> ## Documentation Index > Fetch the complete documentation index at: https://developers.cmicglobal.com/llms.txt > Use this file to discover all available pages before exploring further. # Get Lines Po Change Order By Filters > # PO Change Order — List Summary Lines Only ## Overview Returns a paginated list of change order summary lines without the header. `companyCode` is required; `releaseNumber`, when supplied, must be a valid integer. ## Notes - One extra line beyond `limit` is always fetched so `hasMore` reflects a real next record. - Only the first page (`offset == 0`) returning zero lines is treated as "no results". ## UI Navigation Asset Management → Purchase Order → Change Orders → Enter Change Order ## Finders No named finders — filtering is done entirely through the query parameters below. ## HTTP Method & Endpoint ``` GET {base_url}/po-rest-api/jersey/v1/po-change-order/lines ``` ## Path Parameters None. ## Query Parameters | Parameter | Type | Required | Default | Description | | --- | --- | --- | --- | --- | | companyCode | String | True | — | Filters `POCS_COMP_CODE` | | poNumber | String | Conditional | — | Filters `POCS_PO_NUM`. Required if `coNumber` or `releaseNumber` is supplied | | coNumber | String | False | — | Filters `POCS_NUM` | | releaseNumber | String | False | — | Filters `POCS_RELEASE_NUM`. Must parse as an integer when supplied | | limit | Integer | False | 25 | Max lines to return; capped at 200 | | offset | Integer | False | 0 | Zero-based starting index | | orderBy | String | False | `POCS_ORASEQ` (tiebreaker) | Sort expression, e.g. `lineNumber ASC`. Accepted keys: `companyCode`, `poNumber`, `coNumber`, `releaseNumber`, `lineNumber`, `oraseq` | ## Example Request ``` curl -X GET "{base_url}/po-rest-api/jersey/v1/po-change-order/lines?companyCode=ALT&poNumber=PO000004&coNumber=1&orderBy=lineNumber+ASC" \ -H "Authorization: Basic {credentials}" ``` ## Example Response (200 OK) ``` json { "items": [ { "pocsVUuid": "...", "pocsCompCode": "ALT", "pocsPoNum": "PO000004", "pocsNum": "1", "pocsLineNum": 1 } ], "limit": 25, "offset": 0, "hasMore": false, "count": 1 } ``` ## Attributes | Field | Type | Description | | --- | --- | --- | | items | Array | List of summary line objects (see field table below) | | limit | Integer | Effective page size used (clamped 1-200) | | offset | Integer | Effective starting index used | | hasMore | Boolean | True if more lines exist beyond this page | | count | Integer | Number of items in this response | ### Line (each `items[]` entry) | Name | Object | Description | Type | Data Length | Example | Mandatory | | --- | --- | --- | --- | --- | --- | --- | | pocsVUuid | line | Virtual UUID, unique row identifier | String | 64 | 57583E9AF08B542CE0630B811DACCB66 | System Generated | | pocsCompCode | line | Company code | String | 8 | ALT | Key | | pocsPoNum | line | Parent PO number | String | 11 | PO000004 | Key | | pocsNum | line | Change order number | String | 11 | 1 | Key | | pocsReleaseNum | line | Release number | Number(11) | 11 | 1 | Key | | pocsLineNum | line | Summary line number | Number(6) | 6 | 1 | Key | | pocsCiitemtypCode | line | item type code | String | 2 | MA | False | | pocsClassCode | line | Item class code | String | 4 | OFF1 | False | | pocsDesc | line | Line description | String | 4000 | Revised paper order | False | | pocsDiscountPct | line | Discount percentage | Number | — | 2.500 | False | | pocsExptdPriceAmt | line | Expected unit price | Number | — | 12.5000 | False | | pocsExtdAmt | line | Extended amount (calculated) | Number | — | 1250.00 | System Generated | | pocsItemLocCode | line | Item location code | String | 7 | ILOC01 | False | | pocsItmCode | line | Item/product code | String | 16 | PAPER-A4 | False | | pocsItmName | line | Item/product name (lookup) | String | 4000 | A4 Copy Paper | System Generated | | pocsJobName | line | Job name (lookup) | String | 60 | Office Renovation | System Generated | | pocsPhsName | line | Phase name (lookup) | String | 50 | Phase 1 | System Generated | | pocsCatName | line | Category name (lookup) | String | 30 | Supplies | System Generated | | pocsLumpSumPoFlag | line | Lump-sum PO flag (Y/N, calculated) | String | 1 | N | System Generated | | pocsOrdQty | line | Quantity ordered | Number | — | 100.0000 | False | | pocsOvrdExptdPriceFlag | line | Override expected price flag (Y/N) | String | 1 | Y | False | | pocsPoItemType | line | PO item type (I=Inventory, N=Non-stock, F=Free-form) | String | 1 | N | False | | pocsPoOrdQty | line | PO ordered quantity (calculated) | Number | — | 80.0000 | System Generated | | pocsPoOrderedQty | line | PO ordered quantity, alt calculation (calculated) | Number | — | 80.0000 | System Generated | | pocsPoPriceAmt | line | PO price amount (calculated) | Number | — | 12.5000 | System Generated | | pocsPobldLineNum | line | Source PO build line number (calculated) | Number(6) | 6 | 1 | System Generated | | pocsRecIntoInvFlag | line | Receive into inventory flag (Y/N) | String | 1 | Y | False | | pocsSuggestedPrice | line | Suggested price (calculated) | Number | — | 12.5000 | System Generated | | pocsTax1Code / Tax2Code / Tax3Code | line | Tax codes 1-3 | String | 11 each | HST | False | | pocsTax1TaxableFlag / Tax2.../Tax3... | line | Taxable flags for tax 1-3 (Y/N) | String | 1 each | Y | False | | pocsTaxAmt | line | Tax amount (calculated) | Number | — | 150.00 | System Generated | | pocsTotAmt | line | Total amount (calculated) | Number | — | 1400.00 | System Generated | | pocsUserField1..8 | line | User-defined fields 1-8 | String | 60 each | — | False | | pocsUserTypeCode | line | User-defined type code | String | 3 | STD | False | | pocsWmCode | line | Unit of measure code | String | 2 | BX | False | | pocsTavCode1..4 | line | TAV codes 1-4 | String | 10 each | TAV01 | False | | pocsWbsvCode1..8 | line | WBS value codes 1-8 (always disabled in CMiC UI) | String | 60 each | — | System Generated | | pocsWbsvCode9..12 | line | WBS value codes 9-12 | String | 60 each | — | False | | pocsIuCreateDate | line | Record creation timestamp (ISO-8601) | Timestamp | — | 2026-08-20T10:15:00-04:00 | System