Get Po Change Order By Vuuid

Prev Next
Get
/po-rest-api/jersey/v1/po-change-order/596EF33010A84F19E0630B811DACF02D

PO Change Order — Get by UUID (Header + Lines)

Overview

Retrieves a single change order by its unique identifier, returning the change order header
together with all of its associated summary lines in one response.

Notes

  • Up to MAX_CHILD_LINES (1000) summary lines are returned per header; there is no pagination
    on the lines array for this operation.

  • If no change order matches the supplied vuuid, a 404 is returned — the endpoint never
    returns an empty header object.

UI Navigation

Asset Management → Purchase Order → Change Orders → Enter Change Order

Finders

Not applicable — this operation looks up a single record by POCOH_V_UUID and does not use a
named finder.

HTTP Method & Endpoint

GET {base_url}/po-rest-api/jersey/v1/po-change-order/{vuuid}

Path Parameters

Field Type Required Default Description
vuuid String True — POCOH_V_UUID of the change order header to retrieve

Query Parameters

None.

Example Request

curl -X GET "{base_url}/po-rest-api/jersey/v1/po-change-order/57583E9AF08A542CE0630B811DACCB66" \
  -H "Authorization: Basic {credentials}"

Example Response (200 OK)

{
  "header": {
    "pocohVUuid": "57583E9AF08A542CE0630B811DACCB66",
    "pocohCompCode": "ALT",
    "pocohPoNum": "PO000004",
    "pocohNum": "1",
    "pocohReleaseNum": 1,
    "pocohStatCode": "O",
    "pocohVenCode": "V0001"
  },
  "lines": [
    {
      "pocsVUuid": "57583E9AF08B542CE0630B811DACCB66",
      "pocsCompCode": "ALT",
      "pocsPoNum": "PO000004",
      "pocsNum": "1",
      "pocsReleaseNum": 1,
      "pocsLineNum": 1,
      "pocsItmCode": "PAPER-A4",
      "pocsOrdQty": 100.0,
      "pocsExtdAmt": 1250.0
    }
  ]
}

Attributes

Header (header object)

