code String 16 INV001 False
PocohInvDate changeOrderHeader pocohInvDate Invoice date Date N/A 2024-02-01 False
PocohInvDueDate changeOrderHeader pocohInvDueDate Invoice due date Date N/A 2024-03-01 False
PocohInvDiscDate changeOrderHeader pocohInvDiscDate Invoice discount expiry date Date N/A 2024-02-15 False
PocohInvDiscAmt changeOrderHeader pocohInvDiscAmt Invoice discount amount Number 10,2 50.00 False
PocohInvTypeCode changeOrderHeader pocohInvTypeCode Invoice type code String 8 STD False
PocohInvSerCode changeOrderHeader pocohInvSerCode Invoice serial code String 4 SER001 False
PocohCurrCode changeOrderHeader pocohCurrCode Currency code String 3 US False
PocohCurrName changeOrderHeader pocohCurrName Currency name String 30 US Dollar False
PocohCurrConvNum changeOrderHeader pocohCurrConvNum Currency conversion number Number 10,6 1.0 False
PocohFobCode changeOrderHeader pocohFobCode Freight on board code String 8 DEST False
PocohBuyCode changeOrderHeader pocohBuyCode Buyer code String 8 JSMITH False
PocohAddCode changeOrderHeader pocohAddCode Ship-to address code String 10 MAIN False
PocohAddName changeOrderHeader pocohAddName Ship-to address name String 60 Main Office False
PocohAddCompCode changeOrderHeader pocohAddCompCode Address company code String 8 QAT False
PocohAddCompName changeOrderHeader pocohAddCompName Address company name String 60 QAT Company False
PocohBilltoAddCode changeOrderHeader pocohBilltoAddCode Bill-to address code String 10 BILLTO01 False
PocohShplneCode changeOrderHeader pocohShplneCode Shipping line code String 8 FEDEX False
PocohShpmetCode changeOrderHeader pocohShpmetCode Shipping method code String 8 GROUND False
PocohShpinstDesc changeOrderHeader pocohShpinstDesc Shipping instructions description String 240 Handle with care False
PocohShipinstTxt1Code changeOrderHeader pocohShipinstTxt1Code Shipping instruction text code 1 String 8 SI01 False
PocohShipinstTxt2Code changeOrderHeader pocohShipinstTxt2Code Shipping instruction text code 2 String 8 SI02 False
PocohShipinstTxt3Code changeOrderHeader pocohShipinstTxt3Code Shipping instruction text code 3 String 8 SI03 False
PocohShipinstTxt4Code changeOrderHeader pocohShipinstTxt4Code Shipping instruction text code 4 String 8 SI04 False
PocohShipinstTxt5Code changeOrderHeader pocohShipinstTxt5Code Shipping instruction text code 5 String 8 SI05 False
PocohTxt1Code changeOrderHeader pocohTxt1Code Text code 1 String 8 TXT01 False
PocohTxt2Code changeOrderHeader pocohTxt2Code Text code 2 String 8 TXT02 False
PocohDesc1 changeOrderHeader pocohDesc1 Change order description line 1 String 60 Office supplies amendment False
PocohDesc2 changeOrderHeader pocohDesc2 Change order description line 2 String 60 Additional items added False
PocohAdjPrice changeOrderHeader pocohAdjPrice Adjusted price total Number 10,2 1250.00 False
PocohUnadjPrice changeOrderHeader pocohUnadjPrice Unadjusted price total Number 10,2 1200.00 False
PocohCostedCode changeOrderHeader pocohCostedCode Costed code String 1 Y False
PocohRefNum changeOrderHeader pocohRefNum Reference number String 20 REF-2024-001 False
PocohRefDate changeOrderHeader pocohRefDate Reference date Date N/A 2024-01-10 False
PocohReqCode changeOrderHeader pocohReqCode Requisition code String 8 REQ001 False
PocohReqReason changeOrderHeader pocohReqReason Requisition reason text String 240 Price adjustment False
PocohRecCode changeOrderHeader pocohRecCode Receiving code String 1 P False
PocohDefaultRecCode changeOrderHeader pocohDefaultRecCode Default receiving code String 1 F False
PocohWipAccCode changeOrderHeader pocohWipAccCode WIP account code String 8 WIP-01 False
PocohWipAccName changeOrderHeader pocohWipAccName WIP account name String 60 Work In Progress 01 False
PocohWipDeptCode changeOrderHeader pocohWipDeptCode WIP department code String 6 WIPD01 False
PocohWipDeptName changeOrderHeader pocohWipDeptName WIP department name String 60 WIP Department 01 False
PocohComplianceFlag changeOrderHeader pocohComplianceFlag Compliance flag (Y/N) String 1 Y False
PocohJobCompCode changeOrderHeader pocohJobCompCode Job company code String 8 QAT False
PocohJobCompName changeOrderHeader pocohJobCompName Job company name String 60 QAT Company False
PocohJobCode changeOrderHeader pocohJobCode Job code String 16 JOB001 False
PocohJobName changeOrderHeader pocohJobName Job name String 60 Office Renovation False
PocohContactCode changeOrderHeader pocohContactCode Vendor contact code String 8 CONT01 False
PocohVendOrderAddCode changeOrderHeader pocohVendOrderAddCode Vendor ordering address code String 10 VEND-ADDR-01 False
PocohImageFilename changeOrderHeader pocohImageFilename Attached image filename String 60 co_signed.pdf False
PocohAcctDescription changeOrderHeader pocohAcctDescription Account description String 60 Operating Expenses False
PocohDate changeOrderHeader pocohDate Change order date Date N/A 2024-01-15 False
PocohPrintDate changeOrderHeader pocohPrintDate Date the CO was printed Date N/A 2024-01-16 False
PocohReprintDate changeOrderHeader pocohReprintDate Last reprint date Date N/A 2024-02-20 False
PocohPoTotal changeOrderHeader pocohPoTotal Total amount of the purchase change order Number 10,2 37 False
PocohDiscountPct changeOrderHeader pocohDiscountPct Discount percentage Number 6,2 5.00 False
PocohIuCreateDate changeOrderHeader pocohIuCreateDate Record creation timestamp (ISO-8601) Timestamp N/A 2013-11-14T14:25:45-05:00 System Generated
