PO Change Order — List Master Records Only
Overview
Returns a paginated list of change order header records only — no summary lines are fetched.
Useful when only header-level data is needed, avoiding the overhead of resolving child lines.
Notes
At least one filter is required, and the same pagination rules apply as the combined
header-and-lines list — the only difference is that lines are never fetched here.One extra row beyond
limitis always fetched sohasMorereflects a real next record.Only the first page (
offset == 0) returning zero rows is treated as "no results".
UI Navigation
Asset Management → Purchase Order → Change Orders → Enter Change Order
Finders
No named finders — filtering is done entirely through the query parameters below.
HTTP Method & Endpoint
GET {base_url}/po-rest-api/jersey/v1/po-change-order/master
Path Parameters
None.
Query Parameters
| Parameter | Type | Required | Default | Description |
|---|---|---|---|---|
| companyCode | String | True (at least one filter required) | — | Filters POCOH_COMP_CODE |
| poNumber | String | Conditional | — | Filters POCOH_PO_NUM. Required if coNumber or releaseNumber is supplied |
| coNumber | String | False | — | Filters POCOH_NUM |
| releaseNumber | String | False | — | Filters POCOH_RELEASE_NUM. Must parse as an integer |
| auditDate | String | False | — | Returns rows where GREATEST(create_date, update_date) >= auditDate. Format YYYY-MM-DD |
| limit | Integer | False | 25 | Max records to return; capped at 200 |
| offset | Integer | False | 0 | Zero-based starting index |
| orderBy | String | False | POCOH_OBJECT_ORASEQ (tiebreaker) |
Sort expression, e.g. createDate DESC. Accepted keys: companyCode, poNumber, coNumber, releaseNumber, createDate, updateDate, oraseq |
Example Request
curl -X GET "{base_url}/po-rest-api/jersey/v1/po-change-order/master?companyCode=ALT&limit=25&offset=0" \
-H "Authorization: Basic {credentials}"
Example Response (200 OK)
{
"items": [
{ "pocohVUuid": "...", "pocohCompCode": "ALT", "pocohPoNum": "PO000004", "pocohNum": "1", "pocohReleaseNum": 1 }
],
"limit": 25,
"offset": 0,
"hasMore": false,
"count": 1
}
Attributes
| Field | Type | Description |
|---|---|---|
| items | Array | List of header objects (see field table below) |
| limit | Integer | Effective page size used (clamped 1-200) |
| offset | Integer | Effective starting index used |
| hasMore | Boolean | True if more rows exist beyond this page |
| count | Integer | Number of items in this response |
Header (each items[] entry)
| Name | Object | Description | Type | Data Length | Example | Mandatory |
|---|---|---|---|---|---|---|
| pocohVUuid | header | Virtual UUID, unique row identifier | String | 64 | 57583E9AF08A542CE0630B811DACCB66 | System Generated |
| pocohCompCode | header | Company code | String | 8 | ALT | Key |
| pocohCompName | header | Company name (lookup) | String | 30 | ALT Company | System Generated |
| pocohPoNum | header | Parent Purchase Order number | String | 11 | PO000004 | Key |
| pocohNum | header | Change order number | String | 11 | 1 | Key |
| pocohBchNum | header | Posting batch number | Number(11) | 11 | 42 | System Assigned |
| pocohVenCode | header | Vendor code | String | 8 | V0001 | False |
| pocohVenName | header | Vendor name (lookup) | String | 50 | ACME Supplies | System Generated |
| pocohDeptCode | header | Department code | String | 6 | ADMIN | False |
| pocohDeptName | header | Department name (lookup) | String | 30 | Administration | System Generated |
| pocohExptdDate | header | Expected date | Date | — | 2026-09-01 | False |
| pocohOrdDate | header | Order date | Date | — | 2026-08-20 | False |
| pocohRecDate | header | Receipt date | Date | — | 2026-09-05 | False |
| pocohTypeCode | header | Change order type code | String | 1 | S | False |
| pocohAdjCode | header | Adjustment code | String | 1 | A | False |
| pocohStatCode | header | Status code | String | 1 | O | System Assigned |
| pocohChgCode | header | Change code | String | 1 | C | False |
| pocohTermCode | header | Payment terms code | String | 6 | NET30 | False |
| pocohTermName | header | Payment terms name (lookup) | String | 30 | Net 30 Days | System Generated |
| pocohInvCode | header | Invoice code | String | 20 | INV001 | False |