Generated | | pocsIuUpdateDate | line | Record last update timestamp (ISO-8601) | Timestamp | — | 2026-08-21T09:00:00-04:00 | System Generated | ## Error Codes | HTTP | Error Code | Reason | | --- | --- | --- | | 400 | PO-000270-ERR | `companyCode` is required | | 400 | PO-000278-ERR | `poNumber` is required when `coNumber` or `releaseNumber` is provided | | 400 | PO-000271-ERR | `releaseNumber` is not a valid integer | | 404 | PO-000280-ERR | No records found matching the given search criteria (only when `offset == 0`) | | 500 | (unhandled exception) | Any other unexpected error | ## OpenAPI ````json GET /lines { "openapi": "3.0.0", "info": { "title": "API Catalog", "description": "", "version": "1.0.0" }, "servers": [ { "url": "https://mobtest.cmiccloudr12.com/cmictestrti", "description": "CMIC API Server" } ], "security": [ { "cmicBasicAuth": [] } ], "tags": [ { "name": "Highlights" }, { "name": "Asset Management | Equipment" }, { "name": "Asset Management | Fixed Assets" }, { "name": "Asset Management | Purchase Order" }, { "name": "Asset Management | Inventory" }, { "name": "Asset Management | Requisition" }, { "name": "Asset Management | Purchase Change Order" }, { "name": "Bim Model" }, { "name": "Bim Model Revision" }, { "name": "Bim Tag Model" }, { "name": "Bim Tags" }, { "name": "Bim FileUpload Jersey" }, { "name": "Core System | Business Partners" }, { "name": "Core System | Business Partner Addresses" }, { "name": "Core System | Bank" }, { "name": "Core System | Currency" }, { "name": "Core System | Exchange Rates" }, { "name": "Core System | Global Table Text Codes" }, { "name": "Core System | Global Table Regions" }, { "name": "Core System | Terms" }, { "name": "Core System | System Contact" }, { "name": "Core System | Weight Measures" }, { "name": "Core System | Field User Defined Classifiers" }, { "name": "Core System | User Defined Classifiers by Object" }, { "name": "Core System | User Extension Definitions by Object" }, { "name": "Core System | User Extention Field Data Value" }, { "name": "Core System | User Extension Values by Object" }, { "name": "Core System | User System Role" }, { "name": "Core System | User Project Role" }, { "name": "Core System | Documents by Object" }, { "name": "Core System | Audit Status Log by Object" }, { "name": "Core System | Licensed Users" }, { "name": "Core System | Company Access" }, { "name": "Core System | Copy User Settings" }, { "name": "Core System | User Maintenance" }, { "name": "Core System | User Roles" }, { "name": "Core System | Security Groups" }, { "name": "Core System | Job/Project Security" }, { "name": "Core System | Weight Measure with Conversions Code" }, { "name": "Core System | Weight Measure Conversions Code" }, { "name": "Core System | User-defined-fields" }, { "name": "Core System | User-extension" }, { "name": "ECM and Workflow | Image Manager" }, { "name": "Financials | General Ledger" }, { "name": "Financials | Accounts Payable" }, { "name": "Financials | Accounts Receivable" }, { "name": "Preventative Maintenance | Issue Work Orders" }, { "name": "Preventative Maintenance | Issue Work Items" }, { "name": "Preventative Maintenance | Issue Work Budgets" }, { "name": "Preventative Maintenance | Issue Priorities" }, { "name": "Preventative Maintenance | Issue Status" }, { "name": "Preventative Maintenance | Issue Types" }, { "name": "Preventative Maintenance | Accumulative Equipment" }, { "name": "Preventative Maintenance | Work Orders" }, { "name": "Preventative Maintenance | Work Items" }, { "name": "Preventative Maintenance | Work Budgets" }, { "name": "Preventative Maintenance | Priorities" }, { "name": "Preventative Maintenance | Tasks" }, { "name": "HCM | UKG Pay Deductions" }, { "name": "HCM | UKG Pay Earnings" }, { "name": "HCM | UKG Pay Headers" }, { "name": "HCM | UKG Pay Taxes" }, { "name": "HCM | Payroll Geographical States" }, { "name": "HCM | Payroll Trades" }, { "name": "HCM | Payroll Union" }, { "name": "HCM | Payroll Pay Runs" }, { "name": "HCM | Payroll Pay Groups" }, { "name": "HCM | Payroll Tax" }, { "name": "HCM | Payroll Worker Compensation" }, { "name": "HCM | Payroll Work Locations" }, { "name": "HCM | Payroll Trade Pay Rates" }, { "name": "HCM | Payroll Union Pay Rates" }, { "name": "HCM | Payroll Job Pay Rates" }, { "name": "HCM | Payroll Master Benefits" }, { "name": "HCM | Payroll Master Deductions" }, { "name": "HCM | Payroll Ben/Ded/Leave Base Codes" }, { "name": "HCM | Payroll Ben/Ded Plans" }, { "name": "HCM | Payroll Ben/Ded Plan Options" }, { "name": "HCM | Payroll Company Benefits" }, { "name": "HCM | Payroll Company Deductions" }, { "name": "HCM | Payroll Vertex Geographic Locations" }, { "name": "HCM | Payroll Checks" }, { "name": "HCM | Payroll Timesheets" }, { "name": "HCM | Employee" }, { "name": "HCM | Employee (Minimum payload)" }, { "name": "HCM | Employee History" }, { "name": "HCM | Tax Exemptions" }, { "name": "HCM | Employee Tax Overrides" }, { "name": "HCM | Employee Pay Splits" }, { "name": "HCM | Employee Benefits" }, { "name": "HCM | Employee Clock In and Out" }, { "name": "HCM | Employee Deductions" }, { "name": "HCM | Employee Leaves" }, { "name": "HCM | Employee Leave History" }, { "name": "HCM | Employee Hour Types" }, { "name": "HCM | Employee Pay History" }, { "name": "HCM | Employee Work Statuses" }, { "name": "HCM | Employee Security Group" }, { "name": "HCM | Crewtime Crew" }, { "name": "HCM | Crewtime Employee Timesheet" }, { "name": "HCM | Crewtime Equipment Timesheet" }, { "name": "HCM | Crew Maintenance Activity Assignment" }, { "name": "HCM | Crew Maintenance Member Assignment" }, { "name": "HCM | Crew Maintenance Member Trade and Union Assignment" }, { "name": "HCM | Crew Maintenance Equipment Assignment" }, { "name": "HCM | Crew Maintenance Equipment Detail Assignment" }, { "name": "HCM | HR Requisitions" }, { "name": "HCM | HR Relations" }, { "name": "HCM | HR Employee Skills" }, { "name": "HCM | HR Incident" }, { "name": "HCM | HR Employee Relatives / Dependents" }, { "name": "HCM | HR Employee Positions" }, { "name": "HCM | HR Applicants" }, { "name": "HCM | HR Applications" }, { "name": "HCM | Vertex Location