PocohIuCreateUser changeOrderHeader pocohIuCreateUser User who created the record String 30 DA System Generated
PocohIuUpdateDate changeOrderHeader pocohIuUpdateDate Record last update timestamp (ISO-8601) Timestamp N/A 2014-08-18T09:45:37-04:00 System Generated
PocohIuUpdateUser changeOrderHeader pocohIuUpdateUser User who last updated the record String 30 DA System Generated

Lines Array (changeOrderLine)

CMiC UI Fieldname Object Name Description Type Data Length Example Mandatory
PocodVUuid changeOrderLine pocodVUuid Unique virtual identifier for the detail line String 64 A1B2C3D4E5F67890A1B2C3D4E5F67890 System Generated
PocodCompCode changeOrderLine pocodCompCode Company code String 8 QAT True
PocodCompName changeOrderLine pocodCompName Company name String 60 QAT Company False
PocodPoNum changeOrderLine pocodPoNum Parent purchase order number String 20 PO000004 True
PocodNum changeOrderLine pocodNum Change order number String 10 1 True
PocodReleaseNum changeOrderLine pocodReleaseNum PO release number Number 10 1 True
PocodLineNum changeOrderLine pocodLineNum Detail line number Number 10 1 True
PocodSubLineNum changeOrderLine pocodSubLineNum Sub-line number Number 10 0 False
PocodBchNum changeOrderLine pocodBchNum Batch number Number 10 42 False
PocodPoItemType changeOrderLine pocodPoItemType PO item type (I=Inventory, N=Non-stock, F=Free-form) String 1 N False
PocodPoTypeCode changeOrderLine pocodPoTypeCode Purchase order type code String 1 S False
PocodTypeCode changeOrderLine pocodTypeCode Line type code String 1 S False
PocodStatCode changeOrderLine pocodStatCode Line status code String 1 O False
PocodCloseCode changeOrderLine pocodCloseCode Close code String 1 — False
PocodCloseReasonCode changeOrderLine pocodCloseReasonCode Close reason code String 8 — False
PocodLineChgFlag changeOrderLine pocodLineChgFlag Line changed flag (Y/N) String 1 N False
PocodClassCode changeOrderLine pocodClassCode Item class code String 8 OFFICE False
PocodClassName changeOrderLine pocodClassName Item class name String 60 Office Supplies False
PocodItmCode changeOrderLine pocodItmCode Item / product code String 20 PAPER-A4 False
PocodItmName changeOrderLine pocodItmName Item / product name String 60 A4 Copy Paper False
PocodItmtypCode changeOrderLine pocodItmtypCode Item type code String 8 MAT False
PocodItmtypName changeOrderLine pocodItmtypName Item type name String 60 Material False
PocodCiitemtypCode changeOrderLine pocodCiitemtypCode Construction item type code String 8 MAT False
PocodCiitemtypName changeOrderLine pocodCiitemtypName Construction item type name String 60 Material False
PocodWmCode changeOrderLine pocodWmCode Unit of measure code String 4 BOX False
PocodWmName changeOrderLine pocodWmName Unit of measure name String 30 Box False
PocodOrdWmCode changeOrderLine pocodOrdWmCode Order unit of measure code String 4 BOX False
PocodOrdWmName changeOrderLine pocodOrdWmName Order unit of measure name String 30 Box False
PocodInvWmCode changeOrderLine pocodInvWmCode Invoice unit of measure code String 4 BOX False
PocodInvWmName changeOrderLine pocodInvWmName Invoice unit of measure name String 30 Box False
PocodItemWmCode changeOrderLine pocodItemWmCode Item unit of measure code String 4 BOX False
PocodDesc changeOrderLine pocodDesc Line item description String 60 Revised paper order False
PocodExptdDate changeOrderLine pocodExptdDate Expected delivery date Date N/A 2024-03-31 False
PocodRecDate changeOrderLine pocodRecDate Actual receipt date Date N/A 2024-04-05 False
PocodOrdQty changeOrderLine pocodOrdQty Quantity ordered Number 10,4 100.0000 False
PocodLstOrdQty changeOrderLine pocodLstOrdQty Last ordered quantity Number 10,4 80.0000 False
PocodRecQty changeOrderLine pocodRecQty Quantity received Number 10,4 50.0000 False
PocodRectodateQty changeOrderLine pocodRectodateQty Cumulative received quantity Number 10,4 50.0000 False
PocodRejQty changeOrderLine pocodRejQty Quantity rejected Number 10,4 2.0000 False
PocodRejtodateQty changeOrderLine pocodRejtodateQty Cumulative rejected quantity Number 10,4 2.0000 False
PocodClaimQty changeOrderLine pocodClaimQty Claim quantity Number 10,4 0.0000 False
PocodClaimtodateQty changeOrderLine pocodClaimtodateQty Cumulative claim quantity Number 10,4 0.0000 False
PocodInvQty changeOrderLine pocodInvQty Invoiced quantity Number 10,4 25.0000 False
PocodInvtodateQty changeOrderLine pocodInvtodateQty Cumulative invoiced quantity Number 10,4 25.0000 False
PocodPayQty changeOrderLine pocodPayQty Paid quantity Number 10,4 25.0000 False
PocodPaytodateQty changeOrderLine pocodPaytodateQty Cumulative paid quantity Number 10,4 25.0000 False
PocodAllocatedQty changeOrderLine pocodAllocatedQty Allocated quantity Number 10,4 0.0000 False
PocodExptdPriceAmt changeOrderLine pocodExptdPriceAmt Expected unit price amount Number 10,4 12.5000 False
PocodOvrdExptdPriceFlag changeOrderLine pocodOvrdExptdPriceFlag Override expected price flag (Y/N) String 1 Y False
PocodActPriceAmt changeOrderLine pocodActPriceAmt Actual price amount Number 10,4 12.5000 False
PocodAdjPriceAmt changeOrderLine pocodAdjPriceAmt Adjusted price amount Number 10,4 12.5000 False
PocodExtendedAmt changeOrderLine pocodExtendedAmt Extended line amount (qty × expected price) Number 10,2 1250.00 False
PocodCostAmt changeOrderLine pocodCostAmt Cost amount Number 10,2 1000.00 False
PocodStdCostAmt changeOrderLine pocodStdCostAmt Standard cost amount Number 10,2 950.00 False
PocodAvgCostAmt changeOrderLine pocodAvgCostAmt Average cost amount Number 10,2 975.00 False