| pocohInvDate | header | Invoice date | Date | — | 2026-09-10 | False |
| pocohInvDueDate | header | Invoice due date | Date | — | 2026-10-10 | False |
| pocohInvDiscDate | header | Invoice discount date | Date | — | 2026-09-20 | False |
| pocohInvDiscAmt | header | Invoice discount amount | Number(18,2) | 18,2 | 25.00 | False |
| pocohCurrCode | header | Currency code | String | 3 | USD | False |
| pocohCurrName | header | Currency name (lookup) | String | 30 | US Dollar | System Generated |
| pocohFobCode | header | FOB code | String | 2 | FO | False |
| pocohBuyCode | header | Buyer code | String | 30 | BUYER01 | False |
| pocohAddCode | header | Ship-to address code | String | 8 | ADDR01 | False |
| pocohShplneCode | header | Shipping line code | String | 3 | UPS | False |
| pocohShpmetCode | header | Shipping method code | String | 5 | GRND | False |
| pocohTxt1Code | header | Text code 1 | String | 8 | TXT01 | False |
| pocohTxt2Code | header | Text code 2 | String | 8 | TXT02 | False |
| pocohShpinstDesc | header | Shipping instructions | String | 2000 | Deliver to loading dock | False |
| pocohDesc1 | header | Description line 1 | String | 2000 | Revised material order | False |
| pocohDesc2 | header | Description line 2 | String | 2000 | Adds 2 items | False |
| pocohAdjPrice | header | Adjusted price total | Number(18,4) | 18,4 | 1250.0000 | False |
| pocohUnadjPrice | header | Unadjusted price total | Number(18,4) | 18,4 | 1200.0000 | False |
| pocohCurrConvNum | header | Currency conversion rate | Number(16,8) | 16,8 | 1.00000000 | False |
| pocohCostedCode | header | Costed flag | String | 1 | Y | False |
| pocohRefNum | header | Reference number | String | 11 | REF001 | False |
| pocohRefDate | header | Reference date | Date | — | 2026-08-15 | False |
| pocohReqCode | header | Requisition code | String | 30 | RQ000003 | False |
| pocohRecCode | header | Receiving code | String | 30 | REC001 | False |
| pocohReprintDate | header | Reprint date | Date | — | 2026-08-22 | False |
| pocohWipAccCode | header | WIP account code | String | 16 | WIP-01 | False |
| pocohWipAccName | header | WIP account name (lookup) | String | 30 | Work In Progress 01 | System Generated |
| pocohWipDeptCode | header | WIP department code | String | 6 | WIPD01 | False |
| pocohWipDeptName | header | WIP department name (lookup) | String | 30 | WIP Department 01 | System Generated |
| pocohShipinstTxt1Code..5Code | header | Shipping instruction text codes 1-5 | String | 8 each | TXT01 | False |
| pocohReleaseNum | header | PO release number this change order belongs to | Number(11) | 11 | 1 | Key |
| pocohBilltoAddCode | header | Bill-to address code | String | 8 | BILL01 | False |
| pocohReqReason | header | Requisition reason | String | 255 | Scope change | False |
| pocohInvTypeCode | header | Invoice type code | String | 1 | S | False |
| pocohImageFilename | header | Attached image filename | String | 255 | co_scan.pdf | False |
| pocohInvSerCode | header | Invoice series code | String | 4 | 2026 | False |
| pocohVendOrderAddCode | header | Vendor order address code | String | 5 | VOA01 | False |
| pocohComplianceFlag | header | Compliance flag (Y/N) | String | 1 | Y | False |
| pocohJobCompCode | header | Job company code | String | 8 | ALT | False |
| pocohJobCompName | header | Job company name (lookup) | String | 30 | ALT Company | System Generated |
| pocohJobCode | header | Job code | String | 10 | JOB001 | False |
| pocohJobName | header | Job name (lookup) | String | 60 | Office Renovation | System Generated |
| pocohContactCode | header | Contact code | String | 10 | CONT01 | False |
| pocohAddCompCode | header | Ship-to address company code | String | 8 | ALT | False |
| pocohAddCompName | header | Ship-to address company name (lookup) | String | 30 | ALT Company | System Generated |
| pocohPrintDate | header | Print date | Date | — | 2026-08-21 | False |
| pocohDefaultRecCode | header | Default receiving code | String | 1 | A | False |
| pocohDate | header | Change order date | Date | — | 2026-08-20 | False |
| pocohPoTotal | header | Total PO amount (calculated) | Number | — | 12500.00 | System Generated |