Name Object Description Type Data Length Example Mandatory
pocohVUuid header Virtual UUID, unique row identifier String 64 57583E9AF08A542CE0630B811DACCB66 System Generated
pocohCompCode header Company code String 8 ALT Key
pocohCompName header Company name (lookup) String 30 ALT Company System Generated
pocohPoNum header Parent Purchase Order number String 11 PO000004 Key
pocohNum header Change order number String 11 1 Key
pocohBchNum header Posting batch number Number(11) 11 42 System Assigned
pocohVenCode header Vendor code String 8 V0001 False
pocohVenName header Vendor name (lookup) String 50 ACME Supplies System Generated
pocohDeptCode header Department code String 6 ADMIN False
pocohDeptName header Department name (lookup) String 30 Administration System Generated
pocohExptdDate header Expected date Date — 2026-09-01 False
pocohOrdDate header Order date Date — 2026-08-20 False
pocohRecDate header Receipt date Date — 2026-09-05 False
pocohTypeCode header Change order type code String 1 S False
pocohAdjCode header Adjustment code String 1 A False
pocohStatCode header Status code String 1 O System Assigned
pocohChgCode header Change code String 1 C False
pocohTermCode header Payment terms code String 6 NET30 False
pocohTermName header Payment terms name (lookup) String 30 Net 30 Days System Generated
pocohInvCode header Invoice code String 20 INV001 False
pocohInvDate header Invoice date Date — 2026-09-10 False
pocohInvDueDate header Invoice due date Date — 2026-10-10 False
pocohInvDiscDate header Invoice discount date Date — 2026-09-20 False
pocohInvDiscAmt header Invoice discount amount Number(18,2) 18,2 25.00 False
pocohCurrCode header Currency code String 3 USD False
pocohCurrName header Currency name (lookup) String 30 US Dollar System Generated
pocohFobCode header FOB code String 2 FO False
pocohBuyCode header Buyer code String 30 BUYER01 False
pocohAddCode header Ship-to address code String 8 ADDR01 False
pocohShplneCode header Shipping line code String 3 UPS False
pocohShpmetCode header Shipping method code String 5 GRND False
pocohTxt1Code header Text code 1 String 8 TXT01 False
pocohTxt2Code header Text code 2 String 8 TXT02 False
pocohShpinstDesc header Shipping instructions String 2000 Deliver to loading dock False
pocohDesc1 header Description line 1 String 2000 Revised material order False
pocohDesc2 header Description line 2 String 2000 Adds 2 items False
pocohAdjPrice header Adjusted price total Number(18,4) 18,4 1250.0000 False
pocohUnadjPrice header Unadjusted price total Number(18,4) 18,4 1200.0000 False
pocohCurrConvNum header Currency conversion rate Number(16,8) 16,8 1.00000000 False
pocohCostedCode header Costed flag String 1 Y False
pocohRefNum header Reference number String 11 REF001 False
pocohRefDate header Reference date Date — 2026-08-15 False
pocohReqCode header Requisition code String 30 RQ000003 False
pocohRecCode header Receiving code String 30 REC001 False
pocohReprintDate header Reprint date Date — 2026-08-22 False
pocohWipAccCode header WIP account code String 16 WIP-01 False
pocohWipAccName header WIP account name (lookup) String 30 Work In Progress 01 System Generated
pocohWipDeptCode header WIP department code String 6 WIPD01 False
pocohWipDeptName header WIP department name (lookup) String 30 WIP Department 01 System Generated
pocohShipinstTxt1Code..5Code header Shipping instruction text codes 1-5 String 8 each TXT01 False
pocohReleaseNum header PO release number this change order belongs to Number(11) 11 1 Key
pocohBilltoAddCode header Bill-to address code String 8 BILL01 False
pocohReqReason header Requisition reason String 255 Scope change False
pocohInvTypeCode header Invoice type code String 1 S False
pocohImageFilename header Attached image filename String 255 co_scan.pdf False
pocohInvSerCode header Invoice series code String 4 2026 False
pocohVendOrderAddCode header Vendor order address code String 5 VOA01 False
pocohComplianceFlag header Compliance flag (Y/N) String 1 Y False
pocohJobCompCode header Job company code String 8 ALT False
pocohJobCompName header Job company name (lookup) String 30 ALT Company System Generated
pocohJobCode header Job code String 10 JOB001 False
pocohJobName header Job name (lookup) String 60 Office Renovation System Generated
pocohContactCode header Contact code String 10 CONT01 False
pocohAddCompCode header Ship-to address company code String 8 ALT False
pocohAddCompName header Ship-to address company name (lookup) String 30 ALT Company System Generated
pocohPrintDate header Print date Date — 2026-08-21 False
pocohDefaultRecCode header Default receiving code String 1 A False
pocohDate header Change order date Date — 2026-08-20 False
pocohPoTotal header Total PO amount (calculated) Number — 12500.00 System Generated
pocohIuCreateDate header Record creation timestamp (ISO-8601) Timestamp — 2026-08-20T10:15:00-04:00 System Generated
pocohIuCreateUser header User who created the record String 30 DA System Generated
pocohIuUpdateDate header Record last update timestamp (ISO-8601) Timestamp — 2026-08-21T09:00:00-04:00 System Generated
pocohIuUpdateUser header User who last updated the record String 30 DA System Generated
pocohAcctDescription header Account description (lookup) String 500 General WIP Account System Generated
pocohDiscountPct header Discount percentage Number(16,3) 16,3 2.500 False
pocohAddName header Ship-to address name (lookup) String 195 Main Warehouse System Generated

Lines (lines array items)