PocodLstCostAmt changeOrderLine pocodLstCostAmt Last cost amount Number 10,2 960.00 False
PocodCurrCode changeOrderLine pocodCurrCode Currency code String 3 US False
PocodCurrName changeOrderLine pocodCurrName Currency name String 30 US Dollar False
PocodTax1Code changeOrderLine pocodTax1Code Tax code 1 String 8 HST False
PocodTax1Name changeOrderLine pocodTax1Name Tax 1 name String 30 Harmonized Sales Tax False
PocodTax1TaxableFlag changeOrderLine pocodTax1TaxableFlag Taxable under tax 1 (Y/N) String 1 Y False
PocodTax2Code changeOrderLine pocodTax2Code Tax code 2 String 8 — False
PocodTax2Name changeOrderLine pocodTax2Name Tax 2 name String 30 — False
PocodTax2TaxableFlag changeOrderLine pocodTax2TaxableFlag Taxable under tax 2 (Y/N) String 1 N False
PocodTax3Code changeOrderLine pocodTax3Code Tax code 3 String 8 — False
PocodTax3Name changeOrderLine pocodTax3Name Tax 3 name String 30 — False
PocodTax3TaxableFlag changeOrderLine pocodTax3TaxableFlag Taxable under tax 3 (Y/N) String 1 N False
PocodInvTypeCode changeOrderLine pocodInvTypeCode Invoice type code String 8 STD False
PocodRecIntoInvFlag changeOrderLine pocodRecIntoInvFlag Receive into inventory flag (Y/N) String 1 Y False
PocodDeptCode changeOrderLine pocodDeptCode Department code String 6 ADMIN False
PocodDeptName changeOrderLine pocodDeptName Department name String 60 Administration False
PocodIvDeptCode changeOrderLine pocodIvDeptCode Inventory department code String 6 INVDEPT False
PocodIvDeptName changeOrderLine pocodIvDeptName Inventory department name String 60 Inventory Dept False
PocodIvAccCode changeOrderLine pocodIvAccCode Inventory account code String 20 INV-001 False
PocodIvAccName changeOrderLine pocodIvAccName Inventory account name String 60 Inventory Account False
PocodIvCode changeOrderLine pocodIvCode Inventory code String 8 — False
PocodVarDeptCode changeOrderLine pocodVarDeptCode Variance department code String 6 — False
PocodVarDeptName changeOrderLine pocodVarDeptName Variance department name String 60 — False
PocodVarAccCode changeOrderLine pocodVarAccCode Variance account code String 20 — False
PocodVarAccName changeOrderLine pocodVarAccName Variance account name String 60 — False
PocodWipAccCode changeOrderLine pocodWipAccCode WIP account code String 20 WIP-01 False
PocodWipAccName changeOrderLine pocodWipAccName WIP account name String 60 Work In Progress 01 False
PocodWipDeptCode changeOrderLine pocodWipDeptCode WIP department code String 6 WIPD01 False
PocodWipDeptName changeOrderLine pocodWipDeptName WIP department name String 60 WIP Department 01 False
PocodJobCode changeOrderLine pocodJobCode Job code String 16 JOB001 False
PocodJobName changeOrderLine pocodJobName Job name String 60 Office Renovation False
PocodJobCtrlCode changeOrderLine pocodJobCtrlCode Job control code String 8 — False
PocodPhsCode changeOrderLine pocodPhsCode Phase code String 16 PH01 False
PocodPhsName changeOrderLine pocodPhsName Phase name String 60 Phase 1 False
PocodPhsCtrlCode changeOrderLine pocodPhsCtrlCode Phase control code String 8 — False
PocodCatCode changeOrderLine pocodCatCode Category code String 16 CAT01 False
PocodCatName changeOrderLine pocodCatName Category name String 60 Supplies False
PocodCatCtrlCode changeOrderLine pocodCatCtrlCode Category control code String 8 — False
PocodSrcCompCode changeOrderLine pocodSrcCompCode Source company code String 8 QAT False
PocodSrcCompName changeOrderLine pocodSrcCompName Source company name String 60 QAT Company False
PocodLocCode changeOrderLine pocodLocCode Location code String 8 LOC01 False
PocodLocName changeOrderLine pocodLocName Location name String 60 Main Warehouse False
PocodItemLocCode changeOrderLine pocodItemLocCode Item location code String 7 ILOC01 False
PocodItemLocName changeOrderLine pocodItemLocName Item location name String 60 Warehouse A False
PocodEqpCode changeOrderLine pocodEqpCode Equipment code String 16 EQP001 False
PocodEqpName changeOrderLine pocodEqpName Equipment name String 60 Forklift 01 False
PocodEcEqpCode changeOrderLine pocodEcEqpCode Equipment cost equipment code String 16 — False
PocodEcCstCode changeOrderLine pocodEcCstCode Equipment cost cost code String 16 — False
PocodComponCode changeOrderLine pocodComponCode Component code String 16 — False
PocodComponName changeOrderLine pocodComponName Component name String 60 — False
PocodTrancodeCode changeOrderLine pocodTrancodeCode Transaction code String 8 — False
PocodTrancodeName changeOrderLine pocodTrancodeName Transaction code name String 60 — False
PocodShplCode changeOrderLine pocodShplCode Shipment line code String 8 FEDEX False
PocodPmCode changeOrderLine pocodPmCode Project management code String 8 — False
PocodExpCode changeOrderLine pocodExpCode Expense code String 8 — False
PocodWoCode changeOrderLine pocodWoCode Work order code String 8 — False
PocodWDetailCode changeOrderLine pocodWDetailCode Work order detail code String 8 — False
PocodWitmLineNumber changeOrderLine pocodWitmLineNumber Work order item line number Number 10 — False
PocodSiNum changeOrderLine pocodSiNum Sub-item number Number 10 — False
PocodSiLineNum changeOrderLine pocodSiLineNum Sub-item line number Number 10 — False
PocodSiMastJobCode changeOrderLine pocodSiMastJobCode Sub-item master job code String 16 — False
PocodQuoteNum changeOrderLine pocodQuoteNum Quote number Number 10 — False
PocodTendpackCode changeOrderLine pocodTendpackCode Tender package code String 16 — False
