Get Po change order by filters

Prev Next
Get
/po-rest-api/jersey/v1/po-change-order

PO Change Order — List (Header + Lines)

Overview

Returns a paginated list of change orders, each item containing the change order header plus
its associated summary lines. At least one filter query parameter must be supplied or the
request is rejected — there is no "list everything" mode.

Notes

  • Child lines for the whole page of headers are fetched in a single batched query (not one
    query per header) for efficiency.

  • One extra header row beyond limit is always fetched so hasMore reflects whether a real
    next record exists, rather than assuming a full page means there's more.

  • hasMore/count describe the header page; the number of lines per header is not capped
    by limit.

  • Only the first page (offset == 0) returning zero headers is treated as "no results" and
    raises an error; a later empty page just means pagination has run past the end.

UI Navigation

Asset Management → Purchase Order → Change Orders → Enter Change Order

Finders

No named finders — filtering is done entirely through the query parameters below.

HTTP Method & Endpoint

GET {base_url}/po-rest-api/jersey/v1/po-change-order

Path Parameters

None.

Query Parameters

Parameter Type Required Default Description
companyCode String True (at least one filter required) — Filters POCOH_COMP_CODE (exact match, case-insensitive — uppercased before use)
poNumber String Conditional — Filters POCOH_PO_NUM. Required if coNumber or releaseNumber is supplied
coNumber String False — Filters POCOH_NUM
releaseNumber String False — Filters POCOH_RELEASE_NUM. Must parse as an integer
auditDate String False — Returns rows where GREATEST(create_date, update_date) >= auditDate. Format YYYY-MM-DD
limit Integer False 25 Max change order headers to return; capped at 200
offset Integer False 0 Zero-based starting index
orderBy String False POCOH_OBJECT_ORASEQ (tiebreaker) Sort expression, e.g. poNumber DESC. Accepted keys: companyCode, poNumber, coNumber, releaseNumber, createDate, updateDate, oraseq. Unknown keys are ignored and fall back to the tiebreaker column

Filter combination rule: companyCode is always required. If coNumber and/or
releaseNumber is supplied without poNumber, the request is rejected — poNumber must be
present whenever a more specific filter is used.

Example Request

curl -X GET "{base_url}/po-rest-api/jersey/v1/po-change-order?companyCode=ALT&poNumber=PO000004&limit=25&offset=0&orderBy=coNumber+DESC" \
  -H "Authorization: Basic {credentials}"

curl -X GET "{base_url}/po-rest-api/jersey/v1/po-change-order?companyCode=ALT&auditDate=2026-08-01" \
  -H "Authorization: Basic {credentials}"

Example Response (200 OK)

{
  "items": [
    {
      "header": { "pocohVUuid": "...", "pocohCompCode": "ALT", "pocohPoNum": "PO000004", "pocohNum": "1" },
      "lines": [ { "pocsVUuid": "...", "pocsLineNum": 1 } ]
    }
  ],
  "limit": 25,
  "offset": 0,
  "hasMore": false,
  "count": 1
}

Attributes

Response envelope:

Field Type Description
items Array List of { header, lines } objects (see field tables below)
limit Integer Effective page size used (clamped 1-200)
offset Integer Effective starting index used (floored at 0)
hasMore Boolean True if more header rows exist beyond this page
count Integer Number of header items in this response

Header (header object)

Name Object Description Type Data Length Example Mandatory
pocohVUuid header Virtual UUID, unique row identifier String 64 57583E9AF08A542CE0630B811DACCB66 System Generated
pocohCompCode header Company code String 8 ALT Key
pocohCompName header Company name (lookup) String 30 ALT Company System Generated
pocohPoNum header Parent Purchase Order number String 11 PO000004 Key
pocohNum header Change order number String 11 1 Key
pocohBchNum header Posting batch number Number(11) 11 42 System Assigned
pocohVenCode header Vendor code String 8 V0001 False
pocohVenName header Vendor name (lookup) String 50 ACME Supplies System Generated
pocohDeptCode header Department code String 6 ADMIN False
pocohDeptName header Department name (lookup) String 30 Administration System Generated
pocohExptdDate header Expected date Date — 2026-09-01 False
pocohOrdDate header Order date Date — 2026-08-20 False
pocohRecDate header Receipt date Date — 2026-09-05 False
pocohTypeCode header Change order type code String 1 S False
pocohAdjCode header Adjustment code String 1 A False
pocohStatCode header Status code String 1 O System Assigned
pocohChgCode header Change code String 1 C False
pocohTermCode header Payment terms code String 6 NET30 False
pocohTermName header Payment terms name (lookup) String 30 Net 30 Days System Generated
pocohInvCode header Invoice code String 20 INV001 False
pocohInvDate header Invoice date Date — 2026-09-10 False
pocohInvDueDate header Invoice due date Date — 2026-10-10 False
pocohInvDiscDate header Invoice discount date Date — 2026-09-20 False
pocohInvDiscAmt header Invoice discount amount Number(18,2) 18,2 25.00 False
pocohCurrCode header Currency code String 3 USD False
pocohCurrName header Currency name (lookup) String 30 US Dollar System Generated
pocohFobCode header FOB code String 2 FO False
pocohBuyCode header Buyer code String 30 BUYER01 False
pocohAddCode header Ship-to address code String 8 ADDR01 False
pocohShplneCode header Shipping line code String 3 UPS False
pocohShpmetCode header Shipping method code String 5 GRND False
pocohTxt1Code header Text code 1 String 8 TXT01 False
pocohTxt2Code header Text code 2 String 8 TXT02 False
pocohShpinstDesc header Shipping instructions String 2000 Deliver to loading dock False
pocohDesc1 header Description line 1 String 2000 Revised material order False
pocohDesc2 header Description line 2 String 2000 Adds 2 items False
pocohAdjPrice header Adjusted price total Number(18,4) 18,4 1250.0000 False
pocohUnadjPrice header Unadjusted price total Number(18,4) 18,4 1200.0000 False
pocohCurrConvNum header Currency conversion rate Number(16,8) 16,8 1.00000000 False
pocohCostedCode header Costed flag String 1 Y False
pocohRefNum header Reference number String 11 REF001 False
pocohRefDate header Reference date Date — 2026-08-15 False
pocohReqCode header Requisition code String 30 RQ000003 False
pocohRecCode header Receiving code String 30 REC001 False
pocohReprintDate header Reprint date Date — 2026-08-22 False
pocohWipAccCode header WIP account code String 16 WIP-01 False
pocohWipAccName header WIP account name (lookup) String 30 Work In Progress 01 System Generated
pocohWipDeptCode header WIP department code String 6 WIPD01 False
pocohWipDeptName header WIP department name (lookup) String 30 WIP Department 01 System Generated
pocohShipinstTxt1Code..5Code header Shipping instruction text codes 1-5 String 8 each TXT01 False
pocohReleaseNum header PO release number this change order belongs to Number(11) 11 1 Key
pocohBilltoAddCode header Bill-to address code String 8 BILL01 False
pocohReqReason header Requisition reason String 255 Scope change False
pocohInvTypeCode header Invoice type code String 1 S False
pocohImageFilename header Attached image filename String 255 co_scan.pdf False
pocohInvSerCode header Invoice series code String 4 2026 False
pocohVendOrderAddCode header Vendor order address code String 5 VOA01 False
pocohComplianceFlag header Compliance flag (Y/N) String 1 Y False
pocohJobCompCode header Job company code String 8 ALT False
pocohJobCompName header Job company name (lookup) String 30 ALT Company System Generated
pocohJobCode header Job code String 10 JOB001 False
pocohJobName header Job name (lookup) String 60 Office Renovation System Generated
pocohContactCode header Contact code String 10 CONT01 False
pocohAddCompCode header Ship-to address company code String 8 ALT False
pocohAddCompName header Ship-to address company name (lookup) String 30 ALT Company System Generated
pocohPrintDate header Print date Date — 2026-08-21 False
pocohDefaultRecCode header Default receiving code String 1 A False
pocohDate header Change order date Date — 2026-08-20 False
pocohPoTotal header Total PO amount (calculated) Number — 12500.00 System Generated
pocohIuCreateDate header Record creation timestamp (ISO-8601) Timestamp — 2026-08-20T10:15:00-04:00 System Generated
pocohIuCreateUser header User who created the record String 30 DA System Generated
pocohIuUpdateDate header Record last update timestamp (ISO-8601) Timestamp — 2026-08-21T09:00:00-04:00 System Generated
pocohIuUpdateUser header User who last updated the record String 30 DA System Generated
pocohAcctDescription header Account description (lookup) String 500 General WIP Account System Generated
pocohDiscountPct header Discount percentage Number(16,3) 16,3 2.500 False
pocohAddName header Ship-to address name (lookup) String 195 Main Warehouse System Generated