Name Object Description Type Data Length Example Mandatory
pocsVUuid line Virtual UUID, unique row identifier String 64 57583E9AF08B542CE0630B811DACCB66 System Generated
pocsCompCode line Company code String 8 ALT Key
pocsPoNum line Parent PO number String 11 PO000004 Key
pocsNum line Change order number String 11 1 Key
pocsReleaseNum line Release number Number(11) 11 1 Key
pocsLineNum line Summary line number Number(6) 6 1 Key
pocsCiitemtypCode line item type code String 2 MA False
pocsClassCode line Item class code String 4 OFF1 False
pocsDesc line Line description String 4000 Revised paper order False
pocsDiscountPct line Discount percentage Number — 2.500 False
pocsExptdPriceAmt line Expected unit price Number — 12.5000 False
pocsExtdAmt line Extended amount (calculated) Number — 1250.00 System Generated
pocsItemLocCode line Item location code String 7 ILOC01 False
pocsItmCode line Item/product code String 16 PAPER-A4 False
pocsItmName line Item/product name (lookup) String 4000 A4 Copy Paper System Generated
pocsJobName line Job name (lookup) String 60 Office Renovation System Generated
pocsPhsName line Phase name (lookup) String 50 Phase 1 System Generated
pocsCatName line Category name (lookup) String 30 Supplies System Generated
pocsLumpSumPoFlag line Lump-sum PO flag (Y/N, calculated) String 1 N System Generated
pocsOrdQty line Quantity ordered Number — 100.0000 False
pocsOvrdExptdPriceFlag line Override expected price flag (Y/N) String 1 Y False
pocsPoItemType line PO item type (I=Inventory, N=Non-stock, F=Free-form) String 1 N False
pocsPoOrdQty line PO ordered quantity (calculated) Number — 80.0000 System Generated
pocsPoOrderedQty line PO ordered quantity, alt calculation (calculated) Number — 80.0000 System Generated
pocsPoPriceAmt line PO price amount (calculated) Number — 12.5000 System Generated
pocsPobldLineNum line Source PO build line number (calculated) Number(6) 6 1 System Generated
pocsRecIntoInvFlag line Receive into inventory flag (Y/N) String 1 Y False
pocsSuggestedPrice line Suggested price (calculated) Number — 12.5000 System Generated
pocsTax1Code / Tax2Code / Tax3Code line Tax codes 1-3 String 11 each HST False
pocsTax1TaxableFlag / Tax2.../Tax3... line Taxable flags for tax 1-3 (Y/N) String 1 each Y False
pocsTaxAmt line Tax amount (calculated) Number — 150.00 System Generated
pocsTotAmt line Total amount (calculated) Number — 1400.00 System Generated
pocsUserField1..8 line User-defined fields 1-8 String 60 each — False
pocsUserTypeCode line User-defined type code String 3 STD False
pocsWmCode line Unit of measure code String 2 BX False
pocsTavCode1..4 line TAV codes 1-4 String 10 each TAV01 False
pocsWbsvCode1..8 line WBS value codes 1-8 (always disabled in CMiC UI) String 60 each — System Generated
pocsWbsvCode9..12 line WBS value codes 9-12 String 60 each — False
pocsIuCreateDate line Record creation timestamp (ISO-8601) Timestamp — 2026-08-20T10:15:00-04:00 System Generated
pocsIuUpdateDate line Record last update timestamp (ISO-8601) Timestamp — 2026-08-21T09:00:00-04:00 System Generated

Error Codes

HTTP Error Code Reason
400 PO-000259-ERR vuuid is required and cannot be blank
404 PO-000260-ERR No change order found for the supplied vuuid
500 (unhandled exception) Any other unexpected error is wrapped and returned by CmicJerseyRespondException(e)
Security
HTTP
Type basic