| pocohIuCreateDate | header | Record creation timestamp (ISO-8601) | Timestamp | — | 2026-08-20T10:15:00-04:00 | System Generated |
| pocohIuCreateUser | header | User who created the record | String | 30 | DA | System Generated |
| pocohIuUpdateDate | header | Record last update timestamp (ISO-8601) | Timestamp | — | 2026-08-21T09:00:00-04:00 | System Generated |
| pocohIuUpdateUser | header | User who last updated the record | String | 30 | DA | System Generated |
| pocohAcctDescription | header | Account description (lookup) | String | 500 | General WIP Account | System Generated |
| pocohDiscountPct | header | Discount percentage | Number(16,3) | 16,3 | 2.500 | False |
| pocohAddName | header | Ship-to address name (lookup) | String | 195 | Main Warehouse | System Generated |
Error Codes
| HTTP | Error Code | Reason |
|---|---|---|
| 400 | PO-000270-ERR | companyCode is required |
| 400 | PO-000278-ERR | poNumber is required when coNumber or releaseNumber is provided |
| 400 | PO-000279-ERR | auditDate is not a valid date in YYYY-MM-DD format |
| 404 | PO-000280-ERR | No records found matching the given search criteria (only when offset == 0) |
| 400 | (no error code — wrapped NumberFormatException) |
releaseNumber does not parse as an integer |
| 500 | (unhandled exception) | Any other unexpected error |
Basic authentication
OK
"{\n \"items\": [\n {\n \"pocohVUuid\": \"4E69C78977EAFD36E0630B811DAC6604\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"000014\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2014-05-16\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"R\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": 0,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": null,\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": 0,\n \"pocohUnadjPrice\": 0,\n \"pocohCurrConvNum\": 0,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": null,\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": null,\n \"pocohAddCompName\": null,\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": \"2020-05-06\",\n \"pocohPoTotal\": 5400,\n \"pocohIuCreateDate\": \"2020-05-06T10:24:28-04:00\",\n \"pocohIuCreateUser\": \"FERNANDO\",\n \"pocohIuUpdateDate\": \"2026-08-29T21:28:51-04:00\",\n \"pocohIuUpdateUser\": \"YASHB\",\n \"pocohAcctDescription\": \"DKI25\",\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"4E69C789797BFD36E0630B811DAC6604\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"04-DUPL001\",\n \"pocohNum\": \"2\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"A1METAL\",\n \"pocohVenName\": \"A1METAL\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2018-08-21T11:08:03-04:00\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"R\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": 0,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": null,\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": 0,\n \"pocohUnadjPrice\": 0,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": \"2020-05-20T12:56:03-04:00\",\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": \"04-DUPLICA\",\n \"pocohJobName\": \"#4 testing\",\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": \"2021-03-02\",\n \"pocohPoTotal\": 8640,\n \"pocohIuCreateDate\": \"2021-03-02T12:05:09-05:00\",\n \"pocohIuCreateUser\": \"PRIYA\",\n \"pocohIuUpdateDate\": \"2026-08-26T11:43:52-04:00\",\n \"pocohIuUpdateUser\": \"YASHB\",\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"4E69C78980A2FD36E0630B811DAC6604\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"ZZ01631\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": null,\n \"pocohOrdDate\": \"2024-05-07\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"R\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"TESTCO\",\n \"pocohTermName\": \"Test Code for Retainage\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": 0,\n \"pocohCurrCode\": \"CAD\",\n \"pocohCurrName\": \"Canadian Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": null,\n \"pocohAddCode\": \"AG1\",\n \"pocohShplneCode\": \"DHL\",\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": 0,\n \"pocohUnadjPrice\": 0,\n \"pocohCurrConvNum\": 0.76,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": \"ADD2\",\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": \"2024-05-07\",\n \"pocohPoTotal\": 74.85,\n \"pocohIuCreateDate\": \"2024-05-07T09:56:05-04:00\",\n \"pocohIuCreateUser\": \"PRIYA\",\n \"pocohIuUpdateDate\": \"2026-08-14T21:24:39-04:00\",\n \"pocohIuUpdateUser\": \"YASHB\",\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": \"AG1 \"\n },\n {\n \"pocohVUuid\": \"4E69C789878AFD36E0630B811DAC6604\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"PO-OMID080\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2025-07-15\",\n \"pocohOrdDate\": \"2025-07-14\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"TESTCO\",\n \"pocohTermName\": \"Test Code for Retainage\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": 0,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": \"21\",\n \"pocohBuyCode\": \"FERNANDO\",\n \"pocohAddCode\": \"ZZ\",\n \"pocohShplneCode\": \"ON1\",\n \"pocohShpmetCode\": \"OMIDN\",\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": \"This is the instructions line.\",\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": 0,\n \"pocohUnadjPrice\": 0,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"SHAHIDWS\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": \"2026-05-01\",\n \"pocohWipAccCode\": \"1000.100\",\n \"pocohWipAccName\": \"Bank of America\",\n \"pocohWipDeptCode\": \"00\",\n \"pocohWipDeptName\": \"Company Levaa\",\n \"pocohShipinstTxt1Code\": \"ZZ-SHIP1\",\n \"pocohShipinstTxt2Code\": \"ZZ-SHIP2\",\n \"pocohShipinstTxt3Code\": \"ZZ-SHIP2\",\n \"pocohShipinstTxt4Code\": \"ZZ-SHIP2\",\n \"pocohShipinstTxt5Code\": \"ZZ-SHIP3\",\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": \"NYC\",\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": \"A1\",\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": \"OMIDJOB\",\n \"pocohJobName\": \"Test Job for CRM/Asset Programming 123456789 ABCDEFGHIJKLMNO\",\n \"pocohContactCode\": \"ON\",\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": \"2026-05-01T17:27:41-04:00\",\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": \"2025-07-14\",\n \"pocohPoTotal\": 23812.98,\n \"pocohIuCreateDate\": \"2025-07-14T15:04:21-04:00\",\n \"pocohIuCreateUser\": \"ON\",\n \"pocohIuUpdateDate\": \"2026-08-31T22:32:01-04:00\",\n \"pocohIuUpdateUser\": \"YASHB\",\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": \"Default Primary Address 4850 Keele Street 751 Vaughan ON Canada M1A 6N7\"\n },\n {\n \"pocohVUuid\": \"584CFD32BC249E7AE0630B811DACF042\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"000028\",\n \"pocohNum\": \"2\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"AETNA\",\n \"pocohVenName\": \"Aetna Insurance\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2016-11-23T09:45:31-05:00\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"R\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": 0,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": null,\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": 0,\n \"pocohUnadjPrice\": 0,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": null,\n \"pocohRecCode\": null,\n \"pocohReprintDate\": \"2021-06-17T16:03:42-04:00\",\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": \"2026-08-05\",\n \"pocohPoTotal\": 2026.71,\n \"pocohIuCreateDate\": \"2026-08-05T10:54:37-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": \"2026-08-14T21:00:31-04:00\",\n \"pocohIuUpdateUser\": \"YASHB\",\n \"pocohAcctDescription\": \"DKI42\",\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"588C5B579E966090E0630B811DACDD81\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"ZZ-WMT004\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-WMT\",\n \"pocohVenName\": \"Wal-Mart Stores Inc\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2010-01-05\",\n \"pocohOrdDate\": \"2010-01-05\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": \"2020-05-12T11:17:55-04:00\",\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": null,\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": \"ZZ-WMT\",\n \"pocohJobName\": \"ZZ Walmart\",\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": null,\n \"pocohAddCompName\": null,\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 540,\n \"pocohIuCreateDate\": \"2026-08-08T12:25:05-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"588C5B579E9B6090E0630B811DACDD81\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"ZZ-WMT005\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-WMT\",\n \"pocohVenName\": \"Wal-Mart Stores Inc\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2010-01-05\",\n \"pocohOrdDate\": \"2010-01-05\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": \"ZZ-WMT\",\n \"pocohJobName\": \"ZZ Walmart\",\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": null,\n \"pocohAddCompName\": null,\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 810,\n \"pocohIuCreateDate\": \"2026-08-08T12:31:52-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"5896E4F9656EBBD9E0630B811DAC11C7\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"ZZ-WMT006\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": null,\n \"pocohOrdDate\": \"2021-10-27\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": \"ZJ\",\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": \"CNR\",\n \"pocohShpmetCode\": \"AIR\",\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1.17,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": \"A\",\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": \"ZZ-WMT\",\n \"pocohJobName\": \"ZZ Walmart\",\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": null,\n \"pocohAddCompName\": null,\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 92.88,\n \"pocohIuCreateDate\": \"2026-08-09T00:44:47-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58B39AE92EB7B246E0630B811DAC3A07\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"TEST05152\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2019-05-15T10:18:35-04:00\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 78000,\n \"pocohIuCreateDate\": \"2026-08-10T10:59:55-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58B39AE92EBCB246E0630B811DAC3A07\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"TEST05061\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2019-05-14T16:51:31-04:00\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 78000,\n \"pocohIuCreateDate\": \"2026-08-10T11:01:11-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58BBC22984B63F4CE0630B811DAC11DB\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"TEST05141\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": 226049,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2026-08-06\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"O\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": 0,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": 0,\n \"pocohUnadjPrice\": 0,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": \"2024-09-06T15:14:56-04:00\",\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": \"2026-08-10\",\n \"pocohPoTotal\": 78255,\n \"pocohIuCreateDate\": \"2026-08-10T20:43:24-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": \"2026-08-10T20:46:04-04:00\",\n \"pocohIuUpdateUser\": \"YASHB\",\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58C738AA3C350D21E0630B811DACA514\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"TEST0513\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2019-05-13T09:04:30-04:00\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 78000,\n \"pocohIuCreateDate\": \"2026-08-11T10:26:29-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58C738AA3C3A0D21E0630B811DACA514\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"TEST04143\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2019-05-14T16:02:57-04:00\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 78000,\n \"pocohIuCreateDate\": \"2026-08-11T10:27:53-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58C738AA3C410D21E0630B811DACA514\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"TEST05138\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2019-05-13T11:45:05-04:00\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 108,\n \"pocohIuCreateDate\": \"2026-08-11T10:40:07-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58C738AA3C460D21E0630B811DACA514\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"TEST05124\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2019-05-13T16:20:25-04:00\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 78000,\n \"pocohIuCreateDate\": \"2026-08-11T10:44:51-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58C738AA3C4F0D21E0630B811DACA514\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"TEST05151\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2019-05-15T09:49:55-04:00\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": \"2020-05-05T17:02:53-04:00\",\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 300,\n \"pocohIuCreateDate\": \"2026-08-11T11:04:33-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58CA201188D1245DE0630B811DACAB8B\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"TEST0512\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2019-05-13T15:43:10-04:00\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 78000,\n \"pocohIuCreateDate\": \"2026-08-11T14:03:54-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58CA201188D6245DE0630B811DACAB8B\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"TEST-0508\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2019-05-08T14:35:57-04:00\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": \"ZZZ01\",\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 10.8,\n \"pocohIuCreateDate\": \"2026-08-11T14:15:04-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58CA201188DB245DE0630B811DACAB8B\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"TESTFRI01\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2019-05-14T17:06:58-04:00\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 78000,\n \"pocohIuCreateDate\": \"2026-08-11T14:17:34-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58CA201188E0245DE0630B811DACAB8B\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"TEST123\",\n \"pocohNum\": \"3\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": null,\n \"pocohOrdDate\": \"2020-03-23\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": \"LGJOB\",\n \"pocohJobName\": \"ALT Test Project\",\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 1071,\n \"pocohIuCreateDate\": \"2026-08-11T14:29:15-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58CA201188E5245DE0630B811DACAB8B\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"000036\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n \"pocohOrdDate\": \"2018-04-27T15:22:42-04:00\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"KHALID\",\n \"pocohAddCode\": \"CORR01\",\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": \"2025-03-24T10:35:09-04:00\",\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": \"ADD1\",\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 115,\n \"pocohIuCreateDate\": \"2026-08-11T14:47:45-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": \"Correspondence Address 789 Portland Ave 3345w 789 Portland Ave #5671 345 789 Portland Ave 3345w New York City NY US 87612\"\n },\n {\n \"pocohVUuid\": \"58CA201188F5245DE0630B811DACAB8B\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"K000025\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": null,\n \"pocohOrdDate\": \"2020-08-25\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"R\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"DA\",\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"DA\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 20,\n \"pocohIuCreateDate\": \"2026-08-11T14:57:20-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": \"2026-08-29T21:31:44-04:00\",\n \"pocohIuUpdateUser\": \"YASHB\",\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58CEEE8CCAD6650DE0630B811DAC89C2\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"FM2\",\n \"pocohNum\": \"2\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": \"2020-03-10\",\n \"pocohOrdDate\": \"2020-03-03\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"N\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"NET30\",\n \"pocohTermName\": \"Net 30\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": null,\n \"pocohAddCode\": null,\n \"pocohShplneCode\": null,\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": \"Updated via Postman\",\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": null,\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": null,\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": null,\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 