City" }, { "name": "HCM | HR Application History" }, { "name": "HCM | HR Dependent Benefits" }, { "name": "HCM | HR Dependent Deductions" }, { "name": "HCM | HR Employee Elected Plans" }, { "name": "HCM | HR Employee Training Certifications" }, { "name": "HCM | HR Trainings" }, { "name": "HCM | E-Timesheets" }, { "name": "HCM | System Contacts" }, { "name": "HCM | System User Payroll Security Group" }, { "name": "HCM | Payroll Timesheet Posting" }, { "name": "HCM | CrewTimesheet Posting" }, { "name": "HCM | HR Positions Master" }, { "name": "HCM | Payroll Pay Periods" }, { "name": "HCM | Payroll Rate Codes" }, { "name": "HCM | Payroll Overhead Codes and Rates" }, { "name": "HCM | Payroll Assigned Overhead to Jobs" }, { "name": "Materials Management | Material Sale Orders" }, { "name": "Materials Management | Material Sale Orders Details" }, { "name": "Materials Management | Truck Rate Detail" }, { "name": "Opportunity Management | Competitors" }, { "name": "Opportunity Management | Opportunities" }, { "name": "Opportunity Management | Revenue Details" }, { "name": "Opportunity Management | Opportunity History" }, { "name": "Opportunity Management | Organization" }, { "name": "Project Controls | Job Billing" }, { "name": "Project Controls | Job Cost" }, { "name": "Project Controls | PCI Details" }, { "name": "Project Controls | Unposted PCI Details" }, { "name": "Project Controls | PCI Headers" }, { "name": "Project Controls | Owner Change Orders" }, { "name": "Project Controls | CM Statuses" }, { "name": "Project Controls | CM Types" }, { "name": "Project Controls | CM Vendor Details" }, { "name": "Project Controls | Post PCI" }, { "name": "Project Management | Uploading Documents" }, { "name": "Project Management | Downloading Documents" }, { "name": "Project Management | Foreign Bid Item Imports" }, { "name": "Project Management | Communications" }, { "name": "Project Management | Daily Journals" }, { "name": "Project Management | Communications Types" }, { "name": "Project Management | Daily Journal Daily Work Plans" }, { "name": "Project Management | Daily Journal Field Forces" }, { "name": "Project Management | Daily Journal Labour" }, { "name": "Project Management | Daily Journal Materials" }, { "name": "Project Management | Daily Journal Owner Equipment" }, { "name": "Project Management | Daily Journal Quality Control" }, { "name": "Project Management | Daily Journal Tasks" }, { "name": "Project Management | Daily Journal Trade Equipment" }, { "name": "Project Management | Daily Journal Transactions" }, { "name": "Project Management | Daily Journal User Defined Data" }, { "name": "Project Management | Daily Journal Visitors" }, { "name": "Project Management | Daily Journal Bill Details" }, { "name": "Project Management | Field Work Directives" }, { "name": "Project Management | Contract Types" }, { "name": "Project Management | Company Contacts" }, { "name": "Project Management | Distribution BCC" }, { "name": "Project Management | Distribution CC" }, { "name": "Project Management | Field Work Directive Statuses" }, { "name": "Project Management | Issues" }, { "name": "Project Management | Key Players" }, { "name": "Project Management | Meetings" }, { "name": "Project Management | Meeting Attendees" }, { "name": "Project Management | Meeting Item Statuses" }, { "name": "Project Management | Meeting Tracks" }, { "name": "Project Management | Notes" }, { "name": "Project Management | Projects" }, { "name": "Project Management | Project Items" }, { "name": "Project Management | Project Item Phase Segment Sums" }, { "name": "Project Management | Project Partners" }, { "name": "Project Management | Notices" }, { "name": "Project Management | Notice Statuses" }, { "name": "Project Management | Owner JS Query" }, { "name": "Project Management | PCI Real Locations" }, { "name": "Project Management | Project Contacts" }, { "name": "Project Management | RFIs (Requests for Information)" }, { "name": "Project Management | RFI Statuses" }, { "name": "Project Management | Submittal Packages" }, { "name": "Project Management | Submittal Package Details" }, { "name": "Project Management | Submittal Package Status" }, { "name": "Project Management | Submittals" }, { "name": "Project Management | Submittal Status" }, { "name": "Project Management | Transmittals" }, { "name": "Project Management | Subcontract Headers" }, { "name": "Project Management | Subcontract Schedules" }, { "name": "Project Management | Subcontract Sechedule Phase Segment Sums" }, { "name": "Project Management | User Roles" }, { "name": "Project Management | Punchlists" }, { "name": "Project Management | Punchlist Details" }, { "name": "Project Management | Punchlist Statuses" }, { "name": "Project Management | Meeting Items" }, { "name": "Project Management | Self Perform Vendor" }, { "name": "Project Management | Submittal Types" }, { "name": "Project Management | Assign contact and partner to project" }, { "name": "Project Management | Subcontract Prequal" }, { "name": "Project Management | Bid Item Package" } ], "paths": { "/lines": { "get": { "tags": [ "Asset Management | Purchase Change Order" ], "summary": "Get Lines Po Change Order By Filters", "description": "# PO Change Order — List Summary Lines Only\n\n## Overview\n\nReturns a paginated list of change order summary lines without the header. `companyCode` is \nrequired; `releaseNumber`, when supplied, must be a valid integer.\n\n## Notes\n\n- One extra line beyond `limit` is always fetched so `hasMore` reflects a real next record.\n \n- Only the first page (`offset == 0`) returning zero lines is treated as \"no results\".\n \n\n## UI Navigation\n\nAsset Management → Purchase Order → Change Orders → Enter Change Order\n\n## Finders\n\nNo named finders — filtering is done entirely through the query parameters below.\n\n## HTTP Method & Endpoint\n\n```\nGET {base_url}/po-rest-api/jersey/v1/po-change-order/lines\n\n ```\n\n## Path Parameters\n\nNone.