Basic authentication

Responses
200

OK

Headers
Content-Type
string
Exampleapplication/json
"{\n    \"header\": {\n        \"pocohVUuid\": \"596EF33010A84F19E0630B811DACF02D\",\n        \"pocohCompCode\": \"ZZ\",\n        \"pocohCompName\": \"CMiC-ZZ  Test Company Incorp\",\n        \"pocohPoNum\": \"987943\",\n        \"pocohNum\": \"2\",\n        \"pocohBchNum\": null,\n        \"pocohVenCode\": \"ZZ-ACME\",\n        \"pocohVenName\": \"ZZ-Acme & Supply\",\n        \"pocohDeptCode\": null,\n        \"pocohDeptName\": null,\n        \"pocohExptdDate\": null,\n        \"pocohOrdDate\": \"2021-01-28\",\n        \"pocohRecDate\": null,\n        \"pocohTypeCode\": \"S\",\n        \"pocohAdjCode\": null,\n        \"pocohStatCode\": \"N\",\n        \"pocohChgCode\": \"O\",\n        \"pocohTermCode\": \"NET30\",\n        \"pocohTermName\": \"Net 30\",\n        \"pocohInvCode\": null,\n        \"pocohInvDate\": null,\n        \"pocohInvDueDate\": null,\n        \"pocohInvDiscDate\": null,\n        \"pocohInvDiscAmt\": null,\n        \"pocohCurrCode\": \"US\",\n        \"pocohCurrName\": \"US Dollars\",\n        \"pocohFobCode\": null,\n        \"pocohBuyCode\": null,\n        \"pocohAddCode\": null,\n        \"pocohShplneCode\": null,\n        \"pocohShpmetCode\": null,\n        \"pocohTxt1Code\": null,\n        \"pocohTxt2Code\": null,\n        \"pocohShpinstDesc\": null,\n        \"pocohDesc1\": null,\n        \"pocohDesc2\": null,\n        \"pocohAdjPrice\": null,\n        \"pocohUnadjPrice\": null,\n        \"pocohCurrConvNum\": 1,\n        \"pocohCostedCode\": null,\n        \"pocohRefNum\": null,\n        \"pocohRefDate\": null,\n        \"pocohReqCode\": null,\n        \"pocohRecCode\": null,\n        \"pocohReprintDate\": null,\n        \"pocohWipAccCode\": null,\n        \"pocohWipAccName\": null,\n        \"pocohWipDeptCode\": null,\n        \"pocohWipDeptName\": null,\n        \"pocohShipinstTxt1Code\": null,\n        \"pocohShipinstTxt2Code\": null,\n        \"pocohShipinstTxt3Code\": null,\n        \"pocohShipinstTxt4Code\": null,\n        \"pocohShipinstTxt5Code\": null,\n        \"pocohReleaseNum\": 1,\n        \"pocohBilltoAddCode\": null,\n        \"pocohReqReason\": null,\n        \"pocohInvTypeCode\": null,\n        \"pocohImageFilename\": null,\n        \"pocohInvSerCode\": null,\n        \"pocohVendOrderAddCode\": null,\n        \"pocohComplianceFlag\": \"N\",\n        \"pocohJobCompCode\": \"ZZ\",\n        \"pocohJobCompName\": \"CMiC-ZZ  Test Company Incorp\",\n        \"pocohJobCode\": null,\n        \"pocohJobName\": null,\n        \"pocohContactCode\": null,\n        \"pocohAddCompCode\": \"ZZ\",\n        \"pocohAddCompName\": \"CMiC-ZZ  Test Company Incorp\",\n        \"pocohPrintDate\": null,\n        \"pocohDefaultRecCode\": \"A\",\n        \"pocohDate\": null,\n        \"pocohPoTotal\": 46,\n        \"pocohIuCreateDate\": \"2026-08-19T18:57:08-04:00\",\n        \"pocohIuCreateUser\": \"YASHB\",\n        \"pocohIuUpdateDate\": null,\n        \"pocohIuUpdateUser\": null,\n        \"pocohAcctDescription\": null,\n        \"pocohDiscountPct\": 0,\n        \"pocohAddName\": null\n    },\n    \"lines\": [\n        {\n            \"pocsVUuid\": \"596EF33010A94F19E0630B811DACF02D\",\n            \"pocsCompCode\": \"ZZ\",\n            \"pocsPoNum\": \"987943\",\n            \"pocsNum\": \"2\",\n            \"pocsReleaseNum\": 1,\n            \"pocsLineNum\": 1,\n            \"pocsCiitemtypCode\": null,\n            \"pocsClassCode\": null,\n            \"pocsDesc\": null,\n            \"pocsDiscountPct\": 0,\n            \"pocsExptdPriceAmt\": 2,\n            \"pocsExtdAmt\": 0,\n            \"pocsItemLocCode\": null,\n            \"pocsItmCode\": \"ITEM 77\",\n            \"pocsItmName\": \"77\",\n            \"pocsJobName\": null,\n            \"pocsPhsName\": null,\n            \"pocsCatName\": null,\n            \"pocsLumpSumPoFlag\": null,\n            \"pocsOrdQty\": 0,\n            \"pocsOvrdExptdPriceFlag\": null,\n            \"pocsPoItemType\": \"F\",\n            \"pocsPoOrdQty\": 23,\n            \"pocsPoOrderedQty\": 23,\n            \"pocsPoPriceAmt\": 