118.8,\n \"pocohIuCreateDate\": \"2026-08-11T22:46:40-04:00\",\n \"pocohIuCreateUser\": \"YASHB\",\n \"pocohIuUpdateDate\": \"2026-08-11T23:02:35-04:00\",\n \"pocohIuUpdateUser\": \"YASHB\",\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": null\n },\n {\n \"pocohVUuid\": \"58D1A04C41ADF457E0630B811DACB42C\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"DSFD\",\n \"pocohNum\": \"*\",\n \"pocohBchNum\": 225990,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": null,\n \"pocohOrdDate\": \"2026-08-11\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"O\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"TESTCO\",\n \"pocohTermName\": \"Test Code for Retainage\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": null,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"OO\",\n \"pocohAddCode\": \"ADD1\",\n \"pocohShplneCode\": \"DHL\",\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": null,\n \"pocohUnadjPrice\": null,\n \"pocohCurrConvNum\": 1.6,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"RR\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": \"ADD2\",\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": \"A1\",\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": null,\n \"pocohJobCompName\": null,\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": null,\n \"pocohPoTotal\": 27,\n \"pocohIuCreateDate\": \"2026-08-11T22:52:06-04:00\",\n \"pocohIuCreateUser\": \"DA\",\n \"pocohIuUpdateDate\": null,\n \"pocohIuUpdateUser\": null,\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n },\n {\n \"pocohVUuid\": \"58D1A04C41AFF457E0630B811DACB42C\",\n \"pocohCompCode\": \"ZZ\",\n \"pocohCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPoNum\": \"DSFD\",\n \"pocohNum\": \"1\",\n \"pocohBchNum\": null,\n \"pocohVenCode\": \"ZZ-ACME\",\n \"pocohVenName\": \"ZZ-Acme & Supply\",\n \"pocohDeptCode\": null,\n \"pocohDeptName\": null,\n \"pocohExptdDate\": null,\n \"pocohOrdDate\": \"2026-08-11\",\n \"pocohRecDate\": null,\n \"pocohTypeCode\": \"S\",\n \"pocohAdjCode\": null,\n \"pocohStatCode\": \"R\",\n \"pocohChgCode\": \"O\",\n \"pocohTermCode\": \"TESTCO\",\n \"pocohTermName\": \"Test Code for Retainage\",\n \"pocohInvCode\": null,\n \"pocohInvDate\": null,\n \"pocohInvDueDate\": null,\n \"pocohInvDiscDate\": null,\n \"pocohInvDiscAmt\": 0,\n \"pocohCurrCode\": \"US\",\n \"pocohCurrName\": \"US Dollars\",\n \"pocohFobCode\": null,\n \"pocohBuyCode\": \"OO\",\n \"pocohAddCode\": \"ADD1\",\n \"pocohShplneCode\": \"DHL\",\n \"pocohShpmetCode\": null,\n \"pocohTxt1Code\": null,\n \"pocohTxt2Code\": null,\n \"pocohShpinstDesc\": null,\n \"pocohDesc1\": null,\n \"pocohDesc2\": null,\n \"pocohAdjPrice\": 0,\n \"pocohUnadjPrice\": 0,\n \"pocohCurrConvNum\": 1.6,\n \"pocohCostedCode\": null,\n \"pocohRefNum\": null,\n \"pocohRefDate\": null,\n \"pocohReqCode\": \"RR\",\n \"pocohRecCode\": null,\n \"pocohReprintDate\": null,\n \"pocohWipAccCode\": null,\n \"pocohWipAccName\": null,\n \"pocohWipDeptCode\": null,\n \"pocohWipDeptName\": null,\n \"pocohShipinstTxt1Code\": null,\n \"pocohShipinstTxt2Code\": null,\n \"pocohShipinstTxt3Code\": null,\n \"pocohShipinstTxt4Code\": null,\n \"pocohShipinstTxt5Code\": null,\n \"pocohReleaseNum\": 1,\n \"pocohBilltoAddCode\": \"ADD2\",\n \"pocohReqReason\": null,\n \"pocohInvTypeCode\": null,\n \"pocohImageFilename\": null,\n \"pocohInvSerCode\": null,\n \"pocohVendOrderAddCode\": \"A1\",\n \"pocohComplianceFlag\": \"N\",\n \"pocohJobCompCode\": \"ZZ\",\n \"pocohJobCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohJobCode\": null,\n \"pocohJobName\": null,\n \"pocohContactCode\": null,\n \"pocohAddCompCode\": \"ZZ\",\n \"pocohAddCompName\": \"CMiC-ZZ Test Company Incorp\",\n \"pocohPrintDate\": null,\n \"pocohDefaultRecCode\": \"M\",\n \"pocohDate\": \"2026-08-11\",\n \"pocohPoTotal\": 27,\n \"pocohIuCreateDate\": \"2026-08-11T22:52:55-04:00\",\n \"pocohIuCreateUser\": \"DA\",\n \"pocohIuUpdateDate\": \"2026-08-11T22:53:34-04:00\",\n \"pocohIuUpdateUser\": \"DA\",\n \"pocohAcctDescription\": null,\n \"pocohDiscountPct\": 0,\n \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n }\n ],\n \"limit\": 25,\n \"offset\": 0,\n \"hasMore\": true,\n \"count\": 25\n}"