\n\n## Query Parameters\n\n| Parameter | Type | Required | Default | Description |\n| --- | --- | --- | --- | --- |\n| companyCode | String | True | — | Filters `POCS_COMP_CODE` |\n| poNumber | String | Conditional | — | Filters `POCS_PO_NUM`. Required if `coNumber` or `releaseNumber` is supplied |\n| coNumber | String | False | — | Filters `POCS_NUM` |\n| releaseNumber | String | False | — | Filters `POCS_RELEASE_NUM`. Must parse as an integer when supplied |\n| limit | Integer | False | 25 | Max lines to return; capped at 200 |\n| offset | Integer | False | 0 | Zero-based starting index |\n| orderBy | String | False | `POCS_ORASEQ` (tiebreaker) | Sort expression, e.g. `lineNumber ASC`. Accepted keys: `companyCode`, `poNumber`, `coNumber`, `releaseNumber`, `lineNumber`, `oraseq` |\n\n## Example Request\n\n```\ncurl -X GET \"{base_url}/po-rest-api/jersey/v1/po-change-order/lines?companyCode=ALT&poNumber=PO000004&coNumber=1&orderBy=lineNumber+ASC\" \\\n -H \"Authorization: Basic {credentials}\"\n\n ```\n\n## Example Response (200 OK)\n\n``` json\n{\n \"items\": [\n { \"pocsVUuid\": \"...\", \"pocsCompCode\": \"ALT\", \"pocsPoNum\": \"PO000004\", \"pocsNum\": \"1\", \"pocsLineNum\": 1 }\n ],\n \"limit\": 25,\n \"offset\": 0,\n \"hasMore\": false,\n \"count\": 1\n}\n\n ```\n\n## Attributes\n\n| Field | Type | Description |\n| --- | --- | --- |\n| items | Array | List of summary line objects (see field table below) |\n| limit | Integer | Effective page size used (clamped 1-200) |\n| offset | Integer | Effective starting index used |\n| hasMore | Boolean | True if more lines exist beyond this page |\n| count | Integer | Number of items in this response |\n\n### Line (each `items[]` entry)\n\n| Name | Object | Description | Type | Data Length | Example | Mandatory |\n| --- | --- | --- | --- | --- | --- | --- |\n| pocsVUuid | line | Virtual UUID, unique row identifier | String | 64 | 57583E9AF08B542CE0630B811DACCB66 | System Generated |\n| pocsCompCode | line | Company code | String | 8 | ALT | Key |\n| pocsPoNum | line | Parent PO number | String | 11 | PO000004 | Key |\n| pocsNum | line | Change order number | String | 11 | 1 | Key |\n| pocsReleaseNum | line | Release number | Number(11) | 11 | 1 | Key |\n| pocsLineNum | line | Summary line number | Number(6) | 6 | 1 | Key |\n| pocsCiitemtypCode | line | item type code | String | 2 | MA | False |\n| pocsClassCode | line | Item class code | String | 4 | OFF1 | False |\n| pocsDesc | line | Line description | String | 4000 | Revised paper order | False |\n| pocsDiscountPct | line | Discount percentage | Number | — | 2.500 | False |\n| pocsExptdPriceAmt | line | Expected unit price | Number | — | 12.5000 | False |\n| pocsExtdAmt | line | Extended amount (calculated) | Number | — | 1250.00 | System Generated |\n| pocsItemLocCode | line | Item location code | String | 7 | ILOC01 | False |\n| pocsItmCode | line | Item/product code | String | 16 | PAPER-A4 | False |\n| pocsItmName | line | Item/product name (lookup) | String | 4000 | A4 Copy Paper | System Generated |\n| pocsJobName | line | Job name (lookup) | String | 60 | Office Renovation | System Generated |\n| pocsPhsName | line | Phase name (lookup) | String | 50 | Phase 1 | System Generated |\n| pocsCatName | line | Category name (lookup) | String | 30 | Supplies | System Generated |\n| pocsLumpSumPoFlag | line | Lump-sum PO flag (Y/N, calculated) | String | 1 | N | System Generated |\n| pocsOrdQty | line | Quantity ordered | Number | — | 100.0000 | False |\n| pocsOvrdExptdPriceFlag | line | Override expected price flag (Y/N) | String | 1 | Y | False |\n| pocsPoItemType | line | PO item type (I=Inventory, N=Non-stock, F=Free-form) | String | 1 | N | False |\n| pocsPoOrdQty | line | PO ordered quantity (calculated) | Number | — | 80.0000 | System Generated |\n| pocsPoOrderedQty | line | PO ordered quantity, alt calculation (calculated) | Number | — | 80.0000 | System Generated |\n| pocsPoPriceAmt | line | PO price amount (calculated) | Number | — | 12.5000 | System Generated |\n| pocsPobldLineNum | line | Source PO build line number (calculated) | Number(6) | 6 | 1 | System Generated |\n| pocsRecIntoInvFlag | line | Receive into inventory flag (Y/N) | String | 1 | Y | False |\n| pocsSuggestedPrice | line | Suggested price (calculated) | Number | — | 12.5000 | System Generated |\n| pocsTax1Code / Tax2Code / Tax3Code | line | Tax codes 1-3 | String | 11 each | HST | False |\n| pocsTax1TaxableFlag / Tax2.../Tax3... | line | Taxable flags for tax 1-3 (Y/N) | String | 1 each | Y | False |\n| pocsTaxAmt | line | Tax amount (calculated) | Number | — | 150.00 | System Generated |\n| pocsTotAmt | line | Total amount (calculated) | Number | — | 1400.00 | System Generated |\n| pocsUserField1..8 | line | User-defined fields 1-8 | String | 60 each | — | False |\n| pocsUserTypeCode | line | User-defined type code | String | 3 | STD | False |\n| pocsWmCode | line | Unit of measure code | String | 2 | BX | False |\n| pocsTavCode1..4 | line | TAV codes 1-4 | String | 10 each | TAV01 | False |\n| pocsWbsvCode1..8 | line | WBS value codes 1-8 (always disabled in CMiC UI) | String | 60 each | — | System Generated |\n| pocsWbsvCode9..12 | line | WBS value codes 9-12 | String | 60 each | — | False |\n| pocsIuCreateDate | line | Record creation timestamp (ISO-8601) | Timestamp | — | 2026-08-20T10:15:00-04:00 | System Generated |\n| pocsIuUpdateDate | line | Record last update timestamp (ISO-8601) | Timestamp | — | 2026-08-21T09:00:00-04:00 | System Generated |\n\n## Error Codes\n\n| HTTP | Error Code | Reason |\n| --- | --- | --- |\n| 400 | PO-000270-ERR | `companyCode` is required |\n| 400 | PO-000278-ERR | `poNumber` is required when `coNumber` or `releaseNumber` is provided |\n| 400 | PO-000271-ERR | `releaseNumber` is not a valid integer |\n| 404 | PO-000280-ERR | No records found matching the given search criteria (only when `offset == 0`) |\n| 500 | (unhandled exception) | Any other unexpected error |", "parameters": [ { "name": "companyCode", "in": "query", "schema": { "type": "string" }, "example": "ZZ" }, { "name": "auditDate", "in": "query", "schema": { "type": "string" }, "example": "2026-08-08" } ], "responses": { "200": { "description": "OK", "headers": { "Content-Type": { "schema": { "type": "string", "example": "application/json" } } }, "content": { "text/plain": { "schema": { "type": "string" }, "example": "{\n \"items\": [\n {\n \"pocsVUuid\": \"4E69C78988FAFD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"000010\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"STON\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 20,\n \"pocsExtdAmt\": 60,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"STONES\",\n \"pocsItmName\": \"stones\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 3,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": 9,\n \"pocsPoOrderedQty\": 9,\n \"pocsPoPriceAmt\": 20,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"Y\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": \"01\",\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 4.8,\n \"pocsTotAmt\": 64.8,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": null,\n \"pocsUserField3\": null,\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"I\",\n \"pocsWmCode\": \"NA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2017-03-20T08:48:44-04:00\",\n \"pocsIuUpdateDate\": \"2017-03-20T08:49:06-04:00\"\n },\n {\n \"pocsVUuid\": \"4E69C78988FBFD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"000015\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": \"2\",\n \"pocsClassCode\": \"PNT\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 50,\n \"pocsExtdAmt\": 0,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"5033015\",\n \"pocsItmName\": \"SR Ultra Prime White Paint Load abcdefghijklmnopqrstuvwxyz 0\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 0,\n \"pocsOvrdExptdPriceFlag\": null,\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": 5,\n \"pocsPoOrderedQty\": 5,\n \"pocsPoPriceAmt\": 50,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": \"01\",\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 0,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"00\",\n \"pocsUserField3\": \"5000.100\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"GL\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2017-11-27T12:08:22-05:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C78988FCFD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"000015\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 2,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"OFFI\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 10,\n \"pocsExtdAmt\": 10,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"1104\",\n \"pocsItmName\": \"1104\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 1,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": null,\n \"pocsPoOrderedQty\": null,\n \"pocsPoPriceAmt\": null,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"Y\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 10,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": null,\n \"pocsUserField3\": null,\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"I\",\n \"pocsWmCode\": \"NA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2017-11-27T12:09:12-05:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C78988A6FD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"000007\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"STON\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 20,\n \"pocsExtdAmt\": -130,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"STONES\",\n \"pocsItmName\": \"stones\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 1,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": 5,\n \"pocsPoOrderedQty\": 5,\n \"pocsPoPriceAmt\": 50,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"Y\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": -130,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": null,\n \"pocsUserField3\": null,\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"I\",\n \"pocsWmCode\": \"NA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2017-12-22T12:09:14-05:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C78988C1FD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"GILBANE004\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"STON\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 0,\n \"pocsExtdAmt\": 0,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"STONES\",\n \"pocsItmName\": \"stones\",\n \"pocsJobName\": \"Gilbane GC Monitor\",\n \"pocsPhsName\": \"Estimating\",\n \"pocsCatName\": \"Direct Labor\",\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 0,\n \"pocsOvrdExptdPriceFlag\": null,\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": 2,\n \"pocsPoOrderedQty\": 2,\n \"pocsPoPriceAmt\": 0,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": \"01\",\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 0,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"GILBANE-01\",\n \"pocsUserField3\": \"01-701\",\n \"pocsUserField4\": \"1100\",\n \"pocsUserField5\": null,\n \"pocsUserField6\": \"ONE\",\n \"pocsUserField7\": \"EXT0014\",\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"J\",\n \"pocsWmCode\": \"NA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": \"ONE\",\n \"pocsWbsvCode3\": \"EXT0014\",\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2018-04-26T12:42:37-04:00\",\n \"pocsIuUpdateDate\": \"2018-04-26T12:43:18-04:00\"\n },\n {\n \"pocsVUuid\": \"4E69C78988DCFD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"000005\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": null,\n \"pocsClassCode\": null,\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 10,\n \"pocsExtdAmt\": -340,\n \"pocsItemLocCode\": null,\n \"pocsItmCode\": \"DF\",\n \"pocsItmName\": \"sss tttt\",\n \"pocsJobName\": null,\n \"pocsPhsName\": \"no decimals 1234 1234 1234 1234\",\n \"pocsCatName\": \"Materials\",\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 6,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"F\",\n \"pocsPoOrdQty\": 10,\n \"pocsPoOrderedQty\": 10,\n \"pocsPoPriceAmt\": 50,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": -340,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"00-DUPLICA\",\n \"pocsUserField3\": \"00000-01-01-022\",\n \"pocsUserField4\": \"4000\",\n \"pocsUserField5\": null,\n \"pocsUserField6\": \"ONE\",\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"J\",\n \"pocsWmCode\": \"EA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": \"ONE\",\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2018-12-07T18:21:01-05:00\",\n \"pocsIuUpdateDate\": \"2022-03-17T13:15:54-04:00\"\n },\n {\n \"pocsVUuid\": \"4E69C78988DDFD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"000005\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 2,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"OFFI\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 10,\n \"pocsExtdAmt\": 10,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"1104\",\n \"pocsItmName\": \"1104\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 1,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": null,\n \"pocsPoOrderedQty\": null,\n \"pocsPoPriceAmt\": null,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 10,\n \"pocsUserField1\": null,\n \"pocsUserField2\": null,\n \"pocsUserField3\": null,\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"M\",\n \"pocsWmCode\": \"NA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2018-12-07T18:21:02-05:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C7898902FD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"000008\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"OFFI\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 10,\n \"pocsExtdAmt\": -190,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"1104\",\n \"pocsItmName\": \"1104\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 1,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": 5,\n \"pocsPoOrderedQty\": 5,\n \"pocsPoPriceAmt\": 50,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"Y\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": -190,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": null,\n \"pocsUserField3\": null,\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"I\",\n \"pocsWmCode\": \"NA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-02-19T15:08:13-05:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C7898903FD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"000008\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 2,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"OFFI\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 10,\n \"pocsExtdAmt\": 20,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"1104\",\n \"pocsItmName\": \"1104\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 2,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": null,\n \"pocsPoOrderedQty\": null,\n \"pocsPoPriceAmt\": null,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 20,\n \"pocsUserField1\": null,\n \"pocsUserField2\": null,\n \"pocsUserField3\": null,\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"M\",\n \"pocsWmCode\": \"NA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-02-19T15:21:12-05:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C78988DEFD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"000008\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 3,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"OFFI\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 10,\n \"pocsExtdAmt\": 0,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"1104\",\n \"pocsItmName\": \"1104\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": null,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": null,\n \"pocsPoOrderedQty\": null,\n \"pocsPoPriceAmt\": null,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 0,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"00\",\n \"pocsUserField3\": \"2000.100\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"NA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-02-20T16:55:09-05:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C78988DFFD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"FM01\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"OFFI\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 12,\n \"pocsExtdAmt\": 0,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"1104\",\n \"pocsItmName\": \"1104\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 0,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": 10,\n \"pocsPoOrderedQty\": 10,\n \"pocsPoPriceAmt\": 12,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": \"01\",\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 0,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"00\",\n \"pocsUserField3\": \"1000.100\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"NA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-03-03T14:11:23-05:00\",\n \"pocsIuUpdateDate\": \"2020-03-03T14:20:40-05:00\"\n },\n {\n \"pocsVUuid\": \"4E69C7898904FD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"FM2\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"OFFI\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 11,\n \"pocsExtdAmt\": 0,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"1104\",\n \"pocsItmName\": \"1104\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 0,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": 10,\n \"pocsPoOrderedQty\": 10,\n \"pocsPoPriceAmt\": 11,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": \"01\",\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 0,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"00\",\n \"pocsUserField3\": \"1000.100\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"NA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-03-03T16:47:45-05:00\",\n \"pocsIuUpdateDate\": \"2020-03-03T16:50:36-05:00\"\n },\n {\n \"pocsVUuid\": \"4E69C7898905FD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"FM3\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"OFFI\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 10,\n \"pocsExtdAmt\": 0,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"1105\",\n \"pocsItmName\": \"1105\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 0,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": 10,\n \"pocsPoOrderedQty\": 10,\n \"pocsPoPriceAmt\": 10,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": \"01\",\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 0,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"00\",\n \"pocsUserField3\": \"1000.100\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"CA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-03-03T17:06:37-05:00\",\n \"pocsIuUpdateDate\": \"2020-04-28T11:51:16-04:00\"\n },\n {\n \"pocsVUuid\": \"4E69C78988ABFD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"000012\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"OFFI\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 10,\n \"pocsExtdAmt\": -890,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"1104\",\n \"pocsItmName\": \"1104\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 1,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": 10,\n \"pocsPoOrderedQty\": 10,\n \"pocsPoPriceAmt\": 100,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": -890,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"00\",\n \"pocsUserField3\": \"1000.100\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"NA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-03-09T15:49:16-04:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C78988ACFD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"FM01\",\n \"pocsNum\": \"2\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"OFFI\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 12,\n \"pocsExtdAmt\": 0,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"1104\",\n \"pocsItmName\": \"1104\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 0,\n \"pocsOvrdExptdPriceFlag\": null,\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": 10,\n \"pocsPoOrderedQty\": 10,\n \"pocsPoPriceAmt\": 12,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": \"01\",\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 0,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"00\",\n \"pocsUserField3\": \"1000.100\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"NA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-03-09T16:09:01-04:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C78988ADFD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"FM01\",\n \"pocsNum\": \"2\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 2,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"OFFI\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 10,\n \"pocsExtdAmt\": 10,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"1105\",\n \"pocsItmName\": \"1105\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 1,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": 1,\n \"pocsPoOrderedQty\": 1,\n \"pocsPoPriceAmt\": 10,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 10,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"00\",\n \"pocsUserField3\": \"1000.100\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"CA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-03-09T16:11:28-04:00\",\n \"pocsIuUpdateDate\": \"2020-03-09T16:12:48-04:00\"\n },\n {\n \"pocsVUuid\": \"4E69C78988E0FD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"000008\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 4,\n \"pocsCiitemtypCode\": null,\n \"pocsClassCode\": null,\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 1,\n \"pocsExtdAmt\": 1,\n \"pocsItemLocCode\": null,\n \"pocsItmCode\": \"1\",\n \"pocsItmName\": \"222\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 1,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"F\",\n \"pocsPoOrdQty\": null,\n \"pocsPoOrderedQty\": null,\n \"pocsPoPriceAmt\": null,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 1,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"00\",\n \"pocsUserField3\": \"2000.200\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"EA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-04-16T12:19:50-04:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C78988E1FD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"TEST-0505\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"OFFI\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 1,\n \"pocsExtdAmt\": 0,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"1105\",\n \"pocsItmName\": \"1105\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 0,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": 1,\n \"pocsPoOrderedQty\": 1,\n \"pocsPoPriceAmt\": 1,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": \"01\",\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 0,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"00\",\n \"pocsUserField3\": \"1000.100\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"CA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-04-28T11:57:56-04:00\",\n \"pocsIuUpdateDate\": \"2020-04-28T11:58:36-04:00\"\n },\n {\n \"pocsVUuid\": \"4E69C78988AEFD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"TEST0515GG\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": null,\n \"pocsClassCode\": null,\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 78000,\n \"pocsExtdAmt\": 0,\n \"pocsItemLocCode\": null,\n \"pocsItmCode\": \"WA\",\n \"pocsItmName\": \"Test A\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 0,\n \"pocsOvrdExptdPriceFlag\": null,\n \"pocsPoItemType\": \"N\",\n \"pocsPoOrdQty\": 1,\n \"pocsPoOrderedQty\": 1,\n \"pocsPoPriceAmt\": 78000,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 0,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"10\",\n \"pocsUserField3\": \"1000.100\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"EA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-04-30T13:25:05-04:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C78988AFFD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"TEST0515GG\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 2,\n \"pocsCiitemtypCode\": null,\n \"pocsClassCode\": null,\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 2,\n \"pocsExtdAmt\": 20,\n \"pocsItemLocCode\": null,\n \"pocsItmCode\": \"JJJJH\",\n \"pocsItmName\": \"JJJJH\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 10,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"F\",\n \"pocsPoOrdQty\": null,\n \"pocsPoOrderedQty\": null,\n \"pocsPoPriceAmt\": null,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 