PocodTendpackLineNum changeOrderLine pocodTendpackLineNum Tender package line number Number 10 — False
PocodSwoOraseq changeOrderLine pocodSwoOraseq Sub work order sequence number Number 10 — False
PocodOrdTrnNum changeOrderLine pocodOrdTrnNum Order transaction number Number 10 — False
PocodRecTrnNum changeOrderLine pocodRecTrnNum Receipt transaction number Number 10 — False
PocodTxt1Code changeOrderLine pocodTxt1Code Text code 1 String 8 TXT01 False
PocodTxt1Name changeOrderLine pocodTxt1Name Text name 1 String 240 Standard Terms False
PocodTxt2Code changeOrderLine pocodTxt2Code Text code 2 String 8 — False
PocodTxt2Name changeOrderLine pocodTxt2Name Text name 2 String 240 — False
PocodTxt3Code changeOrderLine pocodTxt3Code Text code 3 String 8 — False
PocodTxt3Name changeOrderLine pocodTxt3Name Text name 3 String 240 — False
PocodUserTypeCode changeOrderLine pocodUserTypeCode User-defined type code String 6 STD False
PocodUserField1 changeOrderLine pocodUserField1 User-defined field 1 String 60 — False
PocodUserField2 changeOrderLine pocodUserField2 User-defined field 2 String 60 — False
PocodUserField3 changeOrderLine pocodUserField3 User-defined field 3 String 60 — False
PocodUserField4 changeOrderLine pocodUserField4 User-defined field 4 String 60 — False
PocodUserField5 changeOrderLine pocodUserField5 User-defined field 5 String 60 — False
PocodUserField6 changeOrderLine pocodUserField6 User-defined field 6 String 60 — False
PocodUserField7 changeOrderLine pocodUserField7 User-defined field 7 String 60 — False
PocodUserField8 changeOrderLine pocodUserField8 User-defined field 8 String 60 — False
PocodUserFieldName5 changeOrderLine pocodUserFieldName5 User field name 5 (WBS/TAC) String 60 — False
PocodUserFieldName6 changeOrderLine pocodUserFieldName6 User field name 6 (WBS/TAC) String 60 — False
PocodUserFieldName7 changeOrderLine pocodUserFieldName7 User field name 7 (WBS/TAC) String 60 — False
PocodUserFieldName8 changeOrderLine pocodUserFieldName8 User field name 8 (WBS/TAC) String 60 — False
PocodTavCode1 changeOrderLine pocodTavCode1 TAV code 1 String 16 TAV01 False
PocodTavCode2 changeOrderLine pocodTavCode2 TAV code 2 String 16 — False
PocodTavCode3 changeOrderLine pocodTavCode3 TAV code 3 String 16 — False
PocodTavCode4 changeOrderLine pocodTavCode4 TAV code 4 String 16 — False
PocodWbsvCode1 changeOrderLine pocodWbsvCode1 WBS value code 1 String 16 WBS01 False
PocodWbsvCode2 changeOrderLine pocodWbsvCode2 WBS value code 2 String 16 — False
PocodWbsvCode3 changeOrderLine pocodWbsvCode3 WBS value code 3 String 16 — False
PocodWbsvCode4 changeOrderLine pocodWbsvCode4 WBS value code 4 String 16 — False
PocodWbsvCode5 changeOrderLine pocodWbsvCode5 WBS value code 5 String 16 — False
PocodWbsvCode6 changeOrderLine pocodWbsvCode6 WBS value code 6 String 16 — False
PocodWbsvCode7 changeOrderLine pocodWbsvCode7 WBS value code 7 String 16 — False
PocodWbsvCode8 changeOrderLine pocodWbsvCode8 WBS value code 8 String 16 — False
PocodWbsvCode9 changeOrderLine pocodWbsvCode9 WBS value code 9 String 16 — False
PocodWbsvCode10 changeOrderLine pocodWbsvCode10 WBS value code 10 String 16 — False
PocodWbsvCode11 changeOrderLine pocodWbsvCode11 WBS value code 11 String 16 — False
PocodWbsvCode12 changeOrderLine pocodWbsvCode12 WBS value code 12 String 16 — False
PocodIuCreateDate changeOrderLine pocodIuCreateDate Record creation timestamp (ISO-8601) Timestamp N/A 2013-11-14T14:25:45-05:00 System Generated
PocodIuCreateUser changeOrderLine pocodIuCreateUser User who created the record String 30 DA System Generated
PocodIuUpdateDate changeOrderLine pocodIuUpdateDate Record last update timestamp (ISO-8601) Timestamp N/A 2014-08-18T09:45:37-04:00 System Generated
PocodIuUpdateUser changeOrderLine pocodIuUpdateUser User who last updated the record String 30 DA System Generated
Security
HTTP
Type basic

Basic authentication

Responses
200

OK

Headers
Content-Type
string
Exampleapplication/json
"{\n    \"header\": {\n        \"pocohVUuid\": \"4E69C7897625FD36E0630B811DAC6604\",\n        \"pocohCompCode\": \"QAT\",\n        \"pocohCompName\": \"QA Test Company\",\n        \"pocohPoNum\": \"JP000019\",\n        \"pocohNum\": \"1\",\n        \"pocohBchNum\": 14286,\n        \"pocohVenCode\": \"AETNA\",\n        \"pocohVenName\": \"Aetna Insurance\",\n        \"pocohDeptCode\": null,\n        \"pocohDeptName\": null,\n        \"pocohExptdDate\": \"2013-11-05\",\n        \"pocohOrdDate\": \"2014-07-25\",\n        \"pocohRecDate\": null,\n        \"pocohTypeCode\": \"S\",\n        \"pocohAdjCode\": null,\n        \"pocohStatCode\": \"O\",\n        \"pocohChgCode\": \"O\",\n        \"pocohTermCode\": \"21NE30\",\n        \"pocohTermName\": \"2% Discount Net 30\",\n        \"pocohInvCode\": null,\n        \"pocohInvDate\": null,\n        \"pocohInvDueDate\": null,\n        \"pocohInvDiscDate\": null,\n        \"pocohInvDiscAmt\": 0,\n        \"pocohCurrCode\": \"US\",\n        \"pocohCurrName\": \"US Dollars\",\n        \"pocohFobCode\": null,\n        \"pocohBuyCode\": \"QA3\",\n        \"pocohAddCode\": null,\n        \"pocohShplneCode\": null,\n        \"pocohShpmetCode\": null,\n        \"pocohTxt1Code\": null,\n        \"pocohTxt2Code\": null,\n        \"pocohShpinstDesc\": null,\n        \"pocohDesc1\": null,\n        \"pocohDesc2\": null,\n        \"pocohAdjPrice\": 0,\n        \"pocohUnadjPrice\": 0,\n        \"pocohCurrConvNum\": 1,\n        \"pocohCostedCode\": null,\n        \"pocohRefNum\": null,\n        \"pocohRefDate\": null,\n        \"pocohReqCode\": \"QA3\",\n        \"pocohRecCode\": null,\n        \"pocohReprintDate\": \"2014-06-27\",\n        \"pocohWipAccCode\": null,\n        \"pocohWipAccName\": null,\n        \"pocohWipDeptCode\": null,\n        \"pocohWipDeptName\": null,\n        \"pocohShipinstTxt1Code\": null,\n        \"pocohShipinstTxt2Code\": null,\n        \"pocohShipinstTxt3Code\": null,\n        \"pocohShipinstTxt4Code\": null,\n        \"pocohShipinstTxt5Code\": null,\n        \"pocohReleaseNum\": 1,\n        \"pocohBilltoAddCode\": null,\n        \"pocohReqReason\": null,\n        \"pocohInvTypeCode\": null,\n        \"pocohImageFilename\": null,\n        \"pocohInvSerCode\": null,\n        \"pocohVendOrderAddCode\": \"AD1\",\n        \"pocohComplianceFlag\": null,\n        \"pocohJobCompCode\": \"QAT\",\n        \"pocohJobCompName\": \"QA Test Company\",\n        \"pocohJobCode\": \"28JUN2012\",\n        \"pocohJobName\": \"June28/2012 Job\",\n        \"pocohContactCode\": null,\n        \"pocohAddCompCode\": null,\n        \"pocohAddCompName\": null,\n        \"pocohPrintDate\": \"2014-06-27T13:14:21-04:00\",\n        \"pocohDefaultRecCode\": \"M\",\n        \"pocohDate\": \"2013-11-05\",\n        \"pocohPoTotal\": 261.25,\n        \"pocohIuCreateDate\": \"2013-11-05T13:54:00-05:00\",\n        \"pocohIuCreateUser\": \"QA3\",\n        \"pocohIuUpdateDate\": \"2014-07-25T09:18:36-04:00\",\n        \"pocohIuUpdateUser\": \"QA3\",\n        \"pocohAcctDescription\": null,\n        \"pocohDiscountPct\": 0,\n        \"pocohAddName\": null\n    },\n    \"lines\": [\n        {\n            \"pocodVUuid\": \"4E7ECC5F8D183AD8E0630B811DAC7BCF\",\n            \"pocodCompCode\": \"QAT\",\n            \"pocodCompName\": \"QA Test Company\",\n            \"pocodPoNum\": \"JP000019\",\n            \"pocodNum\": \"1\",\n            \"pocodLineNum\": 2,\n            \"pocodReleaseNum\": 1,\n            \"pocodBchNum\": null,\n            \"pocodDeptCode\": null,\n            \"pocodDeptName\": null,\n            \"pocodItmCode\": \"FF1\",\n            \"pocodItmName\": \"Free Form Item 1\",\n            \"pocodItmtypCode\": null,\n            \"pocodItmtypName\": null,\n            \"pocodIvDeptCode\": null,\n            \"pocodIvDeptName\": null,\n            \"pocodIvAccCode\": null,\n            \"pocodIvAccName\": null,\n            \"pocodVarDeptCode\": null,\n            \"pocodVarDeptName\": null,\n            \"pocodVarAccCode\": null,\n            \"pocodVarAccName\": null,\n            \"pocodExptdDate\": null,\n            \"pocodRecDate\": null,\n            \"pocodExptdPriceAmt\": 6.5,\n            \"pocodActPriceAmt\": null,\n            \"pocodAdjPriceAmt\": null,\n            \"pocodCostAmt\": null,\n            \"pocodStdCostAmt\": null,\n            \"pocodAvgCostAmt\": null,\n            \"pocodLstCostAmt\": null,\n            \"pocodCurrCode\": null,\n            \"pocodCurrName\": null,\n            \"pocodOrdQty\": 5,\n            \"pocodLstOrdQty\": 1,\n            \"pocodRecQty\": null,\n            \"pocodRectodateQty\": null,\n            \"pocodRejQty\": null,\n            \"pocodRejtodateQty\": null,\n            \"pocodClaimQty\": null,\n            \"pocodClaimtodateQty\": null,\n            \"pocodPayQty\": null,\n            \"pocodPaytodateQty\": null,\n            \"pocodInvQty\": null,\n            \"pocodInvtodateQty\": null,\n            \"pocodWmCode\": \"EA\",\n            \"pocodWmName\": \"Each\",\n            \"pocodOrdWmCode\": \"EA\",\n            \"pocodOrdWmName\": \"Each\",\n            \"pocodInvWmCode\": \"EA\",\n            \"pocodInvWmName\": \"Each\",\n            \"pocodStatCode\": \"N\",\n            \"pocodLocCode\": null,\n            \"pocodLocName\": null,\n            \"pocodJobCode\": \"28JUN2012\",\n            \"pocodJobName\": \"June28/2012 Job\",\n            \"pocodJobCtrlCode\": \"ALL\",\n            \"pocodPhsCode\": \"01-100\",\n            \"pocodPhsName\": \"Blue Prints\",\n            \"pocodPhsCtrlCode\": \"01\",\n            \"pocodCatCode\": \"4000\",\n            \"pocodCatName\": \"Materials\",\n            \"pocodCatCtrlCode\": \"ALL\",\n            \"pocodTxt1Code\": null,\n            \"pocodTxt1Name\": null,\n            \"pocodTxt2Code\": null,\n            \"pocodTxt2Name\": null,\n            \"pocodTxt3Code\": null,\n            \"pocodTxt3Name\": null,\n            \"pocodDesc\": null,\n            \"pocodOrdTrnNum\": null,\n            \"pocodRecTrnNum\": null,\n            \"pocodIvCode\": null,\n            \"pocodCloseCode\": null,\n            \"pocodSubLineNum\": null,\n            \"pocodEcEqpCode\": null,\n            \"pocodEcCstCode\": null,\n            \"pocodQuoteNum\": null,\n            \"pocodTax1Code\": \"CA\",\n            \"pocodTax1Name\": \"California State Tax\",\n            \"pocodTax2Code\": \"CHICAGO\",\n            \"pocodTax2Name\": \"Chicago Compound Tax\",\n            \"pocodTax3Code\": \"IL\",\n            \"pocodTax3Name\": \"Illinois State Tax\",\n            \"pocodTax1TaxableFlag\": \"Y\",\n            \"pocodTax2TaxableFlag\": \"Y\",\n            \"pocodTax3TaxableFlag\": \"Y\",\n            \"pocodLineChgFlag\": null,\n            \"pocodShplCode\": null,\n            \"pocodWipAccCode\": null,\n            \"pocodWipAccName\": null,\n            \"pocodWipDeptCode\": null,\n            \"pocodWipDeptName\": null,\n            \"pocodSwoOraseq\": null,\n            \"pocodWbsvCode1\": null,\n            \"pocodWbsvCode2\": null,\n            \"pocodWbsvCode3\": null,\n            \"pocodWbsvCode4\": null,\n            \"pocodWbsvCode5\": null,\n            \"pocodWbsvCode6\": null,\n            \"pocodWbsvCode7\": null,\n            \"pocodWbsvCode8\": null,\n            \"pocodWbsvCode9\": null,\n            \"pocodWbsvCode10\": null,\n            \"pocodWbsvCode11\": null,\n            \"pocodWbsvCode12\": null,\n            \"pocodPmCode\": null,\n            \"pocodEqpCode\": null,\n            \"pocodEqpName\": null,\n            \"pocodComponCode\": null,\n            \"pocodComponName\": null,\n            \"pocodTrancodeCode\": null,\n            \"pocodTrancodeName\": null,\n            \"pocodTendpackCode\": null,\n            \"pocodTendpackLineNum\": null,\n            \"pocodSiNum\": null,\n            \"pocodSiLineNum\": null,\n            \"pocodSrcCompCode\": \"QAT\",\n            \"pocodSrcCompName\": \"QA Test Company\",\n            \"pocodClassCode\": null,\n            \"pocodClassName\": null,\n            \"pocodCiitemtypCode\": null,\n            \"pocodCiitemtypName\": null,\n            \"pocodInvTypeCode\": null,\n            \"pocodItemLocCode\": null,\n            \"pocodItemLocName\": null,\n            \"pocodTypeCode\": \"J\",\n            \"pocodSiMastJobCode\": null,\n            \"pocodCloseReasonCode\": null,\n            \"pocodAllocatedQty\": null,\n            \"pocodRecIntoInvFlag\": null,\n            \"pocodWoCode\": null,\n            \"pocodWitmLineNumber\": null,\n            \"pocodExpCode\": null,\n            \"pocodWDetailCode\": null,\n            \"pocodUserTypeCode\": \"J\",\n            \"pocodUserField1\": \"QAT\",\n            \"pocodUserField2\": \"28JUN2012\",\n            \"pocodUserField3\": \"01-100\",\n            \"pocodUserField4\": \"4000\",\n            \"pocodUserField5\": null,\n            \"pocodUserField6\": null,\n            \"pocodUserField7\": null,\n            \"pocodUserField8\": null,\n            \"pocodTavCode1\": null,\n            \"pocodTavCode2\": null,\n            \"pocodTavCode3\": null,\n            \"pocodTavCode4\": null,\n            \"pocodObjectOraseq\": 3320843,\n            \"pocodExtendedAmt\": 32.5,\n            \"pocodPoTypeCode\": \"S\",\n            \"pocodPoItemType\": \"F\",\n            \"pocodItemWmCode\": null,\n            \"pocodOvrdExptdPriceFlag\": null,\n            \"pocodIuCreateDate\": \"2013-11-05T13:54:00-05:00\",\n            \"pocodIuCreateUser\": \"QA3\",\n            \"pocodIuUpdateDate\": \"2016-06-06T15:47:15-04:00\",\n            \"pocodIuUpdateUser\": \"HAYEDEH\",\n            \"pocodUserFieldName5\": null,\n            \"pocodUserFieldName6\": null,\n            \"pocodUserFieldName7\": null,\n            \"pocodUserFieldName8\": null\n        },\n        {\n            \"pocodVUuid\": \"4E7ECC5F8D193AD8E0630B811DAC7BCF\",\n            \"pocodCompCode\": \"QAT\",\n            \"pocodCompName\": \"QA Test Company\",\n            \"pocodPoNum\": \"JP000019\",\n            \"pocodNum\": \"1\",\n            \"pocodLineNum\": 3,\n            \"pocodReleaseNum\": 1,\n            \"pocodBchNum\": null,\n            \"pocodDeptCode\": null,\n            \"pocodDeptName\": null,\n            \"pocodItmCode\": \"WIDGET1\",\n            \"pocodItmName\": \"Widget 1\",\n            \"pocodItmtypCode\": null,\n            \"pocodItmtypName\": null,\n            \"pocodIvDeptCode\": null,\n            \"pocodIvDeptName\": null,\n            \"pocodIvAccCode\": null,\n            \"pocodIvAccName\": null,\n            \"pocodVarDeptCode\": null,\n            \"pocodVarDeptName\": null,\n            \"pocodVarAccCode\": null,\n            \"pocodVarAccName\": null,\n            \"pocodExptdDate\": null,\n            \"pocodRecDate\": null,\n            \"pocodExptdPriceAmt\": 20,\n            \"pocodActPriceAmt\": null,\n            \"pocodAdjPriceAmt\": null,\n            \"pocodCostAmt\": null,\n            \"pocodStdCostAmt\": null,\n            \"pocodAvgCostAmt\": null,\n            \"pocodLstCostAmt\": null,\n            \"pocodCurrCode\": null,\n            \"pocodCurrName\": null,\n            \"pocodOrdQty\": 6,\n            \"pocodLstOrdQty\": 1,\n            \"pocodRecQty\": null,\n            \"pocodRectodateQty\": null,\n            \"pocodRejQty\": null,\n            \"pocodRejtodateQty\": null,\n            \"pocodClaimQty\": null,\n            \"pocodClaimtodateQty\": null,\n            \"pocodPayQty\": null,\n            \"pocodPaytodateQty\": null,\n            \"pocodInvQty\": null,\n            \"pocodInvtodateQty\": null,\n            \"pocodWmCode\": \"EA\",\n            \"pocodWmName\": \"Each\",\n            \"pocodOrdWmCode\": \"EA\",\n            \"pocodOrdWmName\": \"Each\",\n            \"pocodInvWmCode\": \"EA\",\n            \"pocodInvWmName\": \"Each\",\n            \"pocodStatCode\": \"N\",\n            \"pocodLocCode\": null,\n            \"pocodLocName\": null,\n            \"pocodJobCode\": \"28JUN2012\",\n            \"pocodJobName\": \"June28/2012 Job\",\n            \"pocodJobCtrlCode\": \"ALL\",\n            \"pocodPhsCode\": \"01-100\",\n            \"pocodPhsName\": \"Blue Prints\",\n            \"pocodPhsCtrlCode\": \"01\",\n            \"pocodCatCode\": \"4000\",\n            \"pocodCatName\": \"Materials\",\n            \"pocodCatCtrlCode\": \"ALL\",\n            \"pocodTxt1Code\": null,\n            \"pocodTxt1Name\": null,\n            \"pocodTxt2Code\": null,\n            \"pocodTxt2Name\": null,\n            \"pocodTxt3Code\": null,\n            \"pocodTxt3Name\": null,\n            \"pocodDesc\": null,\n            \"pocodOrdTrnNum\": null,\n            \"pocodRecTrnNum\": null,\n            \"pocodIvCode\": \"N\",\n            \"pocodCloseCode\": null,\n            \"pocodSubLineNum\": null,\n            \"pocodEcEqpCode\": null,\n            \"pocodEcCstCode\": null,\n            \"pocodQuoteNum\": null,\n            \"pocodTax1Code\": \"CA\",\n            \"pocodTax1Name\": \"California State Tax\",\n            \"pocodTax2Code\": \"CHICAGO\",\n            \"pocodTax2Name\": \"Chicago Compound Tax\",\n            \"pocodTax3Code\": \"IL\",\n            \"pocodTax3Name\": \"Illinois State Tax\",\n            \"pocodTax1TaxableFlag\": \"Y\",\n            \"pocodTax2TaxableFlag\": \"Y\",\n            \"pocodTax3TaxableFlag\": \"Y\",\n            \"pocodLineChgFlag\": null,\n            \"pocodShplCode\": null,\n            \"pocodWipAccCode\": null,\n            \"pocodWipAccName\": null,\n            \"pocodWipDeptCode\": null,\n            \"pocodWipDeptName\": null,\n            \"pocodSwoOraseq\": null,\n            \"pocodWbsvCode1\": null,\n            \"pocodWbsvCode2\": null,\n            \"pocodWbsvCode3\": null,\n            \"pocodWbsvCode4\": null,\n            \"pocodWbsvCode5\": null,\n            \"pocodWbsvCode6\": null,\n            \"pocodWbsvCode7\": null,\n            \"pocodWbsvCode8\": null,\n            \"pocodWbsvCode9\": null,\n            \"pocodWbsvCode10\": null,\n            \"pocodWbsvCode11\": null,\n            \"pocodWbsvCode12\": null,\n            \"pocodPmCode\": null,\n            \"pocodEqpCode\": null,\n            \"pocodEqpName\": null,\n            \"pocodComponCode\": null,\n            \"pocodComponName\": null,\n            \"pocodTrancodeCode\": null,\n            \"pocodTrancodeName\": null,\n            \"pocodTendpackCode\": null,\n            \"pocodTendpackLineNum\": null,\n            \"pocodSiNum\": null,\n            \"pocodSiLineNum\": null,\n            \"pocodSrcCompCode\": \"QAT\",\n            \"pocodSrcCompName\": \"QA Test Company\",\n            \"pocodClassCode\": null,\n            \"pocodClassName\": null,\n            \"pocodCiitemtypCode\": null,\n            \"pocodCiitemtypName\": null,\n            \"pocodInvTypeCode\": null,\n            \"pocodItemLocCode\": null,\n            \"pocodItemLocName\": null,\n            \"pocodTypeCode\": \"J\",\n            \"pocodSiMastJobCode\": null,\n            \"pocodCloseReasonCode\": null,\n            \"pocodAllocatedQty\": null,\n            \"pocodRecIntoInvFlag\": null,\n            \"pocodWoCode\": null,\n            \"pocodWitmLineNumber\": null,\n            \"pocodExpCode\": null,\n            \"pocodWDetailCode\": null,\n            \"pocodUserTypeCode\": \"J\",\n            \"pocodUserField1\": \"QAT\",\n            \"pocodUserField2\": \"28JUN2012\",\n            \"pocodUserField3\": \"01-100\",\n            \"pocodUserField4\": \"4000\",\n            \"pocodUserField5\": null,\n            \"pocodUserField6\": null,\n            \"pocodUserField7\": null,\n            \"pocodUserField8\": null,\n            \"pocodTavCode1\": null,\n            \"pocodTavCode2\": null,\n            \"pocodTavCode3\": null,\n            \"pocodTavCode4\": null,\n            \"pocodObjectOraseq\": 3320843,\n            \"pocodExtendedAmt\": 120,\n            \"pocodPoTypeCode\": \"S\",\n            \"pocodPoItemType\": \"N\",\n            \"pocodItemWmCode\": \"EA\",\n            \"pocodOvrdExptdPriceFlag\": null,\n            \"pocodIuCreateDate\": \"2013-11-05T13:54:00-05:00\",\n            \"pocodIuCreateUser\": \"QA3\",\n            \"pocodIuUpdateDate\": \"2016-06-06T15:47:15-04:00\",\n            \"pocodIuUpdateUser\": \"HAYEDEH\",\n            \"pocodUserFieldName5\": null,\n            \"pocodUserFieldName6\": null,\n            \"pocodUserFieldName7\": null,\n            \"pocodUserFieldName8\": null\n        },\n        {\n            \"pocodVUuid\": \"4E7ECC5F8D173AD8E0630B811DAC7BCF\",\n            \"pocodCompCode\": \"QAT\",\n            \"pocodCompName\": \"QA Test Company\",\n            \"pocodPoNum\": \"JP000019\",\n            \"pocodNum\": \"1\",\n            \"pocodLineNum\": 1,\n            \"pocodReleaseNum\": 1,\n            \"pocodBchNum\": null,\n            \"pocodDeptCode\": null,\n            \"pocodDeptName\": null,\n            \"pocodItmCode\": \"2X4 WOOD PLANK\",\n            \"pocodItmName\": \"2x4 Wood Planks - Rough Finish\",\n            \"pocodItmtypCode\": null,\n            \"pocodItmtypName\": null,\n            \"pocodIvDeptCode\": null,\n            \"pocodIvDeptName\": null,\n            \"pocodIvAccCode\": null,\n            \"pocodIvAccName\": null,\n            \"pocodVarDeptCode\": null,\n            \"pocodVarDeptName\": null,\n            \"pocodVarAccCode\": null,\n            \"pocodVarAccName\": null,\n            \"pocodExptdDate\": null,\n            \"pocodRecDate\": null,\n            \"pocodExptdPriceAmt\": 10,\n            \"pocodActPriceAmt\": null,\n            \"pocodAdjPriceAmt\": null,\n            \"pocodCostAmt\": null,\n            \"pocodStdCostAmt\": null,\n            \"pocodAvgCostAmt\": null,\n            \"pocodLstCostAmt\": null,\n            \"pocodCurrCode\": null,\n            \"pocodCurrName\": null,\n            \"pocodOrdQty\": 1,\n            \"pocodLstOrdQty\": 2,\n            \"pocodRecQty\": null,\n            \"pocodRectodateQty\": null,\n            \"pocodRejQty\": null,\n            \"pocodRejtodateQty\": null,\n            \"pocodClaimQty\": null,\n            \"pocodClaimtodateQty\": null,\n            \"pocodPayQty\": null,\n            \"pocodPaytodateQty\": null,\n            \"pocodInvQty\": null,\n            \"pocodInvtodateQty\": null,\n            \"pocodWmCode\": \"EA\",\n            \"pocodWmName\": \"Each\",\n            \"pocodOrdWmCode\": \"EA\",\n            \"pocodOrdWmName\": \"Each\",\n            \"pocodInvWmCode\": \"EA\",\n            \"pocodInvWmName\": \"Each\",\n            \"pocodStatCode\": \"N\",\n            \"pocodLocCode\": null,\n            \"pocodLocName\": null,\n            \"pocodJobCode\": \"28JUN2012\",\n            \"pocodJobName\": \"June28/2012 Job\",\n            \"pocodJobCtrlCode\": \"ALL\",\n            \"pocodPhsCode\": \"01-100\",\n            \"pocodPhsName\": \"Blue Prints\",\n            \"pocodPhsCtrlCode\": \"01\",\n            \"pocodCatCode\": \"4000\",\n            \"pocodCatName\": \"Materials\",\n            \"pocodCatCtrlCode\": \"ALL\",\n            \"pocodTxt1Code\": null,\n            \"pocodTxt1Name\": null,\n            \"pocodTxt2Code\": null,\n            \"pocodTxt2Name\": null,\n            \"pocodTxt3Code\": null,\n            \"pocodTxt3Name\": null,\n            \"pocodDesc\": null,\n            \"pocodOrdTrnNum\": null,\n            \"pocodRecTrnNum\": null,\n            \"pocodIvCode\": \"Y\",\n            \"pocodCloseCode\": null,\n            \"pocodSubLineNum\": null,\n            \"pocodEcEqpCode\": null,\n            \"pocodEcCstCode\": null,\n            \"pocodQuoteNum\": null,\n            \"pocodTax1Code\": \"CA\",\n            \"pocodTax1Name\": \"California State Tax\",\n            \"pocodTax2Code\": \"CHICAGO\",\n            \"pocodTax2Name\": \"Chicago Compound Tax\",\n            \"pocodTax3Code\": \"IL\",\n            \"pocodTax3Name\": \"Illinois State Tax\",\n            \"pocodTax1TaxableFlag\": \"Y\",\n            \"pocodTax2TaxableFlag\": \"Y\",\n            \"pocodTax3TaxableFlag\": \"Y\",\n            \"pocodLineChgFlag\": null,\n            \"pocodShplCode\": null,\n            \"pocodWipAccCode\": null,\n            \"pocodWipAccName\": null,\n            \"pocodWipDeptCode\": null,\n            \"pocodWipDeptName\": null,\n            \"pocodSwoOraseq\": null,\n            \"pocodWbsvCode1\": null,\n            \"pocodWbsvCode2\": null,\n            \"pocodWbsvCode3\": null,\n            \"pocodWbsvCode4\": null,\n            \"pocodWbsvCode5\": null,\n            \"pocodWbsvCode6\": null,\n            \"pocodWbsvCode7\": null,\n            \"pocodWbsvCode8\": null,\n            \"pocodWbsvCode9\": null,\n            \"pocodWbsvCode10\": null,\n            \"pocodWbsvCode11\": null,\n            \"pocodWbsvCode12\": null,\n            \"pocodPmCode\": null,\n            \"pocodEqpCode\": null,\n            \"pocodEqpName\": null,\n            \"pocodComponCode\": null,\n            \"pocodComponName\": null,\n            \"pocodTrancodeCode\": null,\n            \"pocodTrancodeName\": null,\n            \"pocodTendpackCode\": null,\n            \"pocodTendpackLineNum\": null,\n            \"pocodSiNum\": null,\n            \"pocodSiLineNum\": null,\n            \"pocodSrcCompCode\": \"QAT\",\n            \"pocodSrcCompName\": \"QA Test Company\",\n            \"pocodClassCode\": \"WOOD\",\n            \"pocodClassName\": \"Rough Lumber\",\n            \"pocodCiitemtypCode\": \"ST\",\n            \"pocodCiitemtypName\": \"Standard Items\",\n            \"pocodInvTypeCode\": null,\n            \"pocodItemLocCode\": \"MAIN\",\n            \"pocodItemLocName\": \"Main Warehouse\",\n            \"pocodTypeCode\": \"J\",\n            \"pocodSiMastJobCode\": null,\n            \"pocodCloseReasonCode\": null,\n            \"pocodAllocatedQty\": null,\n            \"pocodRecIntoInvFlag\": null,\n            \"pocodWoCode\": null,\n            \"pocodWitmLineNumber\": null,\n            \"pocodExpCode\": null,\n            \"pocodWDetailCode\": null,\n            \"pocodUserTypeCode\": \"J\",\n            \"pocodUserField1\": \"QAT\",\n            \"pocodUserField2\": \"28JUN2012\",\n            \"pocodUserField3\": \"01-100\",\n            \"pocodUserField4\": \"4000\",\n            \"pocodUserField5\": null,\n            \"pocodUserField6\": null,\n            \"pocodUserField7\": null,\n            \"pocodUserField8\": null,\n            \"pocodTavCode1\": null,\n            \"pocodTavCode2\": null,\n            \"pocodTavCode3\": null,\n            \"pocodTavCode4\": null,\n            \"pocodObjectOraseq\": 3320843,\n            \"pocodExtendedAmt\": 10,\n            \"pocodPoTypeCode\": \"S\",\n            \"pocodPoItemType\": \"I\",\n            \"pocodItemWmCode\": \"EA\",\n            \"pocodOvrdExptdPriceFlag\": null,\n            \"pocodIuCreateDate\": \"2013-11-05T13:54:00-05:00\",\n            \"pocodIuCreateUser\": \"QA3\",\n            \"pocodIuUpdateDate\": \"2016-06-06T15:47:15-04:00\",\n            \"pocodIuUpdateUser\": \"HAYEDEH\",\n            \"pocodUserFieldName5\": null,\n            \"pocodUserFieldName6\": null,\n            \"pocodUserFieldName7\": null,\n            \"pocodUserFieldName8\": null\n        }\n    ]\n}"
string