Lines (lines array items)

Name Object Description Type Data Length Example Mandatory
pocsVUuid line Virtual UUID, unique row identifier String 64 57583E9AF08B542CE0630B811DACCB66 System Generated
pocsCompCode line Company code String 8 ALT Key
pocsPoNum line Parent PO number String 11 PO000004 Key
pocsNum line Change order number String 11 1 Key
pocsReleaseNum line Release number Number(11) 11 1 Key
pocsLineNum line Summary line number Number(6) 6 1 Key
pocsCiitemtypCode line item type code String 2 MA False
pocsClassCode line Item class code String 4 OFF1 False
pocsDesc line Line description String 4000 Revised paper order False
pocsDiscountPct line Discount percentage Number — 2.500 False
pocsExptdPriceAmt line Expected unit price Number — 12.5000 False
pocsExtdAmt line Extended amount (calculated) Number — 1250.00 System Generated
pocsItemLocCode line Item location code String 7 ILOC01 False
pocsItmCode line Item/product code String 16 PAPER-A4 False
pocsItmName line Item/product name (lookup) String 4000 A4 Copy Paper System Generated
pocsJobName line Job name (lookup) String 60 Office Renovation System Generated
pocsPhsName line Phase name (lookup) String 50 Phase 1 System Generated
pocsCatName line Category name (lookup) String 30 Supplies System Generated
pocsLumpSumPoFlag line Lump-sum PO flag (Y/N, calculated) String 1 N System Generated
pocsOrdQty line Quantity ordered Number — 100.0000 False
pocsOvrdExptdPriceFlag line Override expected price flag (Y/N) String 1 Y False
pocsPoItemType line PO item type (I=Inventory, N=Non-stock, F=Free-form) String 1 N False
pocsPoOrdQty line PO ordered quantity (calculated) Number — 80.0000 System Generated
pocsPoOrderedQty line PO ordered quantity, alt calculation (calculated) Number — 80.0000 System Generated
pocsPoPriceAmt line PO price amount (calculated) Number — 12.5000 System Generated
pocsPobldLineNum line Source PO build line number (calculated) Number(6) 6 1 System Generated
pocsRecIntoInvFlag line Receive into inventory flag (Y/N) String 1 Y False
pocsSuggestedPrice line Suggested price (calculated) Number — 12.5000 System Generated
pocsTax1Code / Tax2Code / Tax3Code line Tax codes 1-3 String 11 each HST False
pocsTax1TaxableFlag / Tax2.../Tax3... line Taxable flags for tax 1-3 (Y/N) String 1 each Y False
pocsTaxAmt line Tax amount (calculated) Number — 150.00 System Generated
pocsTotAmt line Total amount (calculated) Number — 1400.00 System Generated
pocsUserField1..8 line User-defined fields 1-8 String 60 each — False
pocsUserTypeCode line User-defined type code String 3 STD False
pocsWmCode line Unit of measure code String 2 BX False
pocsTavCode1..4 line TAV codes 1-4 String 10 each TAV01 False
pocsWbsvCode1..8 line WBS value codes 1-8 (always disabled in CMiC UI) String 60 each — System Generated
pocsWbsvCode9..12 line WBS value codes 9-12 String 60 each — False
pocsIuCreateDate line Record creation timestamp (ISO-8601) Timestamp — 2026-08-20T10:15:00-04:00 System Generated
pocsIuUpdateDate line Record last update timestamp (ISO-8601) Timestamp — 2026-08-21T09:00:00-04:00 System Generated

Error Codes

HTTP Error Code Reason
400 PO-000270-ERR companyCode is required
400 PO-000278-ERR poNumber is required when coNumber or releaseNumber is provided
400 PO-000279-ERR auditDate is not a valid date in YYYY-MM-DD format
404 PO-000280-ERR No records found matching the given search criteria (only when offset == 0)
400 (no error code — wrapped NumberFormatException) releaseNumber does not parse as an integer while building the WHERE clause
500 (unhandled exception) Any other unexpected error
Security
HTTP
Type basic

Basic authentication

Query parameters
companyCode
string
ExampleZZ
orderBy
string
ExamplecreateDate DESC
auditDate
string
Example2026-08-08
Responses
200