2,\n            \"pocsPobldLineNum\": null,\n            \"pocsRecIntoInvFlag\": \"N\",\n            \"pocsSuggestedPrice\": null,\n            \"pocsTax1Code\": null,\n            \"pocsTax1TaxableFlag\": \"Y\",\n            \"pocsTax2Code\": null,\n            \"pocsTax2TaxableFlag\": \"Y\",\n            \"pocsTax3Code\": null,\n            \"pocsTax3TaxableFlag\": \"Y\",\n            \"pocsTaxAmt\": 0,\n            \"pocsTotAmt\": 0,\n            \"pocsUserField1\": \"ZZ\",\n            \"pocsUserField2\": \"00\",\n            \"pocsUserField3\": \"1000.100\",\n            \"pocsUserField4\": null,\n            \"pocsUserField5\": null,\n            \"pocsUserField6\": null,\n            \"pocsUserField7\": null,\n            \"pocsUserField8\": null,\n            \"pocsUserTypeCode\": \"G\",\n            \"pocsWmCode\": \"EA\",\n            \"pocsTavCode1\": null,\n            \"pocsTavCode2\": null,\n            \"pocsTavCode3\": null,\n            \"pocsTavCode4\": null,\n            \"pocsWbsvCode1\": null,\n            \"pocsWbsvCode2\": null,\n            \"pocsWbsvCode3\": null,\n            \"pocsWbsvCode4\": null,\n            \"pocsWbsvCode5\": null,\n            \"pocsWbsvCode6\": null,\n            \"pocsWbsvCode7\": null,\n            \"pocsWbsvCode8\": null,\n            \"pocsWbsvCode9\": null,\n            \"pocsWbsvCode10\": null,\n            \"pocsWbsvCode11\": null,\n            \"pocsWbsvCode12\": null,\n            \"pocsIuCreateDate\": \"2026-08-19T18:57:08-04:00\",\n            \"pocsIuUpdateDate\": null\n        },\n        {\n            \"pocsVUuid\": \"596EF33010AF4F19E0630B811DACF02D\",\n            \"pocsCompCode\": \"ZZ\",\n            \"pocsPoNum\": \"987943\",\n            \"pocsNum\": \"2\",\n            \"pocsReleaseNum\": 1,\n            \"pocsLineNum\": 2,\n            \"pocsCiitemtypCode\": null,\n            \"pocsClassCode\": null,\n            \"pocsDesc\": null,\n            \"pocsDiscountPct\": 0,\n            \"pocsExptdPriceAmt\": 78000,\n            \"pocsExtdAmt\": 936000,\n            \"pocsItemLocCode\": null,\n            \"pocsItmCode\": \"WA\",\n            \"pocsItmName\": \"Test  A\",\n            \"pocsJobName\": null,\n            \"pocsPhsName\": null,\n            \"pocsCatName\": null,\n            \"pocsLumpSumPoFlag\": null,\n            \"pocsOrdQty\": 12,\n            \"pocsOvrdExptdPriceFlag\": \"N\",\n            \"pocsPoItemType\": \"N\",\n            \"pocsPoOrdQty\": null,\n            \"pocsPoOrderedQty\": null,\n            \"pocsPoPriceAmt\": null,\n            \"pocsPobldLineNum\": null,\n            \"pocsRecIntoInvFlag\": \"N\",\n            \"pocsSuggestedPrice\": null,\n            \"pocsTax1Code\": null,\n            \"pocsTax1TaxableFlag\": \"Y\",\n            \"pocsTax2Code\": null,\n            \"pocsTax2TaxableFlag\": \"Y\",\n            \"pocsTax3Code\": null,\n            \"pocsTax3TaxableFlag\": \"Y\",\n            \"pocsTaxAmt\": 0,\n            \"pocsTotAmt\": 936000,\n            \"pocsUserField1\": \"ZZ\",\n            \"pocsUserField2\": \"00\",\n            \"pocsUserField3\": \"1000.100\",\n            \"pocsUserField4\": null,\n            \"pocsUserField5\": null,\n            \"pocsUserField6\": null,\n            \"pocsUserField7\": null,\n            \"pocsUserField8\": null,\n            \"pocsUserTypeCode\": \"G\",\n            \"pocsWmCode\": \"G\",\n            \"pocsTavCode1\": null,\n            \"pocsTavCode2\": null,\n            \"pocsTavCode3\": null,\n            \"pocsTavCode4\": null,\n            \"pocsWbsvCode1\": null,\n            \"pocsWbsvCode2\": null,\n            \"pocsWbsvCode3\": null,\n            \"pocsWbsvCode4\": null,\n            \"pocsWbsvCode5\": null,\n            \"pocsWbsvCode6\": null,\n            \"pocsWbsvCode7\": null,\n            \"pocsWbsvCode8\": null,\n            \"pocsWbsvCode9\": null,\n            \"pocsWbsvCode10\": null,\n            \"pocsWbsvCode11\": null,\n            \"pocsWbsvCode12\": null,\n            \"pocsIuCreateDate\": \"2026-08-19T19:04:43-04:00\",\n            \"pocsIuUpdateDate\": null\n        }\n    ]\n}"
string