20,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"10\",\n \"pocsUserField3\": \"1000.100\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"EA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-04-30T13:25:30-04:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C7898906FD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"TEST05134\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": null,\n \"pocsClassCode\": null,\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 78000,\n \"pocsExtdAmt\": 0,\n \"pocsItemLocCode\": null,\n \"pocsItmCode\": \"WA\",\n \"pocsItmName\": \"Test A\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 0,\n \"pocsOvrdExptdPriceFlag\": null,\n \"pocsPoItemType\": \"N\",\n \"pocsPoOrdQty\": 1,\n \"pocsPoOrderedQty\": 1,\n \"pocsPoPriceAmt\": 78000,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 0,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"00\",\n \"pocsUserField3\": \"1000.100\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"EA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-05-01T07:56:02-04:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C7898907FD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"TEST05134\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 2,\n \"pocsCiitemtypCode\": null,\n \"pocsClassCode\": null,\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 2,\n \"pocsExtdAmt\": 20,\n \"pocsItemLocCode\": null,\n \"pocsItmCode\": \"ITEM 88\",\n \"pocsItmName\": \"88\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 10,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"F\",\n \"pocsPoOrdQty\": null,\n \"pocsPoOrderedQty\": null,\n \"pocsPoPriceAmt\": null,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 20,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"10\",\n \"pocsUserField3\": \"1000.600\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"EA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-05-01T07:56:50-04:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C78988B0FD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"000012\",\n \"pocsNum\": \"2\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": null,\n \"pocsClassCode\": null,\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 2,\n \"pocsExtdAmt\": -978,\n \"pocsItemLocCode\": null,\n \"pocsItmCode\": \"011\",\n \"pocsItmName\": \"11\",\n \"pocsJobName\": null,\n \"pocsPhsName\": \"M11\",\n \"pocsCatName\": \"Labor\",\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 1,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"F\",\n \"pocsPoOrdQty\": 10,\n \"pocsPoOrderedQty\": 10,\n \"pocsPoPriceAmt\": 100,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": -978,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"19.70330\",\n \"pocsUserField3\": \"M11\",\n \"pocsUserField4\": \"1000\",\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"J\",\n \"pocsWmCode\": \"EA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-05-05T16:34:06-04:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C7898909FD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"000014\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": null,\n \"pocsClassCode\": null,\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 2,\n \"pocsExtdAmt\": -4798,\n \"pocsItemLocCode\": null,\n \"pocsItmCode\": \"001\",\n \"pocsItmName\": \"test1\",\n \"pocsJobName\": null,\n \"pocsPhsName\": null,\n \"pocsCatName\": null,\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 1,\n \"pocsOvrdExptdPriceFlag\": \"N\",\n \"pocsPoItemType\": \"F\",\n \"pocsPoOrdQty\": 100,\n \"pocsPoOrderedQty\": 100,\n \"pocsPoPriceAmt\": 50,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": null,\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": -4798,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"10\",\n \"pocsUserField3\": \"1000.100\",\n \"pocsUserField4\": null,\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"G\",\n \"pocsWmCode\": \"EA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-05-06T10:26:38-04:00\",\n \"pocsIuUpdateDate\": null\n },\n {\n \"pocsVUuid\": \"4E69C789890AFD36E0630B811DAC6604\",\n \"pocsCompCode\": \"ZZ\",\n \"pocsPoNum\": \"04-DUPL001\",\n \"pocsNum\": \"1\",\n \"pocsReleaseNum\": 1,\n \"pocsLineNum\": 1,\n \"pocsCiitemtypCode\": \"1\",\n \"pocsClassCode\": \"STON\",\n \"pocsDesc\": null,\n \"pocsDiscountPct\": 0,\n \"pocsExptdPriceAmt\": 400,\n \"pocsExtdAmt\": 0,\n \"pocsItemLocCode\": \"MAIN\",\n \"pocsItmCode\": \"STONES\",\n \"pocsItmName\": \"stones\",\n \"pocsJobName\": null,\n \"pocsPhsName\": \"No decimals\",\n \"pocsCatName\": \"Sundry\",\n \"pocsLumpSumPoFlag\": null,\n \"pocsOrdQty\": 0,\n \"pocsOvrdExptdPriceFlag\": null,\n \"pocsPoItemType\": \"I\",\n \"pocsPoOrdQty\": 20,\n \"pocsPoOrderedQty\": 20,\n \"pocsPoPriceAmt\": 400,\n \"pocsPobldLineNum\": null,\n \"pocsRecIntoInvFlag\": \"N\",\n \"pocsSuggestedPrice\": null,\n \"pocsTax1Code\": \"01\",\n \"pocsTax1TaxableFlag\": \"Y\",\n \"pocsTax2Code\": null,\n \"pocsTax2TaxableFlag\": \"Y\",\n \"pocsTax3Code\": null,\n \"pocsTax3TaxableFlag\": \"Y\",\n \"pocsTaxAmt\": 0,\n \"pocsTotAmt\": 0,\n \"pocsUserField1\": \"ZZ\",\n \"pocsUserField2\": \"04-DUPLICA\",\n \"pocsUserField3\": \"00000-01-01-002\",\n \"pocsUserField4\": \"5000\",\n \"pocsUserField5\": null,\n \"pocsUserField6\": null,\n \"pocsUserField7\": null,\n \"pocsUserField8\": null,\n \"pocsUserTypeCode\": \"J\",\n \"pocsWmCode\": \"NA\",\n \"pocsTavCode1\": null,\n \"pocsTavCode2\": null,\n \"pocsTavCode3\": null,\n \"pocsTavCode4\": null,\n \"pocsWbsvCode1\": null,\n \"pocsWbsvCode2\": null,\n \"pocsWbsvCode3\": null,\n \"pocsWbsvCode4\": null,\n \"pocsWbsvCode5\": null,\n \"pocsWbsvCode6\": null,\n \"pocsWbsvCode7\": null,\n \"pocsWbsvCode8\": null,\n \"pocsWbsvCode9\": null,\n \"pocsWbsvCode10\": null,\n \"pocsWbsvCode11\": null,\n \"pocsWbsvCode12\": null,\n \"pocsIuCreateDate\": \"2020-05-06T11:17:20-04:00\",\n \"pocsIuUpdateDate\": null\n }\n ],\n \"limit\": 25,\n \"offset\": 0,\n \"hasMore\": true,\n \"count\": 25\n}" } } } } } } }, "components": { "securitySchemes": { "cmicBasicAuth": { "type": "http", "scheme": "basic", "description": "Basic authentication" } } } } ````