OK

Headers
Content-Type
string
Exampleapplication/json
"{\n    \"items\": [\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5A7073256BB262A9E0630B811DACAEBE\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"NSM-DP-08\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 227154,\n                \"pocohVenCode\": \"ZZ-NSM\",\n                \"pocohVenName\": \"NSM FIRE ENGINEERING LLC\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-07-01\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": \"123456\",\n                \"pocohWipDeptName\": \"6 digit\",\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 2150,\n                \"pocohIuCreateDate\": \"2026-09-01T13:43:03-04:00\",\n                \"pocohIuCreateUser\": \"MNAS\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5A6CC006C0C95938E0630B811DACCEE2\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"NSM-DP-07\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 227129,\n                \"pocohVenCode\": \"ZZ-NSM\",\n                \"pocohVenName\": \"NSM FIRE ENGINEERING LLC\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-07-01\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": \"123456\",\n                \"pocohWipDeptName\": \"6 digit\",\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 2150,\n                \"pocohIuCreateDate\": \"2026-09-01T09:18:54-04:00\",\n                \"pocohIuCreateUser\": \"MNAS\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5A5E37B218E184B2E0630B811DAC037A\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"NSM-STD-03\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 227119,\n                \"pocohVenCode\": \"ZZ-NSM\",\n                \"pocohVenName\": \"NSM FIRE ENGINEERING LLC\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-07-01\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": \"5200.100\",\n                \"pocohWipAccName\": \"Job Cost Expenses\",\n                \"pocohWipDeptCode\": \"123456\",\n                \"pocohWipDeptName\": \"6 digit\",\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 2150,\n                \"pocohIuCreateDate\": \"2026-08-31T16:00:11-04:00\",\n                \"pocohIuCreateUser\": \"MNAS\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5A5C46F9DB3FB571E0630B811DACDC8C\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"NSM-STD-02\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 227117,\n                \"pocohVenCode\": \"ZZ-NSM\",\n                \"pocohVenName\": \"NSM FIRE ENGINEERING LLC\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-07-01\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": \"5200.100\",\n                \"pocohWipAccName\": \"Job Cost Expenses\",\n                \"pocohWipDeptCode\": \"123456\",\n                \"pocohWipDeptName\": \"6 digit\",\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 2150,\n                \"pocohIuCreateDate\": \"2026-08-31T13:41:26-04:00\",\n                \"pocohIuCreateUser\": \"MNAS\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5A5C46F9DB30B571E0630B811DACDC8C\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"NSM-STD-01\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 227116,\n                \"pocohVenCode\": \"ZZ-NSM\",\n                \"pocohVenName\": \"NSM FIRE ENGINEERING LLC\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-07-01\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": \"5200.100\",\n                \"pocohWipAccName\": \"Job Cost Expenses\",\n                \"pocohWipDeptCode\": \"123456\",\n                \"pocohWipDeptName\": \"6 digit\",\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 2150,\n                \"pocohIuCreateDate\": \"2026-08-31T13:40:45-04:00\",\n                \"pocohIuCreateUser\": \"MNAS\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5A23F268B02EA381E0630B811DACF097\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"NSM-DP-06\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 227094,\n                \"pocohVenCode\": \"ZZ-NSM\",\n                \"pocohVenName\": \"NSM FIRE ENGINEERING LLC\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-07-01\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": \"123456\",\n                \"pocohWipDeptName\": \"6 digit\",\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 2050,\n                \"pocohIuCreateDate\": \"2026-08-28T18:28:04-04:00\",\n                \"pocohIuCreateUser\": \"MNAS\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5A1DA3B373CC36A6E0630B811DAC6B99\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"NSM-DP-05\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 227050,\n                \"pocohVenCode\": \"ZZ-NSM\",\n                \"pocohVenName\": \"NSM FIRE ENGINEERING LLC\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-07-01\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": \"123456\",\n                \"pocohWipDeptName\": \"6 digit\",\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 2050,\n                \"pocohIuCreateDate\": \"2026-08-28T10:57:30-04:00\",\n                \"pocohIuCreateUser\": \"MNAS\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5A0A02EA24AD3425E0630B811DACB1B8\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"POLKASD\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 226992,\n                \"pocohVenCode\": \"ZZ-WMT\",\n                \"pocohVenName\": \"Wal-Mart Stores Inc\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-08-27\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": \"DA\",\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": \"DHL\",\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": null,\n                \"pocohWipDeptName\": null,\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 0,\n                \"pocohIuCreateDate\": \"2026-08-27T11:30:55-04:00\",\n                \"pocohIuCreateUser\": \"PRIYA\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5A09FAAE63FB2A8CE0630B811DAC97AA\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"POKJYU\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 226991,\n                \"pocohVenCode\": \"ZZ-WMT\",\n                \"pocohVenName\": \"Wal-Mart Stores Inc\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-08-27\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": \"DA\",\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": \"DHL\",\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": null,\n                \"pocohWipDeptName\": null,\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 44,\n                \"pocohIuCreateDate\": \"2026-08-27T11:28:53-04:00\",\n                \"pocohIuCreateUser\": \"PRIYA\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5A093FE4724720EEE0630B811DACA7B0\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"PO129845\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 226986,\n                \"pocohVenCode\": \"ZZ-WMT\",\n                \"pocohVenName\": \"Wal-Mart Stores Inc\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-08-27\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": \"DA\",\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": \"DHL\",\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": null,\n                \"pocohWipDeptName\": null,\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 39,\n                \"pocohIuCreateDate\": \"2026-08-27T10:38:11-04:00\",\n                \"pocohIuCreateUser\": \"PRIYA\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"59F64D867562FAD9E0630B811DAC60D3\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"NSM-DP-04\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 226954,\n                \"pocohVenCode\": \"ZZ-NSM\",\n                \"pocohVenName\": \"NSM FIRE ENGINEERING LLC\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-07-01\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": \"123456\",\n                \"pocohWipDeptName\": \"6 digit\",\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 2100,\n                \"pocohIuCreateDate\": \"2026-08-26T12:00:41-04:00\",\n                \"pocohIuCreateUser\": \"MNAS\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"59F3CD18469380F8E0630B811DAC3425\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"NSM-DP-03\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 226934,\n                \"pocohVenCode\": \"ZZ-NSM\",\n                \"pocohVenName\": \"NSM FIRE ENGINEERING LLC\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-07-01\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": \"123456\",\n                \"pocohWipDeptName\": \"6 digit\",\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 2100,\n                \"pocohIuCreateDate\": \"2026-08-26T09:08:55-04:00\",\n                \"pocohIuCreateUser\": \"MNAS\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"59E49E2FB0886856E0630B811DAC4C77\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"NSM-DP-02\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 226899,\n                \"pocohVenCode\": \"ZZ-NSM\",\n                \"pocohVenName\": \"NSM FIRE ENGINEERING LLC\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-07-01\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": \"123456\",\n                \"pocohWipDeptName\": \"6 digit\",\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 2100,\n                \"pocohIuCreateDate\": \"2026-08-25T14:54:06-04:00\",\n                \"pocohIuCreateUser\": \"MNAS\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"59E15F64630240E9E0630B811DACFC84\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"NSM-DP-01\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 226860,\n                \"pocohVenCode\": \"ZZ-NSM\",\n                \"pocohVenName\": \"NSM FIRE ENGINEERING LLC\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-07-01\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": \"123456\",\n                \"pocohWipDeptName\": \"6 digit\",\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 2100,\n                \"pocohIuCreateDate\": \"2026-08-25T11:08:57-04:00\",\n                \"pocohIuCreateUser\": \"MNAS\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"59D30FC74F0A5D2FE0630B811DAC8AD9\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"UFMU24015-4\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 226826,\n                \"pocohVenCode\": \"ZZ-ACME\",\n                \"pocohVenName\": \"ZZ-Acme & Supply\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-08-19\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"TESTCO\",\n                \"pocohTermName\": \"Test Code for Retainage\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": \"ON\",\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": \"DHL\",\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": null,\n                \"pocohWipDeptName\": null,\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": \"A1\",\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"A\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 20000,\n                \"pocohIuCreateDate\": \"2026-08-24T18:00:31-04:00\",\n                \"pocohIuCreateUser\": \"MUDDIN\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"59D250998DE85CDDE0630B811DACD5F2\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"UFMU24015-2\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 226819,\n                \"pocohVenCode\": \"ZZ-ACME\",\n                \"pocohVenName\": \"ZZ-Acme & Supply\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-08-19\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"TESTCO\",\n                \"pocohTermName\": \"Test Code for Retainage\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": \"ON\",\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": \"DHL\",\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": null,\n                \"pocohWipDeptName\": null,\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": \"A1\",\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"A\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 20000,\n                \"pocohIuCreateDate\": \"2026-08-24T17:06:48-04:00\",\n                \"pocohIuCreateUser\": \"MUDDIN\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"59D048906EAA4B9BE0630B811DACAC17\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"UFMU24015-1\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 226789,\n                \"pocohVenCode\": \"ZZ-ACME\",\n                \"pocohVenName\": \"ZZ-Acme & Supply\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-08-19\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"TESTCO\",\n                \"pocohTermName\": \"Test Code for Retainage\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": \"ON\",\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": \"DHL\",\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": null,\n                \"pocohWipDeptName\": null,\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": \"A1\",\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"A\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 10000,\n                \"pocohIuCreateDate\": \"2026-08-24T14:38:27-04:00\",\n                \"pocohIuCreateUser\": \"MUDDIN\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"59CE93A4AC80F00EE0630B811DACC0E6\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"UFMU24015\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 226782,\n                \"pocohVenCode\": \"ZZ-ACME\",\n                \"pocohVenName\": \"ZZ-Acme & Supply\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-08-19\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"TESTCO\",\n                \"pocohTermName\": \"Test Code for Retainage\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": \"ON\",\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": \"DHL\",\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": null,\n                \"pocohWipDeptName\": null,\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": \"A1\",\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"A\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 10000,\n                \"pocohIuCreateDate\": \"2026-08-24T13:41:29-04:00\",\n                \"pocohIuCreateUser\": \"MUDDIN\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"59960B1DFD3D3623E0630B811DAC2BA3\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"PO-NSM-01\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 226740,\n                \"pocohVenCode\": \"ZZ-NSM\",\n                \"pocohVenName\": \"NSM FIRE ENGINEERING LLC\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-07-01\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": \"123456\",\n                \"pocohWipDeptName\": \"6 digit\",\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 2300,\n                \"pocohIuCreateDate\": \"2026-08-21T17:21:47-04:00\",\n                \"pocohIuCreateUser\": \"MNAS\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"597D55EC83FBE2ABE0630B811DAC5432\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"MU24015-2\",\n                \"pocohNum\": \"*\",\n                \"pocohBchNum\": 226691,\n                \"pocohVenCode\": \"ZZ-ACME\",\n                \"pocohVenName\": \"ZZ-Acme & Supply\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-08-19\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"TESTCO\",\n                \"pocohTermName\": \"Test Code for Retainage\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": \"ON\",\n                \"pocohAddCode\": \"ADD1\",\n                \"pocohShplneCode\": \"DHL\",\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1.6,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": null,\n                \"pocohWipDeptName\": null,\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"ADD2\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": \"A1\",\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": null,\n                \"pocohJobCompName\": null,\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"A\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 10000,\n                \"pocohIuCreateDate\": \"2026-08-20T11:48:12-04:00\",\n                \"pocohIuCreateUser\": \"MUDDIN\",\n                \"pocohIuUpdateDate\": null,\n                \"pocohIuUpdateUser\": null,\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"Name 1 Test Street 123 TEST SUITE TORONTO ON Canada M4H 1J5\"\n            },\n            \"lines\": []\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5971E195ED7B2529E0630B811DACA533\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"987893\",\n                \"pocohNum\": \"4\",\n                \"pocohBchNum\": 226656,\n                \"pocohVenCode\": \"ZZ-ACME\",\n                \"pocohVenName\": \"ZZ-Acme & Supply\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-08-20\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"A\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": 0,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": null,\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": 0,\n                \"pocohUnadjPrice\": 0,\n                \"pocohCurrConvNum\": 1,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": null,\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": null,\n                \"pocohWipDeptName\": null,\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": null,\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": \"ZZ\",\n                \"pocohJobCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"A\",\n                \"pocohDate\": \"2026-08-19\",\n                \"pocohPoTotal\": 32.05,\n                \"pocohIuCreateDate\": \"2026-08-19T22:13:27-04:00\",\n                \"pocohIuCreateUser\": \"YASHB\",\n                \"pocohIuUpdateDate\": \"2026-08-19T22:14:49-04:00\",\n                \"pocohIuUpdateUser\": \"YASHB\",\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": null\n            },\n            \"lines\": [\n                {\n                    \"pocsVUuid\": \"5971E195ED7C2529E0630B811DACA533\",\n                    \"pocsCompCode\": \"ZZ\",\n                    \"pocsPoNum\": \"987893\",\n                    \"pocsNum\": \"4\",\n                    \"pocsReleaseNum\": 1,\n                    \"pocsLineNum\": 1,\n                    \"pocsCiitemtypCode\": null,\n                    \"pocsClassCode\": null,\n                    \"pocsDesc\": null,\n                    \"pocsDiscountPct\": 0,\n                    \"pocsExptdPriceAmt\": 1,\n                    \"pocsExtdAmt\": 10,\n                    \"pocsItemLocCode\": null,\n                    \"pocsItmCode\": \"TES3\",\n                    \"pocsItmName\": \"TES3\",\n                    \"pocsJobName\": null,\n                    \"pocsPhsName\": null,\n                    \"pocsCatName\": null,\n                    \"pocsLumpSumPoFlag\": null,\n                    \"pocsOrdQty\": 10,\n                    \"pocsOvrdExptdPriceFlag\": \"N\",\n                    \"pocsPoItemType\": \"F\",\n                    \"pocsPoOrdQty\": 31,\n                    \"pocsPoOrderedQty\": 31,\n                    \"pocsPoPriceAmt\": 1,\n                    \"pocsPobldLineNum\": null,\n                    \"pocsRecIntoInvFlag\": \"N\",\n                    \"pocsSuggestedPrice\": null,\n                    \"pocsTax1Code\": null,\n                    \"pocsTax1TaxableFlag\": \"Y\",\n                    \"pocsTax2Code\": null,\n                    \"pocsTax2TaxableFlag\": \"Y\",\n                    \"pocsTax3Code\": null,\n                    \"pocsTax3TaxableFlag\": \"Y\",\n                    \"pocsTaxAmt\": 0,\n                    \"pocsTotAmt\": 10,\n                    \"pocsUserField1\": \"ZZ\",\n                    \"pocsUserField2\": \"00\",\n                    \"pocsUserField3\": \"1000.100\",\n                    \"pocsUserField4\": null,\n                    \"pocsUserField5\": null,\n                    \"pocsUserField6\": null,\n                    \"pocsUserField7\": null,\n                    \"pocsUserField8\": null,\n                    \"pocsUserTypeCode\": \"G\",\n                    \"pocsWmCode\": \"EA\",\n                    \"pocsTavCode1\": null,\n                    \"pocsTavCode2\": null,\n                    \"pocsTavCode3\": null,\n                    \"pocsTavCode4\": null,\n                    \"pocsWbsvCode1\": null,\n                    \"pocsWbsvCode2\": null,\n                    \"pocsWbsvCode3\": null,\n                    \"pocsWbsvCode4\": null,\n                    \"pocsWbsvCode5\": null,\n                    \"pocsWbsvCode6\": null,\n                    \"pocsWbsvCode7\": null,\n                    \"pocsWbsvCode8\": null,\n                    \"pocsWbsvCode9\": null,\n                    \"pocsWbsvCode10\": null,\n                    \"pocsWbsvCode11\": null,\n                    \"pocsWbsvCode12\": null,\n                    \"pocsIuCreateDate\": \"2026-08-19T22:13:28-04:00\",\n                    \"pocsIuUpdateDate\": \"2026-08-19T22:14:23-04:00\"\n                },\n                {\n                    \"pocsVUuid\": \"5971E195ED7E2529E0630B811DACA533\",\n                    \"pocsCompCode\": \"ZZ\",\n                    \"pocsPoNum\": \"987893\",\n                    \"pocsNum\": \"4\",\n                    \"pocsReleaseNum\": 1,\n                    \"pocsLineNum\": 2,\n                    \"pocsCiitemtypCode\": null,\n                    \"pocsClassCode\": null,\n                    \"pocsDesc\": null,\n                    \"pocsDiscountPct\": 0,\n                    \"pocsExptdPriceAmt\": 1,\n                    \"pocsExtdAmt\": 0,\n                    \"pocsItemLocCode\": null,\n                    \"pocsItmCode\": \"CZXCSDC\",\n                    \"pocsItmName\": \"FDVDFFD\",\n                    \"pocsJobName\": null,\n                    \"pocsPhsName\": null,\n                    \"pocsCatName\": null,\n                    \"pocsLumpSumPoFlag\": null,\n                    \"pocsOrdQty\": 0,\n                    \"pocsOvrdExptdPriceFlag\": null,\n                    \"pocsPoItemType\": \"F\",\n                    \"pocsPoOrdQty\": 1,\n                    \"pocsPoOrderedQty\": 1,\n                    \"pocsPoPriceAmt\": 1,\n                    \"pocsPobldLineNum\": null,\n                    \"pocsRecIntoInvFlag\": \"N\",\n                    \"pocsSuggestedPrice\": null,\n                    \"pocsTax1Code\": \"GT\",\n                    \"pocsTax1TaxableFlag\": \"Y\",\n                    \"pocsTax2Code\": null,\n                    \"pocsTax2TaxableFlag\": \"Y\",\n                    \"pocsTax3Code\": null,\n                    \"pocsTax3TaxableFlag\": \"Y\",\n                    \"pocsTaxAmt\": 0,\n                    \"pocsTotAmt\": 0,\n                    \"pocsUserField1\": \"ZZ\",\n                    \"pocsUserField2\": \"00\",\n                    \"pocsUserField3\": \"1000.100\",\n                    \"pocsUserField4\": null,\n                    \"pocsUserField5\": null,\n                    \"pocsUserField6\": null,\n                    \"pocsUserField7\": null,\n                    \"pocsUserField8\": null,\n                    \"pocsUserTypeCode\": \"G\",\n                    \"pocsWmCode\": \"EA\",\n                    \"pocsTavCode1\": null,\n                    \"pocsTavCode2\": null,\n                    \"pocsTavCode3\": null,\n                    \"pocsTavCode4\": null,\n                    \"pocsWbsvCode1\": null,\n                    \"pocsWbsvCode2\": null,\n                    \"pocsWbsvCode3\": null,\n                    \"pocsWbsvCode4\": null,\n                    \"pocsWbsvCode5\": null,\n                    \"pocsWbsvCode6\": null,\n                    \"pocsWbsvCode7\": null,\n                    \"pocsWbsvCode8\": null,\n                    \"pocsWbsvCode9\": null,\n                    \"pocsWbsvCode10\": null,\n                    \"pocsWbsvCode11\": null,\n                    \"pocsWbsvCode12\": null,\n                    \"pocsIuCreateDate\": \"2026-08-19T22:13:29-04:00\",\n                    \"pocsIuUpdateDate\": null\n                }\n            ]\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5971E195ED6F2529E0630B811DACA533\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"987893\",\n                \"pocohNum\": \"3\",\n                \"pocohBchNum\": 226654,\n                \"pocohVenCode\": \"ZZ-ACME\",\n                \"pocohVenName\": \"ZZ-Acme & Supply\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-08-19\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"A\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": 0,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": null,\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": 0,\n                \"pocohUnadjPrice\": 0,\n                \"pocohCurrConvNum\": 1,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": null,\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": null,\n                \"pocohWipDeptName\": null,\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": null,\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": \"ZZ\",\n                \"pocohJobCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"A\",\n                \"pocohDate\": \"2026-08-19\",\n                \"pocohPoTotal\": 32.05,\n                \"pocohIuCreateDate\": \"2026-08-19T22:07:27-04:00\",\n                \"pocohIuCreateUser\": \"YASHB\",\n                \"pocohIuUpdateDate\": \"2026-08-19T22:08:52-04:00\",\n                \"pocohIuUpdateUser\": \"YASHB\",\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": null\n            },\n            \"lines\": [\n                {\n                    \"pocsVUuid\": \"5971E195ED702529E0630B811DACA533\",\n                    \"pocsCompCode\": \"ZZ\",\n                    \"pocsPoNum\": \"987893\",\n                    \"pocsNum\": \"3\",\n                    \"pocsReleaseNum\": 1,\n                    \"pocsLineNum\": 1,\n                    \"pocsCiitemtypCode\": null,\n                    \"pocsClassCode\": null,\n                    \"pocsDesc\": null,\n                    \"pocsDiscountPct\": 0,\n                    \"pocsExptdPriceAmt\": 1,\n                    \"pocsExtdAmt\": 10,\n                    \"pocsItemLocCode\": null,\n                    \"pocsItmCode\": \"TES3\",\n                    \"pocsItmName\": \"TES3\",\n                    \"pocsJobName\": null,\n                    \"pocsPhsName\": null,\n                    \"pocsCatName\": null,\n                    \"pocsLumpSumPoFlag\": null,\n                    \"pocsOrdQty\": 10,\n                    \"pocsOvrdExptdPriceFlag\": \"N\",\n                    \"pocsPoItemType\": \"F\",\n                    \"pocsPoOrdQty\": 31,\n                    \"pocsPoOrderedQty\": 31,\n                    \"pocsPoPriceAmt\": 1,\n                    \"pocsPobldLineNum\": null,\n                    \"pocsRecIntoInvFlag\": \"N\",\n                    \"pocsSuggestedPrice\": null,\n                    \"pocsTax1Code\": null,\n                    \"pocsTax1TaxableFlag\": \"Y\",\n                    \"pocsTax2Code\": null,\n                    \"pocsTax2TaxableFlag\": \"Y\",\n                    \"pocsTax3Code\": null,\n                    \"pocsTax3TaxableFlag\": \"Y\",\n                    \"pocsTaxAmt\": 0,\n                    \"pocsTotAmt\": 10,\n                    \"pocsUserField1\": \"ZZ\",\n                    \"pocsUserField2\": \"00\",\n                    \"pocsUserField3\": \"1000.100\",\n                    \"pocsUserField4\": null,\n                    \"pocsUserField5\": null,\n                    \"pocsUserField6\": null,\n                    \"pocsUserField7\": null,\n                    \"pocsUserField8\": null,\n                    \"pocsUserTypeCode\": \"G\",\n                    \"pocsWmCode\": \"EA\",\n                    \"pocsTavCode1\": null,\n                    \"pocsTavCode2\": null,\n                    \"pocsTavCode3\": null,\n                    \"pocsTavCode4\": null,\n                    \"pocsWbsvCode1\": null,\n                    \"pocsWbsvCode2\": null,\n                    \"pocsWbsvCode3\": null,\n                    \"pocsWbsvCode4\": null,\n                    \"pocsWbsvCode5\": null,\n                    \"pocsWbsvCode6\": null,\n                    \"pocsWbsvCode7\": null,\n                    \"pocsWbsvCode8\": null,\n                    \"pocsWbsvCode9\": null,\n                    \"pocsWbsvCode10\": null,\n                    \"pocsWbsvCode11\": null,\n                    \"pocsWbsvCode12\": null,\n                    \"pocsIuCreateDate\": \"2026-08-19T22:07:27-04:00\",\n                    \"pocsIuUpdateDate\": \"2026-08-19T22:07:38-04:00\"\n                },\n                {\n                    \"pocsVUuid\": \"5971E195ED722529E0630B811DACA533\",\n                    \"pocsCompCode\": \"ZZ\",\n                    \"pocsPoNum\": \"987893\",\n                    \"pocsNum\": \"3\",\n                    \"pocsReleaseNum\": 1,\n                    \"pocsLineNum\": 2,\n                    \"pocsCiitemtypCode\": null,\n                    \"pocsClassCode\": null,\n                    \"pocsDesc\": null,\n                    \"pocsDiscountPct\": 0,\n                    \"pocsExptdPriceAmt\": 1,\n                    \"pocsExtdAmt\": 0,\n                    \"pocsItemLocCode\": null,\n                    \"pocsItmCode\": \"CZXCSDC\",\n                    \"pocsItmName\": \"FDVDFFD\",\n                    \"pocsJobName\": null,\n                    \"pocsPhsName\": null,\n                    \"pocsCatName\": null,\n                    \"pocsLumpSumPoFlag\": null,\n                    \"pocsOrdQty\": 0,\n                    \"pocsOvrdExptdPriceFlag\": null,\n                    \"pocsPoItemType\": \"F\",\n                    \"pocsPoOrdQty\": 1,\n                    \"pocsPoOrderedQty\": 1,\n                    \"pocsPoPriceAmt\": 1,\n                    \"pocsPobldLineNum\": null,\n                    \"pocsRecIntoInvFlag\": \"N\",\n                    \"pocsSuggestedPrice\": null,\n                    \"pocsTax1Code\": \"GT\",\n                    \"pocsTax1TaxableFlag\": \"Y\",\n                    \"pocsTax2Code\": null,\n                    \"pocsTax2TaxableFlag\": \"Y\",\n                    \"pocsTax3Code\": null,\n                    \"pocsTax3TaxableFlag\": \"Y\",\n                    \"pocsTaxAmt\": 0,\n                    \"pocsTotAmt\": 0,\n                    \"pocsUserField1\": \"ZZ\",\n                    \"pocsUserField2\": \"00\",\n                    \"pocsUserField3\": \"1000.100\",\n                    \"pocsUserField4\": null,\n                    \"pocsUserField5\": null,\n                    \"pocsUserField6\": null,\n                    \"pocsUserField7\": null,\n                    \"pocsUserField8\": null,\n                    \"pocsUserTypeCode\": \"G\",\n                    \"pocsWmCode\": \"EA\",\n                    \"pocsTavCode1\": null,\n                    \"pocsTavCode2\": null,\n                    \"pocsTavCode3\": null,\n                    \"pocsTavCode4\": null,\n                    \"pocsWbsvCode1\": null,\n                    \"pocsWbsvCode2\": null,\n                    \"pocsWbsvCode3\": null,\n                    \"pocsWbsvCode4\": null,\n                    \"pocsWbsvCode5\": null,\n                    \"pocsWbsvCode6\": null,\n                    \"pocsWbsvCode7\": null,\n                    \"pocsWbsvCode8\": null,\n                    \"pocsWbsvCode9\": null,\n                    \"pocsWbsvCode10\": null,\n                    \"pocsWbsvCode11\": null,\n                    \"pocsWbsvCode12\": null,\n                    \"pocsIuCreateDate\": \"2026-08-19T22:07:27-04:00\",\n                    \"pocsIuUpdateDate\": null\n                }\n            ]\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5971E195ED682529E0630B811DACA533\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"987893\",\n                \"pocohNum\": \"2\",\n                \"pocohBchNum\": 226653,\n                \"pocohVenCode\": \"ZZ-ACME\",\n                \"pocohVenName\": \"ZZ-Acme & Supply\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2026-08-19\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"O\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": 0,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": null,\n                \"pocohAddCode\": null,\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": 0,\n                \"pocohUnadjPrice\": 0,\n                \"pocohCurrConvNum\": 1,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": null,\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": null,\n                \"pocohWipDeptName\": null,\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": null,\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": \"ZZ\",\n                \"pocohJobCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": \"2026-08-19\",\n                \"pocohPoTotal\": 32.05,\n                \"pocohIuCreateDate\": \"2026-08-19T22:00:16-04:00\",\n                \"pocohIuCreateUser\": \"YASHB\",\n                \"pocohIuUpdateDate\": \"2026-08-19T22:06:39-04:00\",\n                \"pocohIuUpdateUser\": \"YASHB\",\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": null\n            },\n            \"lines\": [\n                {\n                    \"pocsVUuid\": \"5971E195ED692529E0630B811DACA533\",\n                    \"pocsCompCode\": \"ZZ\",\n                    \"pocsPoNum\": \"987893\",\n                    \"pocsNum\": \"2\",\n                    \"pocsReleaseNum\": 1,\n                    \"pocsLineNum\": 1,\n                    \"pocsCiitemtypCode\": null,\n                    \"pocsClassCode\": null,\n                    \"pocsDesc\": null,\n                    \"pocsDiscountPct\": 0,\n                    \"pocsExptdPriceAmt\": 1,\n                    \"pocsExtdAmt\": 10,\n                    \"pocsItemLocCode\": null,\n                    \"pocsItmCode\": \"TES3\",\n                    \"pocsItmName\": \"TES3\",\n                    \"pocsJobName\": null,\n                    \"pocsPhsName\": null,\n                    \"pocsCatName\": null,\n                    \"pocsLumpSumPoFlag\": null,\n                    \"pocsOrdQty\": 10,\n                    \"pocsOvrdExptdPriceFlag\": \"N\",\n                    \"pocsPoItemType\": \"F\",\n                    \"pocsPoOrdQty\": 31,\n                    \"pocsPoOrderedQty\": 31,\n                    \"pocsPoPriceAmt\": 1,\n                    \"pocsPobldLineNum\": null,\n                    \"pocsRecIntoInvFlag\": \"N\",\n                    \"pocsSuggestedPrice\": null,\n                    \"pocsTax1Code\": null,\n                    \"pocsTax1TaxableFlag\": \"Y\",\n                    \"pocsTax2Code\": null,\n                    \"pocsTax2TaxableFlag\": \"Y\",\n                    \"pocsTax3Code\": null,\n                    \"pocsTax3TaxableFlag\": \"Y\",\n                    \"pocsTaxAmt\": 0,\n                    \"pocsTotAmt\": 10,\n                    \"pocsUserField1\": \"ZZ\",\n                    \"pocsUserField2\": \"00\",\n                    \"pocsUserField3\": \"1000.100\",\n                    \"pocsUserField4\": null,\n                    \"pocsUserField5\": null,\n                    \"pocsUserField6\": null,\n                    \"pocsUserField7\": null,\n                    \"pocsUserField8\": null,\n                    \"pocsUserTypeCode\": \"G\",\n                    \"pocsWmCode\": \"EA\",\n                    \"pocsTavCode1\": null,\n                    \"pocsTavCode2\": null,\n                    \"pocsTavCode3\": null,\n                    \"pocsTavCode4\": null,\n                    \"pocsWbsvCode1\": null,\n                    \"pocsWbsvCode2\": null,\n                    \"pocsWbsvCode3\": null,\n                    \"pocsWbsvCode4\": null,\n                    \"pocsWbsvCode5\": null,\n                    \"pocsWbsvCode6\": null,\n                    \"pocsWbsvCode7\": null,\n                    \"pocsWbsvCode8\": null,\n                    \"pocsWbsvCode9\": null,\n                    \"pocsWbsvCode10\": null,\n                    \"pocsWbsvCode11\": null,\n                    \"pocsWbsvCode12\": null,\n                    \"pocsIuCreateDate\": \"2026-08-19T22:00:16-04:00\",\n                    \"pocsIuUpdateDate\": \"2026-08-19T22:00:47-04:00\"\n                },\n                {\n                    \"pocsVUuid\": \"5971E195ED6B2529E0630B811DACA533\",\n                    \"pocsCompCode\": \"ZZ\",\n                    \"pocsPoNum\": \"987893\",\n                    \"pocsNum\": \"2\",\n                    \"pocsReleaseNum\": 1,\n                    \"pocsLineNum\": 2,\n                    \"pocsCiitemtypCode\": null,\n                    \"pocsClassCode\": null,\n                    \"pocsDesc\": null,\n                    \"pocsDiscountPct\": 0,\n                    \"pocsExptdPriceAmt\": 1,\n                    \"pocsExtdAmt\": 0,\n                    \"pocsItemLocCode\": null,\n                    \"pocsItmCode\": \"CZXCSDC\",\n                    \"pocsItmName\": \"FDVDFFD\",\n                    \"pocsJobName\": null,\n                    \"pocsPhsName\": null,\n                    \"pocsCatName\": null,\n                    \"pocsLumpSumPoFlag\": null,\n                    \"pocsOrdQty\": 0,\n                    \"pocsOvrdExptdPriceFlag\": null,\n                    \"pocsPoItemType\": \"F\",\n                    \"pocsPoOrdQty\": 1,\n                    \"pocsPoOrderedQty\": 1,\n                    \"pocsPoPriceAmt\": 1,\n                    \"pocsPobldLineNum\": null,\n                    \"pocsRecIntoInvFlag\": \"N\",\n                    \"pocsSuggestedPrice\": null,\n                    \"pocsTax1Code\": \"GT\",\n                    \"pocsTax1TaxableFlag\": \"Y\",\n                    \"pocsTax2Code\": null,\n                    \"pocsTax2TaxableFlag\": \"Y\",\n                    \"pocsTax3Code\": null,\n                    \"pocsTax3TaxableFlag\": \"Y\",\n                    \"pocsTaxAmt\": 0,\n                    \"pocsTotAmt\": 0,\n                    \"pocsUserField1\": \"ZZ\",\n                    \"pocsUserField2\": \"00\",\n                    \"pocsUserField3\": \"1000.100\",\n                    \"pocsUserField4\": null,\n                    \"pocsUserField5\": null,\n                    \"pocsUserField6\": null,\n                    \"pocsUserField7\": null,\n                    \"pocsUserField8\": null,\n                    \"pocsUserTypeCode\": \"G\",\n                    \"pocsWmCode\": \"EA\",\n                    \"pocsTavCode1\": null,\n                    \"pocsTavCode2\": null,\n                    \"pocsTavCode3\": null,\n                    \"pocsTavCode4\": null,\n                    \"pocsWbsvCode1\": null,\n                    \"pocsWbsvCode2\": null,\n                    \"pocsWbsvCode3\": null,\n                    \"pocsWbsvCode4\": null,\n                    \"pocsWbsvCode5\": null,\n                    \"pocsWbsvCode6\": null,\n                    \"pocsWbsvCode7\": null,\n                    \"pocsWbsvCode8\": null,\n                    \"pocsWbsvCode9\": null,\n                    \"pocsWbsvCode10\": null,\n                    \"pocsWbsvCode11\": null,\n                    \"pocsWbsvCode12\": null,\n                    \"pocsIuCreateDate\": \"2026-08-19T22:00:16-04:00\",\n                    \"pocsIuUpdateDate\": null\n                }\n            ]\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"5971C0ED210B2487E0630B811DACA28C\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"00-DUPL032\",\n                \"pocohNum\": \"2\",\n                \"pocohBchNum\": null,\n                \"pocohVenCode\": \"01\",\n                \"pocohVenName\": \"lpa01\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": null,\n                \"pocohOrdDate\": \"2022-03-01\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"R\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"TESTCO\",\n                \"pocohTermName\": \"Test Code for Retainage\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": \"ZJ\",\n                \"pocohBuyCode\": \"DA\",\n                \"pocohAddCode\": \"ZSCH\",\n                \"pocohShplneCode\": \"CNR\",\n                \"pocohShpmetCode\": \"AIR\",\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": null,\n                \"pocohWipDeptName\": null,\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": \"A\",\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": \"ZZ\",\n                \"pocohJobCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohJobCode\": \"00-DUPLIC1\",\n                \"pocohJobName\": \"TEST\",\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"A\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 26.15,\n                \"pocohIuCreateDate\": \"2026-08-19T21:51:16-04:00\",\n                \"pocohIuCreateUser\": \"YASHB\",\n                \"pocohIuUpdateDate\": \"2026-08-26T22:21:12-04:00\",\n                \"pocohIuUpdateUser\": \"YASHB\",\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": \"ZZ - Schaumburg 102831 North Mall Road TEST SUITE    \"\n            },\n            \"lines\": [\n                {\n                    \"pocsVUuid\": \"5971C0ED210E2487E0630B811DACA28C\",\n                    \"pocsCompCode\": \"ZZ\",\n                    \"pocsPoNum\": \"00-DUPL032\",\n                    \"pocsNum\": \"2\",\n                    \"pocsReleaseNum\": 1,\n                    \"pocsLineNum\": 2,\n                    \"pocsCiitemtypCode\": \"1\",\n                    \"pocsClassCode\": \"FUEL\",\n                    \"pocsDesc\": null,\n                    \"pocsDiscountPct\": 0,\n                    \"pocsExptdPriceAmt\": 12.5,\n                    \"pocsExtdAmt\": 0,\n                    \"pocsItemLocCode\": \"MAIN\",\n                    \"pocsItmCode\": \"1106\",\n                    \"pocsItmName\": \"1106\",\n                    \"pocsJobName\": null,\n                    \"pocsPhsName\": null,\n                    \"pocsCatName\": null,\n                    \"pocsLumpSumPoFlag\": null,\n                    \"pocsOrdQty\": 0,\n                    \"pocsOvrdExptdPriceFlag\": null,\n                    \"pocsPoItemType\": \"I\",\n                    \"pocsPoOrdQty\": 2,\n                    \"pocsPoOrderedQty\": 2,\n                    \"pocsPoPriceAmt\": 12.5,\n                    \"pocsPobldLineNum\": null,\n                    \"pocsRecIntoInvFlag\": \"N\",\n                    \"pocsSuggestedPrice\": 12.5,\n                    \"pocsTax1Code\": null,\n                    \"pocsTax1TaxableFlag\": \"Y\",\n                    \"pocsTax2Code\": null,\n                    \"pocsTax2TaxableFlag\": \"Y\",\n                    \"pocsTax3Code\": null,\n                    \"pocsTax3TaxableFlag\": \"Y\",\n                    \"pocsTaxAmt\": 0,\n                    \"pocsTotAmt\": 0,\n                    \"pocsUserField1\": \"ZZ\",\n                    \"pocsUserField2\": \"00\",\n                    \"pocsUserField3\": \"1000.100\",\n                    \"pocsUserField4\": null,\n                    \"pocsUserField5\": null,\n                    \"pocsUserField6\": null,\n                    \"pocsUserField7\": null,\n                    \"pocsUserField8\": null,\n                    \"pocsUserTypeCode\": \"G\",\n                    \"pocsWmCode\": \"CA\",\n                    \"pocsTavCode1\": null,\n                    \"pocsTavCode2\": null,\n                    \"pocsTavCode3\": null,\n                    \"pocsTavCode4\": null,\n                    \"pocsWbsvCode1\": null,\n                    \"pocsWbsvCode2\": null,\n                    \"pocsWbsvCode3\": null,\n                    \"pocsWbsvCode4\": null,\n                    \"pocsWbsvCode5\": null,\n                    \"pocsWbsvCode6\": null,\n                    \"pocsWbsvCode7\": null,\n                    \"pocsWbsvCode8\": null,\n                    \"pocsWbsvCode9\": null,\n                    \"pocsWbsvCode10\": null,\n                    \"pocsWbsvCode11\": null,\n                    \"pocsWbsvCode12\": null,\n                    \"pocsIuCreateDate\": \"2026-08-19T21:51:17-04:00\",\n                    \"pocsIuUpdateDate\": null\n                },\n                {\n                    \"pocsVUuid\": \"5971C0ED210C2487E0630B811DACA28C\",\n                    \"pocsCompCode\": \"ZZ\",\n                    \"pocsPoNum\": \"00-DUPL032\",\n                    \"pocsNum\": \"2\",\n                    \"pocsReleaseNum\": 1,\n                    \"pocsLineNum\": 1,\n                    \"pocsCiitemtypCode\": null,\n                    \"pocsClassCode\": null,\n                    \"pocsDesc\": null,\n                    \"pocsDiscountPct\": 0,\n                    \"pocsExptdPriceAmt\": 1,\n                    \"pocsExtdAmt\": 0,\n                    \"pocsItemLocCode\": null,\n                    \"pocsItmCode\": \"TEST\",\n                    \"pocsItmName\": \"TEST\",\n                    \"pocsJobName\": \"TEST\",\n                    \"pocsPhsName\": \"test\",\n                    \"pocsCatName\": \"SDI Cat\",\n                    \"pocsLumpSumPoFlag\": null,\n                    \"pocsOrdQty\": 0,\n                    \"pocsOvrdExptdPriceFlag\": null,\n                    \"pocsPoItemType\": \"F\",\n                    \"pocsPoOrdQty\": 1,\n                    \"pocsPoOrderedQty\": 1,\n                    \"pocsPoPriceAmt\": 1,\n                    \"pocsPobldLineNum\": null,\n                    \"pocsRecIntoInvFlag\": \"N\",\n                    \"pocsSuggestedPrice\": null,\n                    \"pocsTax1Code\": \"09\",\n                    \"pocsTax1TaxableFlag\": \"Y\",\n                    \"pocsTax2Code\": null,\n                    \"pocsTax2TaxableFlag\": \"Y\",\n                    \"pocsTax3Code\": null,\n                    \"pocsTax3TaxableFlag\": \"Y\",\n                    \"pocsTaxAmt\": 0,\n                    \"pocsTotAmt\": 0,\n                    \"pocsUserField1\": \"ZZ\",\n                    \"pocsUserField2\": \"00-DUPLIC1\",\n                    \"pocsUserField3\": \"  gb2\",\n                    \"pocsUserField4\": \"0001\",\n                    \"pocsUserField5\": null,\n                    \"pocsUserField6\": null,\n                    \"pocsUserField7\": null,\n                    \"pocsUserField8\": null,\n                    \"pocsUserTypeCode\": \"J\",\n                    \"pocsWmCode\": \"LS\",\n                    \"pocsTavCode1\": null,\n                    \"pocsTavCode2\": null,\n                    \"pocsTavCode3\": null,\n                    \"pocsTavCode4\": null,\n                    \"pocsWbsvCode1\": null,\n                    \"pocsWbsvCode2\": null,\n                    \"pocsWbsvCode3\": null,\n                    \"pocsWbsvCode4\": null,\n                    \"pocsWbsvCode5\": null,\n                    \"pocsWbsvCode6\": null,\n                    \"pocsWbsvCode7\": null,\n                    \"pocsWbsvCode8\": null,\n                    \"pocsWbsvCode9\": null,\n                    \"pocsWbsvCode10\": null,\n                    \"pocsWbsvCode11\": null,\n                    \"pocsWbsvCode12\": null,\n                    \"pocsIuCreateDate\": \"2026-08-19T21:51:17-04:00\",\n                    \"pocsIuUpdateDate\": null\n                }\n            ]\n        },\n        {\n            \"header\": {\n                \"pocohVUuid\": \"596EF33010B64F19E0630B811DACF02D\",\n                \"pocohCompCode\": \"ZZ\",\n                \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPoNum\": \"TEST05121\",\n                \"pocohNum\": \"1\",\n                \"pocohBchNum\": null,\n                \"pocohVenCode\": \"ZZ-ACME\",\n                \"pocohVenName\": \"ZZ-Acme & Supply\",\n                \"pocohDeptCode\": null,\n                \"pocohDeptName\": null,\n                \"pocohExptdDate\": \"2019-09-10T12:45:04-04:00\",\n                \"pocohOrdDate\": \"2019-05-13T15:48:28-04:00\",\n                \"pocohRecDate\": null,\n                \"pocohTypeCode\": \"S\",\n                \"pocohAdjCode\": null,\n                \"pocohStatCode\": \"N\",\n                \"pocohChgCode\": \"O\",\n                \"pocohTermCode\": \"NET30\",\n                \"pocohTermName\": \"Net 30\",\n                \"pocohInvCode\": null,\n                \"pocohInvDate\": null,\n                \"pocohInvDueDate\": null,\n                \"pocohInvDiscDate\": null,\n                \"pocohInvDiscAmt\": null,\n                \"pocohCurrCode\": \"US\",\n                \"pocohCurrName\": \"US Dollars\",\n                \"pocohFobCode\": null,\n                \"pocohBuyCode\": \"DA\",\n                \"pocohAddCode\": null,\n                \"pocohShplneCode\": null,\n                \"pocohShpmetCode\": null,\n                \"pocohTxt1Code\": null,\n                \"pocohTxt2Code\": null,\n                \"pocohShpinstDesc\": null,\n                \"pocohDesc1\": null,\n                \"pocohDesc2\": null,\n                \"pocohAdjPrice\": null,\n                \"pocohUnadjPrice\": null,\n                \"pocohCurrConvNum\": 1,\n                \"pocohCostedCode\": null,\n                \"pocohRefNum\": null,\n                \"pocohRefDate\": null,\n                \"pocohReqCode\": \"DA\",\n                \"pocohRecCode\": null,\n                \"pocohReprintDate\": null,\n                \"pocohWipAccCode\": null,\n                \"pocohWipAccName\": null,\n                \"pocohWipDeptCode\": null,\n                \"pocohWipDeptName\": null,\n                \"pocohShipinstTxt1Code\": null,\n                \"pocohShipinstTxt2Code\": null,\n                \"pocohShipinstTxt3Code\": null,\n                \"pocohShipinstTxt4Code\": null,\n                \"pocohShipinstTxt5Code\": null,\n                \"pocohReleaseNum\": 1,\n                \"pocohBilltoAddCode\": null,\n                \"pocohReqReason\": null,\n                \"pocohInvTypeCode\": null,\n                \"pocohImageFilename\": null,\n                \"pocohInvSerCode\": null,\n                \"pocohVendOrderAddCode\": null,\n                \"pocohComplianceFlag\": \"N\",\n                \"pocohJobCompCode\": \"ZZ\",\n                \"pocohJobCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohJobCode\": null,\n                \"pocohJobName\": null,\n                \"pocohContactCode\": null,\n                \"pocohAddCompCode\": \"ZZ\",\n                \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n                \"pocohPrintDate\": null,\n                \"pocohDefaultRecCode\": \"M\",\n                \"pocohDate\": null,\n                \"pocohPoTotal\": 50,\n                \"pocohIuCreateDate\": \"2026-08-19T19:49:03-04:00\",\n                \"pocohIuCreateUser\": \"YASHB\",\n                \"pocohIuUpdateDate\": \"2026-08-19T19:56:45-04:00\",\n                \"pocohIuUpdateUser\": \"YASHB\",\n                \"pocohAcctDescription\": null,\n                \"pocohDiscountPct\": 0,\n                \"pocohAddName\": null\n            },\n            \"lines\": [\n                {\n                    \"pocsVUuid\": \"596EF33010B74F19E0630B811DACF02D\",\n                    \"pocsCompCode\": \"ZZ\",\n                    \"pocsPoNum\": \"TEST05121\",\n                    \"pocsNum\": \"1\",\n                    \"pocsReleaseNum\": 1,\n                    \"pocsLineNum\": 1,\n                    \"pocsCiitemtypCode\": null,\n                    \"pocsClassCode\": null,\n                    \"pocsDesc\": null,\n                    \"pocsDiscountPct\": 0,\n                    \"pocsExptdPriceAmt\": 50,\n                    \"pocsExtdAmt\": 500,\n                    \"pocsItemLocCode\": null,\n                    \"pocsItmCode\": \"WA\",\n                    \"pocsItmName\": \"Test  A\",\n                    \"pocsJobName\": null,\n                    \"pocsPhsName\": null,\n                    \"pocsCatName\": null,\n                    \"pocsLumpSumPoFlag\": null,\n                    \"pocsOrdQty\": 10,\n                    \"pocsOvrdExptdPriceFlag\": \"N\",\n                    \"pocsPoItemType\": \"N\",\n                    \"pocsPoOrdQty\": 1,\n                    \"pocsPoOrderedQty\": 1,\n                    \"pocsPoPriceAmt\": 50,\n                    \"pocsPobldLineNum\": null,\n                    \"pocsRecIntoInvFlag\": \"N\",\n                    \"pocsSuggestedPrice\": null,\n                    \"pocsTax1Code\": null,\n                    \"pocsTax1TaxableFlag\": \"Y\",\n                    \"pocsTax2Code\": null,\n                    \"pocsTax2TaxableFlag\": \"Y\",\n                    \"pocsTax3Code\": null,\n                    \"pocsTax3TaxableFlag\": \"Y\",\n                    \"pocsTaxAmt\": 0,\n                    \"pocsTotAmt\": 500,\n                    \"pocsUserField1\": \"ZZ\",\n                    \"pocsUserField2\": null,\n                    \"pocsUserField3\": null,\n                    \"pocsUserField4\": null,\n                    \"pocsUserField5\": null,\n                    \"pocsUserField6\": null,\n                    \"pocsUserField7\": null,\n                    \"pocsUserField8\": null,\n                    \"pocsUserTypeCode\": \"M\",\n                    \"pocsWmCode\": \"EA\",\n                    \"pocsTavCode1\": null,\n                    \"pocsTavCode2\": null,\n                    \"pocsTavCode3\": null,\n                    \"pocsTavCode4\": null,\n                    \"pocsWbsvCode1\": null,\n                    \"pocsWbsvCode2\": null,\n                    \"pocsWbsvCode3\": null,\n                    \"pocsWbsvCode4\": null,\n                    \"pocsWbsvCode5\": null,\n                    \"pocsWbsvCode6\": null,\n                    \"pocsWbsvCode7\": null,\n                    \"pocsWbsvCode8\": null,\n                    \"pocsWbsvCode9\": null,\n                    \"pocsWbsvCode10\": null,\n                    \"pocsWbsvCode11\": null,\n                    \"pocsWbsvCode12\": null,\n                    \"pocsIuCreateDate\": \"2026-08-19T19:49:03-04:00\",\n                    \"pocsIuUpdateDate\": \"2026-08-19T19:56:46-04:00\"\n                }\n            ]\n        }\n    ],\n    \"limit\": 25,\n    \"offset\": 0,\n    \"hasMore\": true,\n    \"count\": 25\n}"
string